Companies › EIX

EIX 10-K & 10-Q changes, risk factors and insider trading

Edison International · NYSE · Electric Services · CIK 827052 · All filings on SEC.gov

Everything below is quoted or computed from Edison International's public SEC filings. It is not a recommendation to buy or sell. Automated comparisons can contain errors; confirm with the original filing.

At a glance

0 / 0risk-factor paragraphs added / removed in latest 10-K
0new risk-factor headings
0Form 4 filings reporting open-market purchases (last 180 days)
2Form 4 filings reporting open-market sales (last 180 days)

Jump to: Annual report (10-K) · Quarterly report (10-Q) · Insider transactions · 13F holders

What changed in the latest 10-K

Comparing 10-K filed 2026-02-18 (period ending 2025-12-31) with 10-K filed 2025-02-27 (period ending 2024-12-31).

Risk Factors (10-K Item 1A)

0new paragraphs
0removed paragraphs
20reworded paragraphs
6,945 → 7,070words in section

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

Reworded topics: liquidity

Paragraph as it now reads, with added and removed wording marked:

Climate change has caused, and exacerbated, extreme weather events and wildfires in southern California, and wildfires could cause, among other things, public safety issues, property damage and operational issues. In addition, the risk of flooding and debris flows occurring as a result of rain may be heightened. For example, the Eaton Fire that ignited in Los Angeles County in January 2025 resulted in loss of life, property damage and loss of service and subsequent extreme weather events such as increased rain or flooding could further impact the affected areas. If reimbursements from the Wildfire Fund for eligible claims related to the Eaton Fire are received later than projected, SCE could experience short‑term liquidity pressure, which may adversely affect SCE’s cash flows and liquidity position. For more information on liabilities related to wildfire events, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
see in full comparison
Reworded topics: regulation

Paragraph as it now reads, with added and removed wording marked:

In addition, existingExisting regulations may be revised or re-interpreted and new laws and regulations may be adoptedadopted, via the public initiative or legislative process, or become applicable to SCE, or its facilities or operations, in a manner that may have a detrimental effect on SCE's business or result in significant additional costs. In addition, regulations adopted via the public initiative or legislative process may apply to SCE, or its facilities or operations, in a manner that may have a detrimental effect on SCE's business or result in significant additional costs.
see in full comparison
Reworded

Paragraph as it now reads, with added and removed wording marked:

SCE will face a higher likelihood of catastrophic wildfires in its service area if it cannot effectively implement its WMPs. For example, SCE may not be able to effectively implement its WMPs if it experiences unanticipated difficulties relative to permitting delays, sourcing, engaging, and retaining effectively trained contract workers or procuring materials it needs to fulfill its mitigation obligations under the WMPs. In addition, if SCE does not have an approved WMP, SCE will not be issued a safety certification from the CPUC and will consequently not benefit from the presumption of prudency or the AB 1054 Liability Cap. Furthermore, approval of a WMP by the OEIS does not ensure that the CPUC will authorize recovery of the associated costs. If the CPUC denies or limits cost recovery for work needed to execute an approved WMP, SCE may be required to absorb those costs or may need to reduce the scope or timing of its mitigation activities. For more information about the WMP process, see "Business—Southern California Wildfires— Safety Certification and Wildfire Mitigation Plan."
see in full comparison
Reworded

Paragraph as it now reads, with added and removed wording marked:

The CPUC or the FERC may not allow SCE to recover costs on the basis that such costs were not reasonably or prudently incurred or for other reasons. Further, SCE may incur expenses before the relevant regulatory agency approves the recovery of such costs. For example, SCE has incurred, and expects to further incur, wildfire mitigation expenses before it is clear whether such costs will be recoverable from customers. Also, the CPUC may deny recovery of costs incurred by SCE, including uninsured wildfire-related costs, if the CPUC determines that SCE was not prudent. For further information on recovery of uninsured wildfire-related costs see "Business—Southern California Wildfires—Recovery of Wildfire-Related Costs" and "Management Overview—Southern California Wildfires and Mudslides" in the MD&A. In addition, while SCE supports California's environmental goals, it may be prevented from fully executing on its strategy to support such goals by regulatory delay or lack of approval of cost-recovery for the costs of such strategic actions and electrification programs from the relevant regulatory agencies, including as a result of customer affordability concerns. For example, in the 2025 GRC final decision, the CPUC issueddenied a50% decision denyingof SCE’s Buildingrequested upfront funding for its Transportation Electrification ProgramGrid Application,Readiness citing,program, amongciting otheruncertain things,market aconditions desireand toconsidering avoidintervenor increasingpositions, rates.many of which raised affordability concerns.
see in full comparison
Reworded

Paragraph as it now reads, with added and removed wording marked:

Edison International and SCE could be materially and adversely impacted by catastrophic, macroeconomic and geopolitical events, such as the effects of increased inflationary pressures and interest rates, potential economic downturns or recessions, geopolitical pressures, and pandemics and regional health emergencies. For example, the global spread of COVID-19, which was declared a pandemic by the World Health Organization in March 2020, created significant uncertainty, volatility and disruption globally that resulted in, among other things, disruption to supply chains, economies, and workforce and impacted the operations of Edison International and SCE. Additionally, the geopolitical developments involving the Russia-Ukraine conflict, China and the Middle East, could cause delays and disruptions in the supply chain and the availability and timely delivery of services, materials and components used in SCE’s operations. PoliticalGeopolitical changestensions followingcan also heighten cybersecurity risks, including the Unitedrisk Statesof presidentialmalicious electionactivity by state‑sponsored actors. For additional information regarding these cybersecurity threats, see “—Cybersecurity and Physical Security Risks.” Evolving U.S. and California governmental policies and regulatory initiatives could lead to changes in economic conditions or economic uncertainties in the State of California, United States and globally, including impacts to infrastructure investments, tariffs, taxes, and energy, environmental and social policies.
see in full comparison
Reworded

Paragraph as it now reads, with added and removed wording marked:

SCE's infrastructure is aging and could pose a risk to system reliability if not sufficiently maintained and expanded to meet load growth and electrification needs. In addition, as described above, natural disasters such as wildfires in SCE's service area can cause significant public safety issues, property damage and operational issues. SCE is engaged in a significant and ongoing infrastructure investment program. This investment program, which includes transmission projects and constructing utility owned storage to mitigate possible state-wide capacity shortages in 2025 and later years,shortages, has inherent operational risks and elevates the need for effective execution in SCE's activities. For example, utility owned storage facilities utilize lithium-ion battery technology that in certain circumstances can and have caused a thermal event that can ignite nearby materials, including other lithium-ion cells particularly when deployed in indoor facilities. SCE's financial condition and results of operations could be materially affected if it is unable to successfully manage these risks as well as the risks inherent in constructing, operating, and maintaining its facilities, the operation of which can be hazardous and important for system reliability. SCE's inherent operating risks include such matters as the risks of human performance,performance; availability of skilled workforce and workforce capabilities,capabilities; contractor management,management; data and records accuracy,accuracy; public opposition to infrastructure projects,projects; delays,delays; environmental remediation and mitigation costs,costs; difficulty in estimating costs or in recovering costs that are above original estimates,estimates; system limitations and degradation,degradation; unexpected cascading critical system failure; maintaining physical security of workforce and assets,assets; maintaining cybersecurity of data and assets,assets; and delays and interruptions in necessary supplies, including key components necessary for the timely construction of utility owned storage.supplies. For example, SCE's financial condition may be materially affected as a result of safety incidents, delays, permitting violations and violations of regulatory requirements, among other things, caused by SCE's failure to appropriately manage its contractor workforce or from contractual violations by SCE's contractors and the inability for SCE to recover through contractual indemnities or insurance held by the contractor. SCE's financial condition may also be materially affected as a result of data or records inaccuracies, for example, inaccurate records could lead to missing or delayed compliance with SCE's policies and regulatory requirements, and could contribute to safety incidents.
see in full comparison
Full comparison: every changed paragraph (20)

Green = added, red = removed. Unchanged paragraphs and tables are not shown. Read the complete text in the original filing.

Reworded

The CPUC or the FERC may not allow SCE to recover costs on the basis that such costs were not reasonably or prudently incurred or for other reasons. Further, SCE may incur expenses before the relevant regulatory agency approves the recovery of such costs. For example, SCE has incurred, and expects to further incur, wildfire mitigation expenses before it is clear whether such costs will be recoverable from customers. Also, the CPUC may deny recovery of costs incurred by SCE, including uninsured wildfire-related costs, if the CPUC determines that SCE was not prudent. For further information on recovery of uninsured wildfire-related costs see "Business—Southern California Wildfires—Recovery of Wildfire-Related Costs" and "Management Overview—Southern California Wildfires and Mudslides" in the MD&A. In addition, while SCE supports California's environmental goals, it may be prevented from fully executing on its strategy to support such goals by regulatory delay or lack of approval of cost-recovery for the costs of such strategic actions and electrification programs from the relevant regulatory agencies, including as a result of customer affordability concerns. For example, in the 2025 GRC final decision, the CPUC issueddenied a50% decision denyingof SCE’s Buildingrequested upfront funding for its Transportation Electrification ProgramGrid Application,Readiness citing,program, amongciting otheruncertain things,market aconditions desireand toconsidering avoidintervenor increasingpositions, rates.many of which raised affordability concerns.

Reworded

The Wildfire Insurance Fund and other provisions of ABthe 1054California Wildfire Legislation may not be sufficient or effectively mitigate the significant risk faced by California investor-owned utilities related to liability for damages arising from catastrophic wildfires where utility facilities are a substantial cause, which could have a detrimental effect on SCE's business and financial condition. The effectiveness of ABthe 1054California Wildfire Legislation to mitigate the wildfire-related risk faced by SCE is conditioned in part on the performance of OEIS and various entities formed under AB 1054 and related legislation to, among other things, administer the Wildfire Insurance Fund, approve WMPs, issue safety certifications, oversee and enforce compliance with wildfire safety standards, and develop metrics to reduce risk and measure compliance with risk reduction.

Reworded

In addition, existingExisting regulations may be revised or re-interpreted and new laws and regulations may be adoptedadopted, via the public initiative or legislative process, or become applicable to SCE, or its facilities or operations, in a manner that may have a detrimental effect on SCE's business or result in significant additional costs. In addition, regulations adopted via the public initiative or legislative process may apply to SCE, or its facilities or operations, in a manner that may have a detrimental effect on SCE's business or result in significant additional costs.

Reworded

Severe wildfires and urban development in and near high fire risk areas in California have given rise to large damage claims against California utilities for fire-related losses alleged to be the result of utility practices and/or the failure of electric and other utility equipment. Catastrophic wildfires can occur in SCE's service area even if SCE effectively implements its WMPs. California courts have previously found utilities to be strictly liable for property damage, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. An inability to recover uninsured wildfire-related costs could materially affect SCE's business, financial condition and results of operations. For example, if SCE is unable to, or believes that it may be unable to, recover damages related to catastrophic wildfires through insurance, the Wildfire Insurance Fund (which is only available for fires ignited after July 12, 2019) or electric rates, or access the bank and capital markets on reasonable terms, SCE may not have sufficient cash or equity to pay dividends or may be restricted from declaring such dividends because it does not meet CPUC or California law requirements related to the declaration of dividends. For information on the California law requirements on the declaration of dividends, see "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—SCE Dividends." Also see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."

Reworded

Edison International's and SCE's costs of accessing capital markets hashave increased due to the risks associated with wildfires in Southern California. Edison International's and SCE's access to the bank and capital markets could also be constrained and/or the costs of accessing those markets could increase further as a result of wildfire risk, including if Edison International's and/or SCE's credit ratings are downgraded or placed on negative watch due to concerns about Edison International and/or SCE's financial health as a result of wildfires.

Reworded

SCE may not be able to recover uninsured losses (including amounts paid for self-insured retention and co-insurance) in electric rates. Additionally, SCE’s contractors may experience coverage reductions and/or increased wildfire insurance costs in future years. For losses associated with claims occurring before the authorization of SCE’s CPUC-authorized customer-funded self-insurance program, no assurance can be given that losses will not exceed the limits of SCE's or its contractors' insurance coverage. Losses which are not fully insured or cannot be recovered from contractors, through the Wildfire Insurance Fund or electric rates, including any such losses that exceed funds available through the Wildfire Insurance Fund and are ultimately not authorized to be recovered through rates, could materially affect Edison International's and SCE's financial condition and results of operations. For more information on wildfire insurance risk, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."

Reworded

SCE will face a higher likelihood of catastrophic wildfires in its service area if it cannot effectively implement its WMPs. For example, SCE may not be able to effectively implement its WMPs if it experiences unanticipated difficulties relative to permitting delays, sourcing, engaging, and retaining effectively trained contract workers or procuring materials it needs to fulfill its mitigation obligations under the WMPs. In addition, if SCE does not have an approved WMP, SCE will not be issued a safety certification from the CPUC and will consequently not benefit from the presumption of prudency or the AB 1054 Liability Cap. Furthermore, approval of a WMP by the OEIS does not ensure that the CPUC will authorize recovery of the associated costs. If the CPUC denies or limits cost recovery for work needed to execute an approved WMP, SCE may be required to absorb those costs or may need to reduce the scope or timing of its mitigation activities. For more information about the WMP process, see "Business—Southern California Wildfires— Safety Certification and Wildfire Mitigation Plan."

Reworded

For more information on ABthe 1054,presumption of prudency and the Liability Cap, see "Business—Southern California Wildfires—Recovery of Wildfire-Related Costs—2019 California Wildfire Legislation."

Reworded

SCE will not benefit from all of the features of ABthe 1054California Wildfire Legislation if the Wildfire Insurance Fund is exhausted.

Reworded

Catastrophic wildfires could rapidly exhaust the Wildfire Insurance Fund and SCE will not be reimbursed by the Wildfire Insurance Fund or benefit from the AB 1054 Liability Cap if the fund has been exhausted as a result of damage claims previously incurred by SCE or the other participating utilities. AB 1054 does not have a mechanism for adding to or replenishing the Wildfire Insurance Fund.

Reworded

For more information on ABthe 1054,California Wildfire Legislation , see "Business—Southern California Wildfires and Mudslides—Recovery of Wildfire-Related Costs—2019California Wildfire Legislation."

Reworded

Climate change has caused, and exacerbated, extreme weather events and wildfires in southern California, and wildfires could cause, among other things, public safety issues, property damage and operational issues. In addition, the risk of flooding and debris flows occurring as a result of rain may be heightened. For example, the Eaton Fire that ignited in Los Angeles County in January 2025 resulted in loss of life, property damage and loss of service and subsequent extreme weather events such as increased rain or flooding could further impact the affected areas. If reimbursements from the Wildfire Fund for eligible claims related to the Eaton Fire are received later than projected, SCE could experience short‑term liquidity pressure, which may adversely affect SCE’s cash flows and liquidity position. For more information on liabilities related to wildfire events, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."

Reworded

Weather-related incidents and other natural disasters can lead to lost revenue and increased expense,costs, including higher maintenance and repair costs, which SCE may not be able to recover from its customers. These incidents can also result in regulatory penalties and disallowances, particularly if SCE encounters difficulties in restoring power to its customers on a timely basis or if fire-related losses are found to be the result of utility practices and/or the failure of electric and other utility equipment. In addition, these occurrences could lead to significant claims for damages, including for loss of life and property damage. These occurrences could materially affect SCE's business, financial condition and results of operations, and the inability to restore power to SCE's customers could also materially damage the business reputation of SCE and Edison International.

Reworded

SCE's infrastructure is aging and could pose a risk to system reliability if not sufficiently maintained and expanded to meet load growth and electrification needs. In addition, as described above, natural disasters such as wildfires in SCE's service area can cause significant public safety issues, property damage and operational issues. SCE is engaged in a significant and ongoing infrastructure investment program. This investment program, which includes transmission projects and constructing utility owned storage to mitigate possible state-wide capacity shortages in 2025 and later years,shortages, has inherent operational risks and elevates the need for effective execution in SCE's activities. For example, utility owned storage facilities utilize lithium-ion battery technology that in certain circumstances can and have caused a thermal event that can ignite nearby materials, including other lithium-ion cells particularly when deployed in indoor facilities. SCE's financial condition and results of operations could be materially affected if it is unable to successfully manage these risks as well as the risks inherent in constructing, operating, and maintaining its facilities, the operation of which can be hazardous and important for system reliability. SCE's inherent operating risks include such matters as the risks of human performance,performance; availability of skilled workforce and workforce capabilities,capabilities; contractor management,management; data and records accuracy,accuracy; public opposition to infrastructure projects,projects; delays,delays; environmental remediation and mitigation costs,costs; difficulty in estimating costs or in recovering costs that are above original estimates,estimates; system limitations and degradation,degradation; unexpected cascading critical system failure; maintaining physical security of workforce and assets,assets; maintaining cybersecurity of data and assets,assets; and delays and interruptions in necessary supplies, including key components necessary for the timely construction of utility owned storage.supplies. For example, SCE's financial condition may be materially affected as a result of safety incidents, delays, permitting violations and violations of regulatory requirements, among other things, caused by SCE's failure to appropriately manage its contractor workforce or from contractual violations by SCE's contractors and the inability for SCE to recover through contractual indemnities or insurance held by the contractor. SCE's financial condition may also be materially affected as a result of data or records inaccuracies, for example, inaccurate records could lead to missing or delayed compliance with SCE's policies and regulatory requirements, and could contribute to safety incidents.

Reworded

The costs of decommissioning San Onofre are subject to reasonableness reviews by the CPUC. These costs may not be recoverable through regulatory processes or otherwise unless SCE can establish that the costs were reasonably incurred. In addition, SCE faces inherent execution risks including such matters as the risks of human performance, workforce capabilities, public opposition, permitting delays, governmental approvals, and governmentalforce approvals.majeure events. Decommissioning costs ultimately incurred could exceed the current estimates and cost increases resulting from contractual disputes, delays in performance by DCG,DGC, elevated levels of inflation, or permitting delays, or force majeure events, among other things, could cause SCE to materially overrun current decommissioning cost estimates and could materially impact the sufficiency of trust funds. See "Liquidity and Capital Resources—SCE—Decommissioning of San Onofre" in the MD&A.

Reworded

SCE owns and operates the water distribution system that serves Catalina Island, California and a propane gas distribution system that serves the City of Avalon on Catalinathe Island, California.island. Production, storage, treatment and distribution of water for human use and the transportation, storage, distribution and use of gas can be hazardous, and can cause damage to private property and the environment and injury to employees and the general public if equipment fails or does not perform as anticipated. For example, the risks of operating a water distribution system include the potential for burst pipes and water contamination and the risks of operating gas distribution system include the potential for gas leaks, fire or explosion. The risks related to SCE's operation of its water and gas distribution systems may be exacerbated due to aging infrastructure. SCE has, in the past, requested that the CPUC allow SCE to include certain water system costs in electric rates and may make similar requests for the water and gas systems in the future. If such requests are denied, significant costs may not be recoverable from customers. In addition, SCE may have to pay fines, penalties and remediation costs if it does not comply with laws and regulations in the operation of the water and gas distribution systems. An inability to recover costs associated with any such damages or injuries or any fines, penalties or remediation costs, from insurance or through electric rates, could materially affect SCE's business, financial condition and results of operations.

Reworded

Customer-owned generation and load departures to CCAs or Electric Service Providers each reduce the amount of electricity that customers purchase from utilities and have the effect of increasing utility rates unless customer rates are designed to allocate the costs of the distribution grid across all customers that benefit from its use. For example, some customers in California who generate their own power are not currently required to pay all transmission and distribution charges and non-bypassable charges, subject to limitations, which results in increased costs for other customers. If there are notno updates in regulations to further support the need for customers to pay their share of transmission and distribution costs and non-bypassable charges, for example through a higher fixed charge, and the demand for electricity reduces so significantly that SCE is no longer effectively able to recover such costs from its customers, SCE's business, financial condition and results of operations will be materially impacted.

Reworded

Edison International and SCE systems, assets and personnel are targets for physical and cyber attacks. Regulators such as NERC and U.S. Government agencies, including the Departments of Defense, Homeland Security, and Energy, have increasingly stressed that threat sourcessources, including nation-state actors, continue to seek to identify and exploit vulnerabilities in the U.S. national electric grid and other critical energy infrastructures, and that such attacks and disruptions, both physical and cyber, are highly sophisticated and dynamic. Several U.S. Government agencies have highlighted the increasing risks related to physical and cybersecurity attacks, including ransomware attacks, related to the electric sector, including its supply chain, and that the risks may escalate during periods of heightened geopolitical tensions.

Reworded

SCE interacts with a wide array of third parties and depends on vendors to provide it with products and services. These products and services may contain vulnerabilities and could require patching which could cause disruptions to SCE's operations. Malicious actors may attack vendors to disrupt the services they provide to SCE, or to use those vendors as a conduit to attack SCE. SCE system data and architecture are also disclosed, either voluntarily or by mandate, to third parties and the public by regulators, employees, contractors, and vendors. This system data may be used by malicious actors to understand SCE’s systems to prepare for a cyber or physical attack.

Reworded

Edison International and SCE could be materially and adversely impacted by catastrophic, macroeconomic and geopolitical events, such as the effects of increased inflationary pressures and interest rates, potential economic downturns or recessions, geopolitical pressures, and pandemics and regional health emergencies. For example, the global spread of COVID-19, which was declared a pandemic by the World Health Organization in March 2020, created significant uncertainty, volatility and disruption globally that resulted in, among other things, disruption to supply chains, economies, and workforce and impacted the operations of Edison International and SCE. Additionally, the geopolitical developments involving the Russia-Ukraine conflict, China and the Middle East, could cause delays and disruptions in the supply chain and the availability and timely delivery of services, materials and components used in SCE’s operations. PoliticalGeopolitical changestensions followingcan also heighten cybersecurity risks, including the Unitedrisk Statesof presidentialmalicious electionactivity by state‑sponsored actors. For additional information regarding these cybersecurity threats, see “—Cybersecurity and Physical Security Risks.” Evolving U.S. and California governmental policies and regulatory initiatives could lead to changes in economic conditions or economic uncertainties in the State of California, United States and globally, including impacts to infrastructure investments, tariffs, taxes, and energy, environmental and social policies.

Management's Discussion & Analysis (MD&A) (10-K Item 7)

117new paragraphs
128removed paragraphs
96reworded paragraphs
20,145 → 18,845words in section

New heading “Impact of 2025 GRC”

New heading “Wildfire-related Claims, Net of Recoveries”

New heading “Asset Impairment”

New heading “Income Tax Expense”

New heading “NextGen Enterprise Resource Planning ("ERP") Program”

New heading “The One Big Beautiful Bill Act of 2025”

Removed heading “2025 General Rate Case”

Removed heading “Wildfire-related Claims, Net of Insurance Recoveries”

Removed heading “Wildfire Insurance Fund Expense”

Removed heading “Operating Revenue”

Removed heading “Purchased Power and Fuel”

Removed heading “Operation and Maintenance”

Removed heading “Wildfire-related Claims, Net of Insurance Recoveries”

Removed heading “Depreciation and Amortization”

Removed heading “Property and Other Taxes”

Removed heading “Impairment, net of other operating income”

Removed heading “Interest Expense”

Removed heading “Preference Stock Dividend Requirements”

Removed heading “2020 Emergency Wildfire Restoration”

Removed heading “Multi-year Wildfire Mitigation and Catastrophic Events Filing ("WMCE Filing")”

Removed heading “ERRA Trigger Application”

Removed heading “Utility Owned Storage Projects”

Removed heading “Application to post-AB-1054 Other Wildfire Events”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

New text topics: investigation, fine, penalt, regulation
“The Los Angeles County Fire Department is leading the investigation into the origin and cause of the Eaton Fire, with the assistance of CAL FIRE, and has identified a preliminary area of origin of the fire. SCE has transmission facilities in the preliminary area of origin and the SED is conducting an investigation with respect to the Eaton Fire. Edison International and SCE are also aware of an ongoing investigation by the Los Angeles District Attorney's Office of the Eaton Fire for the purpose of determining whether any criminal violations have occurred. …”
see in full comparison
New text topics: investigation, downgrade, credit rating
“SCE's credit ratings may be affected by various factors. These include, but are not limited to, failure by regulators to successfully implement the California Wildfire Legislation in a consistent and credit supportive manner, or investigations into wildfire events or associated settlements result in material utility liability exposure, particularly in the absence of broader credit-supportive legislative actions to mitigate SCE's wildfire risk, including those to be recommended under SB 254 in a report due April 1, 2026. …”
see in full comparison
Removed text topics: downgrade, credit rating
“SCE's credit ratings may be affected if, among other things, regulators fail to successfully implement AB 1054 in a consistent and credit supportive manner, or the Wildfire Insurance Fund is materially depleted, or a persistent increase in the frequency of severe wildfires in California leads the credit rating agencies to believe the Wildfire Insurance Fund is at risk of a material depletion. Credit rating downgrades increase the cost and may impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, bond financings or other borrowings. …”
see in full comparison
Removed text topics: impairment
“Impairment, net of other operating income”
see in full comparison
New text topics: downgrade, credit rating
“Furthermore, SCE may be required to post collateral for workers' compensation in excess of standard formula amounts, currently up to $115 million, in the event of volatile credit rating conditions, during which the Office of Self-Insurance Plans, which oversees workers' compensation self-insurance within California, may exercise discretion to impose higher collateral requirements. SCE posted $12 million under such discretionary authority in the second quarter of 2025. …”
see in full comparison
New text topics: downgrade, credit rating
“Following the passage of SB 254 in September 2025, Moody's reaffirmed SCE's long-term issuer credit rating and outlook, and Fitch also reaffirmed SCE's credit rating and revised its outlook from ratings watch negative to stable. However, S&P downgraded SCE's long-term issuer credit rating. For further details on SB 254, see "Business—Southern California Wildfires—Recovery of Wildfire-Related Costs—California Wildfire Legislation." The following table summarizes SCE's current long-term issuer credit ratings and outlook from the major credit rating agencies as of February 11, 2026:”
see in full comparison
Full comparison: every changed paragraph (341)

Green = added, red = removed. Unchanged paragraphs, 28 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

Edison International's earnings are prepared in accordance with GAAP. Management uses core earnings (loss) internally for financial planning and for analysis of performance. Core earnings (loss) are also used when communicating with investors and analysts regarding Edison International's earnings results to facilitate comparisons of the company's performance from period to period. Core earnings (loss) are a non-GAAP financial measure and may not be comparable to those of other companies. Core earnings (loss) are defined as earnings attributableavailable to Edison International shareholders less non-core items. Non-core items include income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as write downs, asset impairments and other income and expense related to changes in law, outcomes in tax, regulatory or legal proceedings, and exit activities, including sale of certain assets and other activities that are no longer continuing.

Reworded

Beginning July 1, 2023, SCE implemented a customer-funded wildfire self-insurance program.program in July 2023. With the commencement of this program, Edison International and SCE no longer consider claims-relatedwildfire-related claim losses for wildfires to be representative of ongoing earnings and treat such costs as non-core items.

Removed

1Charges of $4 million and $6 million related to claims from wildfires ignited prior to July 1, 2023 were included in core earnings in 2023 and 2022, respectively. Core earnings in periods before the third quarter of 2023 have not been recast to exclude these charges.

Reworded

2SCE1SCE and Edison International Parent and Other non-core items are tax-effected at an estimated statutory rate of approximately 28%; customerwildfire revenuesclaims (claims)insured forby EIS insurance contract are tax-effected at the federal statutory rate of 21%.

Reworded

Edison International's 20242025 earnings increased $87$3,175 million, driven by an increase in SCE's earnings of $145$3,270 million, partially offset by an increase in Edison International Parent and Other loss of $58$95 million. SCE's higher net income consisted of $97$679 million of higher core earnings and $48$2,591 million of lowerhigher non-core loss.earnings. Edison International Parent and Other's higher net loss consisted of $22$59 million of higher core loss and $36 million of lowerhigher non-core earnings.loss.

Added

In January and December 2025, the CPUC approved the TKM Settlement Agreement and the Woolsey Settlement Agreement, respectively. As a result, in the year ended 2025, SCE recorded cost recoveries through CPUC electric rates authorized under both the TKM Settlement Agreement and the Woolsey Settlement Agreement. These cost recoveries are reflected either as core earnings or non-core items, as discussed below. This classification is consistent with the original classification when the respective costs were incurred.

Reworded

The increase in SCE's core earnings in 2025 was primarily due to higher revenue authorizedfrom inthe Track2025 4GRC final decision and ana benefit to interest expense related to cost recoveries authorized under the TKM and Woolsey Settlement Agreements. The increase in theEdison authorizedInternational rateParent ofand returnOther's resultingcore fromloss thein cost2025, ofwas capitalprimarily adjustmentdue mechanism, partially offset byto higher interest expense.expense and preferred stock redemption loss.

Removed

The increase in Edison International Parent and Other's core loss was primarily due to higher interest expense.

Added

•2017/2018 Wildfire/Mudslide Events claims and expenses, net of recoveries:

Added

•Net earnings recorded in 2025 related to the TKM Settlement Agreement, including ongoing legal expenses: $1,341 million ($966 million after-tax) of claim costs and $55 million ($40 million after-tax) of legal expenses authorized for recovery, partially offset by shareholder-funded wildfire mitigation expenses of $50 million ($36 million after-tax) and impairment of incremental restoration-related assets of $8 million ($6 million after-tax).

Added

•Net earnings recorded in 2025 related to the Woolsey Settlement Agreement, including ongoing legal expenses: $1,603 million ($1,154 million after-tax) of claim costs and $35 million ($25 million after-tax) of legal expenses authorized for recovery, partially offset by impairment of incremental restoration-related assets of $10 million ($7 million after-tax).

Removed

•Charges of $493 million ($355 million after-tax) recorded in 2024 and $634 million ($457 million after-tax) recorded in 2023 for 2017/2018 Wildfire/Mudslide Events claims and related legal expenses, net of expected FERC recoveries. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.

Removed

•Charges of $162 million ($117 million after-tax) recorded in 2024 and $34 million ($25 million after-tax) recorded in 2023 for wildfire claims and related legal expenses, net of expected insurance and regulatory recoveries, related to the Other Wildfire Events. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.

Removed

•Charges of $146 million ($105 million after-tax) recorded in 2024 and $213 million ($153 million after-tax) recorded in 2023 from the amortization of SCE's contributions to the Wildfire Insurance Fund. See "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies" for further information.

Removed

•Severance costs of $50 million ($36 million after-tax), net of expected FERC recovery, recorded in 2024 due to current and probable reductions in workforce. See "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies" for further information.

Removed

•A charge of $30 million ($21 million after-tax) recorded in 2023 for a disallowance related to the 2021 NDCTP. See "Liquidity and Capital Resources—SCE—Decommissioning of San Onofre" for more information.

Reworded

•A chargeCharges of $17$5 million ($12$3 million after tax) recorded in 2025, and $493 million ($355 million after-tax) recorded in 20232024, related to customerclaim cancellationscosts and related legal expenses, net of certainexpected ECSregulatory data services.recoveries.

Added

See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.

Added

•Eaton Fire claims and expenses:

Added

•Charges of $15 million ($11 million after tax) recorded in 2025 primarily from the shareholder contribution related to SCE's customer-funded self-insurance coverage and legal and other expenses.

Added

See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.

Added

•Other Wildfire Events claims and expenses, net of recoveries:

Added

•Charges of $1 million ($1 million after-tax) recorded in 2025 consisted of $15 million of legal expenses, net of expected regulatory recoveries, partially offset by $14 million of insurance reimbursements for costs incurred in previous years.

Added

•Charges of $162 million ($117 million after-tax) recorded in 2024 for wildfire claims and related legal expenses, net of expected insurance and regulatory recoveries.

Added

See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.

Added

•Charges of $144 million ($104 million after-tax) recorded in 2025 and $146 million ($105 million after-tax) recorded in 2024 from the amortization of SCE's contributions to the Wildfire Fund. See "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies" for further information.

Added

•Net charges of $76 million ($39 million after-tax) recorded in 2025, primarily related to the impairment of utility property, plant and equipment associated with historical capital expenditures disallowed in SCE's 2025 GRC final decision. See "Results of Operations —Impact of 2025 GRC" for further information.

Added

•Severance costs of $50 million ($36 million after-tax), net of expected FERC recovery, recorded in 2024 due to reductions in workforce.

Removed

•Insurance recovery of $10 million ($7 million after-tax) recorded in 2023, related to settlement of an employment litigation matter. SCE and Edison International settled the matter following an atypical jury award.

Reworded

•Expected wildfire claimsCharges of $50 million ($39 million after-tax) recorded in 2025 and $4 million ($3 million after-tax) insured by EIS recorded in 20242024, and net earnings of $42 million ($33 million after-tax) recorded in 2023,both related to customer revenues for an EIS insurance contract offset by expected wildfire claims insured by EIS. See "Notes to Consolidated Financial Statements— Note 12. Commitments and Contingencies" See "Results of Operations" for discussionfurther of SCE and Edison International Parent and Other results of operations.information.

Added

See "Results of Operations" for discussion of SCE and Edison International Parent and Other results of operations.

Reworded

The electric power industry is undergoing urgent and fundamental changes toin how energy infrastructure is planned and built, driven by: state government actions to reduce GHG emissions; new sources of demand, such as electric vehicles, data centers, and building electrification; and technological innovations that support clean energy adoption, such as distributed generation and energy storage.storage; and government actions to reduce GHG emissions. These factors, coupled with the increasing impacts of climate change, are altering the way in which electricity is generated and delivered. TheThese impacts of climate changechanges are apparentfurther amplified by rapidly rising electricity demand across the U.S. economy, which is reshaping investment needs and accelerating. In 2024, the Earth experienced its hottest year on record. This spike in temperature is making extreme weather events commonplace. In California alone, climate-related disasters have cost the state tens of billions of dollars since 2018, with the 2025 wildfires being particularly devastating. Climate change is expected to have far-reaching effects on society, necessitating industry-wide solutions to enhance grid resilienceplanning and support a clean, reliable and affordable grid.timelines.

Removed

California is committed to reducing its GHG emissions, improving local air quality and supporting continued economic growth. The state codified into law goals to reduce GHG emissions by 40% from 1990 levels by 2030 and 85% from the same baseline by 2045, as well as to be carbon neutral by 2045. State and local air quality plans also call for substantial improvements including reducing smog-causing nitrogen oxides 90% below 2010 levels by 2032 in the most polluted areas of the state.

Removed

While these policy goals cannot be achieved by the electric sector alone, the electric grid is a critical enabler of the adoption of energy technologies that support California's GHG reduction objectives. California has set RPS targets which require California retail sellers of electricity to provide 60% of power from renewable resources by 2030. California also requires sellers of electricity to deliver 100% of retail sales from carbon-free sources by 2045, including interim targets of 90% by 2035 and 95% by 2040. In 2024, approximately 46% of SCE's customer deliveries came from carbon-free resources. SCE continues to make progress towards meeting its long-term RPS and carbon-free power goals and interim targets. In addition, Edison International is committed to achieving net-zero GHG emissions by 2045, in alignment with economy-wide climate actions planned by California. This commitment covers the power SCE delivers to customers and Edison International's enterprise-wide operations. To further support these goals, Edison International and SCE are investing in building a more resilient grid to reduce climate- and weather-related vulnerabilities. Since 2018, SCE has been adapting to climate change through system hardening to reduce wildfire risk. In its 2025 GRC, SCE proposed climate adaptation investments to address wildfire and physical risks that could occur by 2030.

Reworded

Edison International believes that California's 2045 goals can be achieved most economically through emissions reductions enabled by clean electricity to serve 100% of retail sales, electrifying approximately 90% of light-duty vehicles, 90% of medium-duty vehicles, 54% of heavy-duty vehicles, 80% of buses and 95% of buildings. Additionally, reducing emissions to near zero in the electric sector hinges on developing clean firm resources to replace natural gas. Clean firm resources, such as next-generation geothermal, small modular reactors, natural gas with carbon capture and storage, and clean hydrogen, produce constant power through any weather conditions or season with little or no greenhouse gas emissions. By 2045,Rising electricity demand is projected to increase by at least 80% as compared to 2022 per Edison International's analysis. In SCE’s service area,across the increaseU.S. ineconomy is a primary force reshaping grid needs and investment planning. SCE projects electricity demand isto materializingnearly soonerdouble thanbetween expected.2025 SCE’sand most2045, recent 10-year load growth forecast has increaseddriven by 35% compared to its 2022 distribution system plan. The key drivers of this increase are commercial developments, transportation electrification, and new residential housing.housing, and increases in commercial and industrial consumption. These economy-wide trends create broad customer and climate benefits by supporting long-term emissions reduction. Emerging market uncertainties, tighter resource timelines, and rising costs have increased the complexity of long‑term clean energy planning, adding pressure to California's climate goals. Despite this, California has demonstrated strong long-term support of transportation electrification as shown by the approval of SCE's Charge Ready programs and 2022 legislation banning sales of new gas vehicles by 2035. However,electrification. Edison International believes that more state policy support, along with public and private investment, is needed to enable California to reach its 2030 and 2045 GHG reduction targets. Additional policy and regulatory support is also needed to de-risk the development of clean firm resources, adjust planning processes to enable proactive grid build-out, and streamline permitting processes. The current federal administration has declared a national emergency on energy, stressing the need for a reliable, diversified, and affordable supply of energy. The integrity and expansion of energy infrastructure is an immediate and pressing priority.

Added

In parallel, climate change impacts continue to intensify the need for system resilience and clean‑energy adoption. The impacts of climate change are apparent and accelerating. In 2024, the Earth experienced its hottest year on record. This spike in temperature is making extreme weather events commonplace. In California alone, climate-related disasters have cost the state tens of billions of dollars since 2018, with the 2025 wildfires being particularly devastating. Climate change is expected to have far-reaching effects on society, necessitating industry-wide solutions to enhance grid resilience and support a clean, reliable and affordable grid.

Added

Recent federal actions have challenged clean energy standards and regulations in jurisdictions across the country. Rising customer cost pressures underscore the importance of enacting electricity policies and investment decisions that balance affordability while supporting a reliable and clean energy transition. California remains committed to reducing its GHG emissions, improving local air quality and supporting continued economic growth. The state codified into law goals to reduce GHG emissions by 40% from 1990 levels by 2030 and 85% from the same baseline by 2045, as well as to be carbon neutral by 2045. State and local air quality plans also call for substantial improvements including reducing smog-causing nitrogen oxides 90% below 2010 levels by 2032 in the most polluted areas of the state. State and local agencies continue to develop regulations that support the state's climate and clean air goals.

Added

While these policy goals cannot be achieved by the electric sector alone, the electric grid is a critical enabler of the adoption of energy technologies that support California's GHG reduction objectives. California has set RPS targets which require California retail sellers of electricity to provide 60% of power from renewable resources by 2030. California also requires sellers of electricity to deliver 100% of retail sales from carbon-free sources by 2045, including interim targets of 90% by 2035 and 95% by 2040. Using preliminary estimates based on information available as of February 11, 2026, approximately 61% of SCE's customer deliveries in 2025 came from carbon-free resources. SCE continues to make progress towards meeting its long-term RPS and carbon-free power goals and interim targets. In addition, Edison International is committed to achieving net-zero GHG emissions by 2045, in alignment with economy-wide climate actions planned by California. This commitment covers the power SCE delivers to customers and Edison International's enterprise-wide operations. To further support these goals, Edison International and SCE are investing in building a more resilient grid to reduce climate- and weather-related vulnerabilities. Since 2018, SCE has been adapting to climate change through system hardening to reduce wildfire risk. SCE continues to make grid hardening investments approved in SCE's 2025 GRC to address wildfire risks. SCE is conducting ongoing analysis for wildfire and other climate adaptation vulnerabilities that will be presented in its 2026 climate adaptation vulnerability assessment.

Added

Edison International believes that California's 2045 goals can be achieved most economically through emissions reductions enabled by clean electricity to serve 100% of retail sales, electrifying approximately 90% of light-duty vehicles, 90% of medium-duty vehicles, 54% of heavy-duty vehicles, 80% of buses and 95% of buildings. Additionally, reducing emissions to near zero in the electric sector relies on developing clean firm resources to replace natural gas. Clean firm resources, such as next-generation geothermal, small modular nuclear reactors, natural gas with carbon capture and storage, and clean hydrogen, produce constant power through any weather condition or season with little or no greenhouse gas emissions.

Reworded

Edison International's vision is to lead the transformation of the electric power industry and the company is focused on opportunities in delivering clean energy, advancing electrification, building a modernized and more reliable grid, and enabling customers' technology choices. SCE's ongoing focus to drive operational and service excellence is intended to allow it to achieve these objectives safely while controlling costs and customer rates. SCE expects its bundled system average rate will rise at or below a 2.6% compound annual growth rate fromequal 2024to or below inflation through 2028, which is near the projected rate of local inflation.2030. This projected rate growth incorporates the requested increases in SCE’s 2025 GRC,GRC approval and alsosettlement assumesof athe fullcost recovery ofproceedings costs associated withfor the 2017/2018 Wildfire/Mudslide Events (See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides" for further information, including TKM Settlementinformation). Partially offsetting these increases are historical costs rollingcoming out of rates and rising electricity consumption. SCE projects that, even as electricity bills increase over time, total energy costs for the average SCE household will be reduced by approximately 40% by 2045 due to the efficiencyadoption of energy-efficient electrified technologies among other drivers.

Reworded

SCE’s investments in the grid, utility owned storage capacity, and contracts for substantial new clean energy resources are key enablers of reliable economy-wide electrification. See "—Capital Program," "Liquidity and Capital Resources—Capital Investment Plan," and "Business—SCE—Purchased Power and Fuel Supply—CAISO Wholesale Energy Market" for further details. SCE also continues to implement its transportation electrification programs. As of December 31, 2024,2025, SCE had completed construction at 386572 sites to support 6,5209,761 charge ports under its suite of light-duty Charge Ready programs, and 99132 sites to support the electrification of 2,2512,859 medium and heavy-duty vehicles through its Charge Ready Transport program. SubjectMore than 85% of SCE's planned capital investments are in its distribution grid and are essential to regulatorymeeting approval,grid SCEreliability, plans to invest approximately $13 billion in infrastructure replacement between 2023resiliency, and 2028readiness to ensure the grid is reliable, resilient, and ready for widespread electrification. This represents approximately 30% of the capital plan for that same time period,objectives, as discussed in "—Capital Program."

Removed

2025 General Rate Case

Removed

SCE filed its 2025 GRC application with the CPUC in May 2023, for the four-year period of 2025 – 2028. In its application, SCE requested that the CPUC authorize a test year 2025 revenue requirement of approximately $10.3 billion. This represents a $1.9 billion, or 23%, increase over the approximately $8.4 billion 2024 revenue requirement adopted in Track 4, prior to adjustments for updated operations and maintenance escalation rates, the CPUC's decisions to adopt SCE's 2023 - 2025 cost of capital, and the expanded use of customer-funded self-insurance for wildfire-related claims.

Removed

In February 2024, intervenors to the 2025 GRC proceeding, including Cal Advocates and The Utility Reform Network ("TURN"), submitted testimony in response to SCE's application. Cal Advocates and TURN recommended reductions to SCE's requests for load growth investments, infrastructure replacement, targeted undergrounding of conductors, and other areas of SCE's application.

Removed

Cal Advocates in its testimony proposed a test year 2025 revenue requirement of approximately $9.3 billion, representing an increase of approximately 11% over the 2024 revenue requirement adopted in Track 4, before the adjustments described above. While TURN did not calculate a test year 2025 revenue requirement in connection with its proposals in its testimony, SCE estimates that TURN's proposals would result in a test year 2025 revenue requirement of approximately 12% over the 2024 revenue requirement adopted in Track 4, before the adjustments described above.

Removed

In June 2024, following amendments and other revisions to rebuttal testimony, SCE updated its 2025 revenue requirement request to $10.5 billion, and proposed post-test year revenue requirement increases of approximately $670 million, $750 million and $730 million in 2026, 2027, and 2028, respectively. The updated 2025 revenue requirement included a $220 million increase associated with the cost of capital adjustment authorized by the CPUC in a separate proceeding, which was subsequently modified by a CPUC decision in October 2024, as discussed in "—Cost of Capital."

Removed

In July 2024, the CPUC issued a decision approving SCE's request in the 2025 GRC to extend the customer-funded wildfire self-insurance through the 2025 GRC period.

Removed

In October 2024, the CPUC approved the establishment of a memorandum account to track changes in the revenue requirement between January 1, 2025, and the implementation date of the final decision. While SCE and certain parties have entered into stipulations to resolve certain contested areas in the 2025 GRC, SCE cannot predict the revenue requirement the CPUC will ultimately authorize or forecast the timing of a final decision. SCE expects to recognize revenue based on the 2024 authorized revenue requirement, adjusted to reflect the 2025 CPUC-authorized ROE as discussed in "—Cost of Capital," until a GRC decision is issued.

Reworded

Cost of Capital Application

Added

In December 2025, the CPUC issued a final decision on SCE's 2026 – 2028 cost of capital application that set SCE's ROE at 10.03%, and maintained SCE's current authorized capital structure, after CPUC-allowed exclusions, of 52% common equity, 43% long-term debt, and 5% preferred equity. Under the final decision, SCE's 2026 authorized cost of long-term debt and preferred equity are 4.71% and 6.89%, respectively. Based on the approved capital structure and costs, SCE's weighted average return on rate base for 2026 will be 7.59%. Based on the revenue requirement approved in SCE's 2025 GRC, the final decision will decrease SCE's revenue requirement in 2026 by approximately $51 million compared to the previously authorized cost of capital. The decision maintains the existing cost of capital adjustment mechanism. For information on the cost of capital adjustment mechanism, see "Business—SCE—Overview of Ratemaking Process."

Removed

The cost of capital adjustment mechanism set by the CPUC provides for an adjustment to SCE's authorized cost of capital that, when triggered, will impact SCE's results of operations and cash flows. In 2023, the cost of capital adjustment mechanism was triggered and resulted in an increase to SCE's CPUC-authorized ROE from 10.05% to 10.75% effective January 1, 2024. The resulting increase to SCE's 2024 GRC-related revenue requirement was $201 million. The cost of capital adjustment mechanism was not triggered in 2024. In October 2024, the CPUC issued a decision modifying the cost of capital adjustment mechanism that changed the mechanism's adjustment ratio from 50% to 20%. This modification was also applied to the increase that was most recently triggered in 2023, effective on January 1, 2025. As a result, SCE's 2025 CPUC-authorized ROE was adjusted to 10.33%. The decision reduces SCE's updated 2025 GRC-related revenue requirement by approximately $117 million. For further information, see "—2025 General Rate Case." For additional information on cost of capital and the ratemaking process, see "Business—SCE—Overview of Ratemaking Process—CPUC."

Removed

SCE expects to file its regularly scheduled cost of capital application in March 2025 for rates effective for 2026 – 2028.

Added

SCE's capital expenditure forecast has been updated to reflect planned CPUC-jurisdictional spending as informed by the 2025 GRC final decision and expected FERC capital expenditures.

Removed

In connection with the 2025 GRC, SCE forecasts capital expenditures of $26.6 billion to $31.5 billion for 2025 – 2028. In the absence of a 2025 GRC decision, SCE has developed, and is executing against, a capital expenditure plan that is expected to allow SCE to meet what is ultimately authorized in the 2025 GRC decision while minimizing the associated risk of unauthorized spending.

Reworded

The table below reflects forecast capital expenditures for 20252026 – 20282030, based on authorized and planned CPUC jurisdictionalCPUC-jurisdictional spending and current management expectations of FERC-jurisdictional spending. CPUC jurisdictionalCPUC-jurisdictional spending includes amounts requestedauthorized in the 2025 GRC, and other approvedplanned non-GRC CPUC capital spending. The forecast CPUC jurisdictional capital spending will be dependent upon amounts approved in the 2025 GRC. ForecastedForecast expenditures for FERC capital projects are subject to change due to factors such as timeliness of permitting, licensing, regulatory approvals, contractor bids, supply chain issuesissues, and other operational considerations.

Reworded

Based on management's judgment of potential capital spending variability informed by historical precedent of previously authorized amounts, potential permitting delays, and other operational considerations, a range case was prepared reflecting reductions to GRC capital expenditures, CPUC non-GRC capital expenditures,expenditures and FERC capital expenditures.

Added

SCE intends to file an application with the CPUC in the first quarter of 2026 requesting capital expenditures of at least $3 billion to be spent between 2026 through 2033 for an advanced metering infrastructure program that supports improved grid management and customer benefits. Approximately half of the capital expenditures are included in the table above.

Added

In addition, from 2022 to 2025, CAISO released its annual transmission plans approving projects to be constructed by SCE, with total anticipated capital expenditures of approximately $3 billion, of which approximately $1 billion is included in the table above. As part of its 2025-2026 Transmission Planning Process, CAISO is reassessing certain SCE projects from the 2022-2023 Transmission Plan and plans to provide its recommendation by May 2026.

Removed

In addition to the amounts presented in the table above, SCE expects to make additional CPUC capital investments, the recovery of which will be subject to future regulatory approval. This includes non-GRC programs including additional spending on an enterprise resource planning ("ERP") software implementation, an advanced metering infrastructure program and other potential investments in the grid supporting restoration, reliability, resilience and readiness. SCE expects the total expenditures of these programs to be at least $3 billion, some of which will be incurred beyond 2028. In the first half of 2025, SCE intends to file an application with the CPUC for approval of the ERP implementation and expects to include approximately $1 billion of capital expenditures through 2029.

Removed

In May 2023, the CAISO released its 2022 – 2023 Transmission Plan based on the CPUC's projections that more than 40 gigawatts of new resources need to be added in California by 2032. As the incumbent transmission owner for a portion of these transmission projects, SCE expects to construct projects requiring capital investment of at least $2.0 billion, most of which will be incurred beyond 2028. In May 2024, the CAISO released its 2023 – 2024 Transmission Plan which identified additional transmission projects expected to be constructed by SCE by 2030 with anticipated capital expenditures of approximately $80 million.

Showing the first 60 of 341 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

What changed in the latest 10-Q

Comparing 10-Q filed 2026-07-30 (period ending 2026-06-30) with 10-Q filed 2026-04-28 (period ending 2026-03-31).

Risk Factors (10-Q Part II, Item 1A)

We could not find a separate Risk Factors item in the latest 10-Q. Some companies leave it out of quarterly reports; see the annual 10-K risk factors and the original filing. Open the filing on SEC.gov.

Management's Discussion & Analysis (MD&A) (10-Q Part I, Item 2)

51new paragraphs
14removed paragraphs
64reworded paragraphs
7,014 → 8,340words in section

New heading “Depreciation and Amortization”

New heading “Six months ended June 30, 2026 versus June 30, 2025”

New heading “Operating Revenue”

New heading “Purchased Power and Fuel”

New heading “Operation and Maintenance”

New heading “Wildfire-related Claims, Net of Recoveries”

New heading “2021 GRC Wildfire Mitigation Memorandum Account Balance”

New heading “2027 FERC Formula Rate Annual Update”

Removed heading “Capital Expenditures”

Removed heading “Financing Order”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

Reworded topics: downgrade, credit rating

Paragraph as it now reads, with added and removed wording marked:

Additionally, a persistent increase in the frequency and severity of wildfires in CaliforniaCalifornia, or the absence of legislation or other measures that credit rating agencies view as sufficient to mitigate wildfire-related risks, may lead the credit rating agencies to reassess SCE's wildfire-related operational risk exposure or believe the Wildfire Fund is at risk of material depletion.depletion and therefore downgrade SCE's credit rating. Credit rating downgrades may increase the cost of debt and equity capital and may also impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, bond financingsfinancings, or other borrowings.borrowings, which could lead to higher customer rates over time. In addition, some of SCE's power procurement and energy contracts, environmental remediation obligations and workers' compensation self-insurance would require SCE to pay related liabilities or post additional collateral if SCE's credit rating were to fall below investment grade. For further details, see "—Margin and Collateral Deposits.Deposits" below.
see in full comparison
Reworded topics: downgrade, credit rating

Paragraph as it now reads, with added and removed wording marked:

Additionally, a persistent increase in the frequency and severity of wildfires in CaliforniaCalifornia, or the absence of legislation or other measures that credit rating agencies view as sufficient to mitigate wildfire-related risks, may lead the credit rating agencies to reassess Edison International Parent's wildfire-related operational risk exposure or believe the Wildfire Fund is at risk of material depletion.depletion and therefore downgrade Edison International Parent's credit rating. Credit rating downgrades may increase the cost of debt and capital and may also impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, note financingsfinancings, or other borrowings.borrowings, which could lead to higher customer rates over time.
see in full comparison
New text
“2021 GRC Wildfire Mitigation Memorandum Account Balance”
see in full comparison
New text
“Six months ended June 30, 2026 versus June 30, 2025”
see in full comparison
New text
“Wildfire-related Claims, Net of Recoveries”
see in full comparison
New text
“2027 FERC Formula Rate Annual Update”
see in full comparison
Full comparison: every changed paragraph (129)

Green = added, red = removed. Unchanged paragraphs, 8 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

Edison International is the ultimate parent holding company of SCESCE, and Edison Energy, LLC, doing business as Trio. SCEwhich is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity to an approximately 50,000 square mile area across Southern, CentralCentral, and Coastal California. Trio is a global energy advisory firm providing integrated sustainability and energy solutions to commercial, industrial and institutional customers. Trio's business activities are currently not material to report as a separate business segment.

Added

In the second quarter of 2026, Edison International completed the disposition of Trio, a former indirect wholly-owned subsidiary. Trio's business activities have not been material to Edison International. See "Results of Operations—Edison International Parent and Other—Trio" and "Notes to Condensed Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies" for further information.

Reworded

Edison International's earnings are prepared in accordance with GAAP. Management uses core earnings (loss) internally for financial planning and for analysis of performance. Core earnings (loss) are also used when communicating with investors and analysts regarding Edison International's earnings results to facilitate comparisons of the company's performance from period to period. Core earnings (loss) are a non-GAAP financial measure and may not be comparable to those of other companies. Core earnings (loss) are defined as earnings available to Edison International shareholders less non-core items. Non-core items include income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as write downs,write-downs, asset impairmentsimpairments, and other income and expense related to changes in law, outcomes in tax, regulatory or legal proceedings, and exit activities, including sale of certain assets and other activities that are no longer continuing. SCE implemented a customer-funded wildfire self-insurance program in 2023. With the commencement of this program, Edison International and SCE no longer consider wildfire-related claim losses to be representative of ongoing earnings and treat such costs as non-core items.

Reworded

1SCE and Edison International Parent and Other non-core items are tax-effected at an estimated statutory rate of approximately 28%; wildfire claims and expenses insured by EIS are tax-effected at the federal statutory rate of 21%. No net tax benefit was recognized for the Trio disposition loss as the related tax benefits are not expected to be realized.

Added

2As a result of the disposition of Trio in the second quarter of 2026, Trio-related income and expenses are classified as non-core items. Trio's after-tax operating losses of $4 million from the first quarter of 2026 were recast to non-core and included in the six months ended June 30, 2026 amount. Trio's after-tax operating losses of $2 million and $7 million for the three and six months ended June 30, 2025, respectively, were included in core earnings as originally reported.

Reworded

Edison International's firstsecond quarter 2026 earnings decreasedincreased $905$191 million from the firstsecond quarter of 2025, resulting from aan decreaseincrease in SCE's earnings of $948$200 million, partially offset by aan decreaseincrease in Edison International Parent and Other's loss of $43$9 million. SCE's lowerhigher net income consistedreflected of a $16 million non-core loss in 2026 compared to $947 million non-core earnings in 2025, partially offset by $15$198 million of higher core earnings.earnings and a $2 million lower non-core loss. Edison International Parent and Other's loss decreasedincreased by $43$9 million due to $40a $29 million of higher non-core earningsloss andin $32026, partially offset by $20 million of lower core loss.loss compared to 2025.

Added

Edison International's earnings for the six months ended June 30, 2026 decreased $714 million from the same period ended June 30, 2025, resulting from a decrease in SCE's earnings of $748 million, partially offset by a decrease in Edison International Parent and Other's loss of $34 million. SCE's lower net income reflected a $45 million non-core loss in 2026 compared to a $916 million non-core benefit in 2025, partially offset by $213 million of higher core earnings. Edison International Parent and Other's loss decreased by $34 million due to $27 million of lower core loss and $7 million of lower non-core loss.

Reworded

The increase in SCE's core earnings for the three and six months ended MarchJune 31,30, 20262026, fromcompared to the same periodperiods in 20252025, was primarily due to the adoption of the 2025 GRC final decision in the third quarter of 2025,2025. The increase for the six-month period was partially offset by the absence of a benefit to interest expense related to cost recoveries authorized under the TKM Settlement Agreement in 2025. The decrease in Edison International Parent and Other's core loss for the three months ended March 31, 2026, was primarily due to lower preferred stock dividends, partially offset by higher interest expense.

Added

The decrease in Edison International Parent and Other's core loss for the three and six months ended June 30, 2026, was primarily due to lower preferred stock dividends, partially offset by higher interest expense.

Reworded

Consolidated non-core items for the threesix months ended MarchJune 31,30, 2026 and 2025 for Edison International included:

Added

•Losses of $36 million ($33 million after-tax) in 2026 related to the disposition of Trio, including Trio's operating losses, the loss on disposition, and related transaction and employee costs. See "Results of Operations—Edison International Parent and Other—Trio" and "Notes to Condensed Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies" for further information.

Reworded

•Net earnings of $1 million ($1 million after-tax) recorded in 2026 primarily due to updated estimates of claims accruals, net of legal expenses, and charges of $50 million ($39 million after-tax) recorded in 2025, both related to wildfire claims insured by EIS. See "Notes to Condensed Consolidated Financial Statements— Note 12. Commitments and Contingencies" for further information.

Removed

Capital Expenditures

Reworded

Total capital expenditures (including accruals) were $1.5$3.1 billion for theboth threesix months ended MarchJune 31,30, 2026 and 2025. As discussed in the 2025 Form 10-K, SCE forecasts total capital expenditures ranging from $37.5 billion to $40.6 billion for 2026 – 2030, and weighted average annual rate base from $50.8 billion to $67.9 billion for 2026 – 2030. These capital program and rate base projections incorporate the planned CPUC-jurisdictional spending as informed by the 2025 GRC final decision and expected FERC capital expenditures, see "Liquidity and Capital Resources—SCE—Capital Investment Plan" below and "Management Overview — Capital Program" in the 2025 MD&A.

Added

In May 2026, the CAISO approved its 2025-2026 Transmission Plan, which identified new transmission projects expected to be constructed by SCE and finalized the CAISO's reassessment of certain SCE projects from the 2022-2023 Transmission Plan. As a result of this reassessment, certain previously approved projects were removed or modified and offset by newly approved projects. SCE's total anticipated capital expenditures for CAISO-approved transmission projects remain approximately $3 billion, of which approximately $1 billion is included in the total forecasted capital expenditures from 2026 – 2030. For further information, see "Management Overview—Capital Program" in the 2025 MD&A.

Reworded

SCE continues to implement its WMP to reduce the risk of SCE equipment contributing to the ignition of wildfires. Further to the investments SCE is making as part of its WMP, SCE also uses its PSPS program to proactively de-energize power lines as a last resort to mitigate the risk of significant wildfires during extreme weather events. In addition, California has increased its investment in wildfire prevention and fire suppression capabilities. Yet, the potential for catastrophic wildfire activity in SCE's service area still exists. In February 2026, the OEIS issued a final decision approving SCE’s 2026 – 2028 WMP. In March 2026, the OEIS issued SCE's safety certification which is valid until the later of March 2, 2027, and when OEIS acts on SCE's timely submittal of a request for its next safety certification.

Removed

In February 2026, the OEIS issued a final decision approving SCE’s 2026 – 2028 WMP. In March 2026, the OEIS issued SCE's safety certification which is valid until March 2, 2027. Provided SCE timely submits a request for its next safety certification, its current safety certification will remain valid until the OEIS acts on its request.

Reworded

In April 2026, the CEA submitted to the California Legislature and the Governor a report required by SB 254 that evaluates California’s approach to natural catastrophe risk, including wildfires. The report identifies increasing natural catastrophe risk driven by climate‑related factors, development in wildfire‑prone areas, fuel conditions, and other systematic factors, and highlights challenges in wildfire mitigation, insurance availability, liability allocation, and post‑event recovery. The report observes that failure to address escalating wildfire risk would prolong recovery for affected communities, significantly increase electric utility costs, driving higher customer rates, and also could elevate insurance premiums statewide. ContinuedThe report further observes that inaction would expose SCE to risk of credit downgrades and heightened financial stress, limiting access to capital needed to maintain safe and reliable infrastructure. Taken together, these dynamics would exacerbate affordability pressures, undermine market stability, and impede SCE's ability to support long‑term reliability and California's climate‑related objectives.

Reworded

SCE’s internal review into the facts and circumstances of the Eaton Fire is complex and ongoing. SCE's review includes ongoing inspections of its facilities and records and of third-party information and testing. While SCE has not conclusively determined that its equipment caused the ignition of the Eaton Fire, a viable explanation is that a de-energized idle SCE transmission facility in the preliminary area of origin was associated with the ignition of the firefire, and SCE is not aware of evidence pointing to another possible source of ignition. Absent additional evidence, SCE believes that it is likely that its equipment could have beenwas associated with the ignition of the Eaton Fire and is pursuing settlement of claims through its Wildfire Recovery Compensation Program, a program designed to enable eligible individuals and businesses impacted by the Eaton Fire to seek expedited resolution of their claims.

Reworded

SCE has entered into settlements with insurance claimants and claimants under its Wildfire Recovery Compensation Program related to the Eaton Fire. As of MarchJune 31,30, 2026, SCE had recorded $1.3$1.6 billion in losses related to these settlements. SCE also recorded expected recoveries from customer-funded self-insurance of $917 million, from the Wildfire Fund of $295$645 million, and through FERC electric rates of $70 million. In total, through MarchJune 31,30, 2026, the net after-tax charge to earnings recorded related to the settlements was $9 million, the after-tax impact of the required $12.5 million shareholder contribution related to SCE's customer-funded self-insurance coverage. For more information about settlements under SCE’s Wildfire Recovery Compensation Program, see "Notes to Condensed Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides—Settlement of Claims."

Reworded

SCE exhausted self-insurance recoveries available for losses related to the Eaton Fire as a result of costs incurred and settlements entered into as of February 11, 2026. SCE has advised the administrator of the Wildfire Fund that it anticipates that it will seek reimbursement of eligible claims arising from the Eaton Fire from the Initial Account and the administrator has confirmed that the Eaton Fire is a "covered wildfire" for purposes of accessing the Initial Account. SCE will be reimbursed for losses incurred in excess of $1.0 billion for eligible claims for third-party damages related to the Eaton Fire from the Initial Account, subject to approval of the fund administrator and the Initial Account's claims-paying capacity. The fund administrator has reported that approximately $21 billion in the fund's claims-paying capacity will be available for the Eaton Fire, as of September 30, 2025, exceeds $21 billion.Fire.

Reworded

SCE will file an application with the CPUC for review of its costs and expenses related to the Eaton Fire after it has resolved all or, if authorized by the CPUC, substantially all third-party damage claims related to the fire, or upon earlier request of the fund administrator. Because SCE held a valid safety certification at the time of the Eaton Fire, SCE will be presumed to have acted prudently unless a party in the proceeding creates "serious doubt" as to the reasonableness of its conduct, in which case SCE will have the burden of dispelling that doubt and proving its conduct was prudent. The prudency standard does not necessitate perfect conduct and California Wildfire Legislation requires that the CPUC allow recovery if it determines that SCE's conduct related to the ignition of the Eaton Fire was consistent with actions of a reasonable utility. SCE believes that the CPUC's determination regarding the reasonableness of its ignition-related conduct should be based on an evaluation of the reasonableness of its overall policies, systems, and practices. The CPUC has not yet issued a final decision applying the California Wildfire Legislation prudency framework to a wildfire cost-recovery proceeding.

Reworded

The following discusses SCE's condensed consolidated statements of income for the three and six months ended MarchJune 31,30, 2026 and 2025. In general, expenses SCE is authorized to pass through directly to customers (such as purchased power and fuel expenses, flow-through taxes, as well as costs incurred for various programs and activities, such as public purpose programs and vegetation management activities) and the corresponding amount of revenues collected to recover those pass-through costs do not impact net income.

Reworded

Three months ended MarchJune 31,30, 2026 versus MarchJune 31,30, 2025

Reworded

AnA increasedecrease in operating revenue of $294$184 million was primarily due to:

Removed

•An increase in revenue of $282 million driven by the 2025 GRC final decision, including the 2026 escalation mechanism set forth in the 2025 GRC decision. SCE's results of operations for the three months ended March 31, 2025 were based on the 2024 authorized revenue. SCE received the final 2025 GRC decision in the third quarter of 2025 and the authorized revenue attributable to first quarter of 2025 but recorded subsequently in 2025 was approximately $202 million.

Reworded

•AnA increasedecrease in revenue of $15$400 million related to net higherlower expenses that are passed through to customers, which mainly included increasesdecreases in:

Removed

•Interest expense of $29 million;

Removed

•Depreciation and amortization expense of $25 million;

Removed

•Income tax expense of $14 million;

Removed

•Wildfire-related claims, net of recoveries of $8 million;

Removed

•Property and other taxes of $4 million;

Removed

partially offset by decreases in:

Reworded

•Purchased powerDepreciation and fuelamortization expense of $77$30 million;

Reworded

•OtherPurchased incomepower and fuel expense of $4$20 million.million;

Added

partially offset by increases in:

Added

•Income tax expense of $56 million;

Added

•Wildfire-related claims, net of recoveries, of $17 million.

Added

•A decrease in revenue of $57 million primarily due to the recognition of return on wildfire-related balancing account rate base resulting from regulatory decisions received in the second quarter of 2025.

Added

partially offset by:

Added

•An increase in revenue of $273 million driven by the 2025 GRC final decision, including the 2026 escalation mechanism set forth in the 2025 GRC decision. SCE's results of operations for the three months ended June 30, 2025 were based on the 2024 authorized revenue. SCE received the final 2025 GRC decision in the third quarter of 2025 and the authorized revenue attributable to the second quarter of 2025 but recorded subsequently in 2025 was approximately $193 million.

Reworded

A decrease in purchased power and fuel costs of $77$20 million was primarily due to lower energy prices,prices and higher congestion revenue rights credits, partially offset by higher capacity costs (offset in "Operating Revenue" above).

Reworded

AnA increasedecrease in operation and maintenance expense of $36$512 million was primarily due to:

Removed

•An increase of $18 million mainly related to higher inspections and preventative maintenance activities in 2026.

Reworded

•A net increasedecrease of $16$425 million pass-through costs (offset in "Operating Revenue" above), which is mainly related to higherthe publicrecognition programs expenses and higherof previously deferred wildfire mitigation and vegetation management costs authorized for recovery in 2026, partially offset by lower uncollectible expense.2025.

Added

•A charge of $62 million recorded in 2025 primarily associated with disallowed historical expenses related to 2021 GRC wildfire mitigation memorandum account balances.

Added

An increase of $17 million in wildfire-related claims, net of recoveries, was primarily due to the net recognition of previously deferred claim costs to be recovered through FERC rates (offset in "Operating Revenue" above).

Added

For further information, see "Notes to Condensed Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."

Added

Depreciation and Amortization

Added

An increase in depreciation and amortization expense of $8 million was primarily due to higher plant balances, partially offset by $30 million of lower pass-through costs mainly associated with wildfire-related regulatory decisions received in 2025 (offset in "Operating Revenue" above).

Added

Income Taxes

Added

An increase in income tax expense of $136 million was primarily due to $94 million of higher tax expense on higher pre-tax income and $42 million of lower flow-through tax benefits that were passed through to customers (offset the corresponding pre-tax amount in "Operating Revenue"). See "Notes to Condensed Consolidated Financial Statements—Note 8. Income Taxes" for a reconciliation of the federal statutory rate to the effective income tax rate.

Added

Six months ended June 30, 2026 versus June 30, 2025

Added

Operating Revenue

Reworded

AAn decreaseincrease in recoveriesoperating revenue of wildfire-related claims of $1,352$110 million was primarily due to:

Added

•An increase in revenue of $553 million driven by the 2025 GRC final decision, including the 2026 escalation mechanism set forth in the 2025 GRC decision. SCE's results of operations for the six months ended June 30, 2025 were based on the 2024 authorized revenue. SCE received the final 2025 GRC decision in the third quarter of 2025 and the authorized revenue attributable to the first and second quarters of 2025 but recorded subsequently in 2025 was approximately $394 million.

Added

partially offset by:

Added

•A decrease in revenue of $390 million related to net lower expenses that are passed through to customers, which mainly included decreases in:

Added

•Operation and maintenance expense of $408 million;

Added

•Purchased power and fuel expense of $97 million;

Showing the first 60 of 129 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

EIX insider buying and selling (Form 4)

Since 2026-04-11, insiders reported open-market purchases in 0 Form 4 filings and open-market sales in 2 filings (1 insider, 2 trade dates, 1,000 shares, about $75.3K; 2 of these filings say the sales were made under a Rule 10b5-1 trading plan). Net open-market shares: -1,000 (purchases minus sales); net value about -$75.3K.Totals add up every open-market (code P and S) line in those filings, using the prices reported in the filings. Awards, option exercises, tax withholding and gifts are listed below but not counted.

Trade dateInsiderTransactionSharesPriceValueOwned afterFiling
2026-07-13Taylor Peter J.
Director
Open-market sale
10b5-1 plan
500$75.40 $37.7K33,712 SEC
2026-04-23Smith Carey A.
Director
Grant/award 2,737— —6,593 SEC
2026-04-23Granholm Jennifer M
Director
Grant/award 2,737— —2,737 SEC
2026-04-13Taylor Peter J.
Director
Open-market sale
10b5-1 plan
500$75.30 $37.6K34,212 SEC

Well-known investors holding EIX (13F)

InvestorQuarterSharesReported value% of their 13FChange vs prior quarter
AQR Capital Management (Cliff Asness) COM2026-06-3018,694,105$1.4B0.49%Reduced 10%
Two Sigma Investments COM2026-06-302,996,132$223.1M0.17%Added 32%
Bridgewater Associates COM2026-06-301,234,614$91.9M0.38%Added 777%
D. E. Shaw & Co. COM2026-06-30302,780$22.5M0.01%Reduced 72%
Citadel Advisors (Ken Griffin) COM2026-06-30216,330$16.1M0.01%Added 46%
Gotham Asset Management (Joel Greenblatt) COM2026-06-30189,171$14.1M0.03%Added 7%
Millennium Management (Israel Englander) COM2026-06-3050,935$3.8M0.0%Reduced 83%
Renaissance Technologies COM2026-06-3049,500$3.6M—Sold out
Baillie Gifford COM2026-06-3016,660$1.2M0.0%Reduced 12%

13F reports are filed up to 45 days after quarter end and show long U.S. equity positions only; options positions are omitted here.

Coming soon: email alerts when EIX files, watchlists and downloadable comparisons.