At a glance

3 / 1risk-factor paragraphs added / removed in latest 10-K
0new risk-factor headings
0Form 4 filings reporting open-market purchases (last 180 days)
2Form 4 filings reporting open-market sales (last 180 days)

Jump to: Annual report (10-K) · Quarterly report (10-Q) · Insider transactions · 13F holders

What changed in the latest 10-K

Comparing 10-K filed 2026-02-19 (period ending 2025-12-31) with 10-K filed 2025-02-20 (period ending 2024-12-31).

Risk Factors (10-K Item 1A)

3new paragraphs
1removed paragraphs
33reworded paragraphs
13,809 → 13,497words in section

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

Reworded topics: bankruptcy, default, credit rating

Paragraph as it now reads, with added and removed wording marked:

Idaho Power’s energy risk management policy and programs relating to economically hedging commodity exposures and credit risk may not always perform as intended, and as a result, IDACORP and Idaho Power may suffer losses. Idaho Power enters into transactions to buy and sell power, natural gas, and transmission service, enters into transactions to hedge its positions in coal, natural gas, power, and other commodities, and enters into economic hedge transactions to mitigate in part exposure to variable commodity prices. IDACORP and Idaho Power could recognize losses as a result of volatility in the market value of these contracts or if a counterparty fails to perform. The derivative instruments used for hedging might not offset the underlying exposure being mitigated as intended, due to pricing inefficiencies or other terms of the derivative instruments, and any such failure to mitigate exposure could result in losses. Certain of Idaho Power's purchase or sale, hedging, and derivative agreements may result in the receipt of, or posting of, collateral with counterparties. Fluctuations in commodity prices that lead to the posting of collateral with counterparties negatively impact liquidity, and downgrades in Idaho Power's credit ratings may lead to additional collateral posting requirements. In 2024,2025, Idaho Power recorded losses on economic hedges of $63.3$37.7 million, compared with $16.2$63.3 million of losses in 2023.2024. At times, Idaho Power’s energy risk management policy results in Idaho Power entering into economic hedges in an environment where prices are high, and if prices are lower at the time the economic hedge settles, Idaho Power will record losses on the economic hedges.hedges, Dependingwhich on the volume of economic hedges and the degree of price volatility, those losses cancould be substantial,substantial. and theThe power cost adjustment mechanisms generally provide that Idaho Power will incur a portion of those losses. Forecasts of future fuel needs and loads and available resources to meet those loads are inherently uncertain and may cause Idaho Power to over- or under-hedge actual resource needs, exposing the company to market risk on the over- or under-hedged position. To the extent that commodity markets are illiquid, Idaho Power may not be able to execute its risk management strategies, which could result in undesired over-exposure to unhedged positions that Idaho Power may not be able to collect in customer rates. The FERC may take action to limit volatility in the energy market by imposing price limits or other market restrictions to control rates in market-based sales, which could adversely affect the companies' financial results. As a result, risk management actions, or the failure or inability to manage commodity availability and price and counterparty risk, may adversely affect IDACORP’s and Idaho Power’s financial condition and results of operations. Idaho Power has additional indirect credit exposures to financial institutions in the form of letters of credit provided as security by power suppliers under various purchased power contracts, by vendors for infrastructure development projects, and by customers or potential customers. If any of the credit ratings of the letter of credit issuers were to drop below investment grade, the vendor, supplier, customer, or potential customer would need to replace the security with an acceptable substitute, which may be impracticable and may expose Idaho Power to losses resulting from a default of the counterparty. If the security were not replaced, the counterparty could be in default under the contract and Idaho Power's remedies for default may be inadequate to fully compensate Idaho Power for its losses. Further, the bankruptcy or insolvency of a counterparty to commodity or other transactions could impair Idaho Power’s ability to collect amounts receivable from those counterparties, potentially including the ability to collect or retain collateral posted by a counterparty.
see in full comparison
New text topics: bankruptcy, default, credit rating
“Idaho Power has additional indirect credit exposures to financial institutions in the form of letters of credit provided as security by power suppliers under various purchased power contracts, by vendors for infrastructure development projects, and by customers or potential customers. …”
see in full comparison
New text topics: penalt, tariff, impairment, china
“Changes in U.S. trade policy and the impact of tariffs could have an adverse effect on Idaho Power's business and results of operations. The U.S. government has implemented and may continue to implement significant trade policy and tariff actions, including but not limited to tariffs on imported steel and aluminum products, tariffs on certain imports from China, Canada, and Mexico, and baseline tariffs on imports from many other countries. …”
see in full comparison
Reworded topics: write-down

Paragraph as it now reads, with added and removed wording marked:

While Idaho Power has recently experienced a net growth in usage due to an increase in the number of customers, when adjusted for the impacts of weather, the average monthly usage on a per customer basis for Idaho Power's residential customers has declined from 1,032 kWh in 2012 to 914922 kWh in 2024.2025. There is also no guarantee that Idaho Power will continue to experience an increase in the number of customers at the current rate of growth or at all. Rate mechanisms, such as the Idaho FCA for residential and small commercial customers, are designed to address the financial disincentive associated with promoting energy efficiency activities, but there is no assurance that the mechanism will result in full or timely collection of Idaho Power's fixed costs, which are currently collected in large part through the company's volume-based energy rates that are based on historical sales volume.costs. Any undercollection of fixed costs would adversely impact revenues, earnings, and cash flows. The formation of municipal utilities or similar entities for distribution systems within Idaho Power's service area could also result in a load decrease. Idaho Power is experiencing a rapid addition of new industrial and commercial customer load. It is possible that such new industrial and commercial customers may not meet forecasted power usage ramp rates or amounts. The loss of loads resulting from any of these events may result in excess infrastructure and stranded costs and require IDACORP and Idaho Power to modify or eliminate large generation, storage, or transmission projects. This could in turn result in reduced revenues as well as write-downs or write-offs if regulators determine that the costs of the projects were incurred imprudently, which could have a material adverse impact on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.
see in full comparison
Reworded topics: inflation, recession

Paragraph as it now reads, with added and removed wording marked:

Changes in customer growth and customer usage may negatively affect IDACORP's and Idaho Power's business, financial condition, and results of operations. Changes in the number of customers and customers' use of electricity are affected by a number of factors, such as population growth or decline in Idaho Power's service area,decline, expansion or loss of service area, changes in customer needs and expectations, changes to customer rates, adoption rates of energy efficiency measures, customer-generated power such as from solar panels and gas-fired generators,power, demand-side management requirements, regulation or deregulation, and economic conditions. Continued inflationaryInflationary pressures, including as a result of new or increased tariffs or other trade restrictions, or an economic downturn or recession,downturn, could also negatively impact customer use and reduce revenues and cash flows, thus adversely affecting results of operations. Many electric utilities, including Idaho Power, have experienced a long-term decline in usage per customer, in part attributable to energy efficiency activities. State or federal regulations may be enacted to encourage or require mandatory energy conservation or technological advances that increase energy efficiency, which could further reduce usage per customer. Also, changing customer needs and expectations, such as a desire for increased renewable or low GHG-emitting sources of energy, increased customer rates as a result of recent rate cases and any future rate cases,rates, and increased competition from customer-owned generation could lead to lower customer satisfaction, reduced loyalty, difficulty in obtaining rate increases, legislation to deregulate electric service, and customers seeking alternative sources of energy and electric service. If customers choose to generate their own energy, discontinue a portion or all service from Idaho Power, or replace electric power for heating with natural gas, demand for Idaho Power's energy may decline and adversely impact the affordability of its services for remaining customers.
see in full comparison
New text topics: write-down
“Idaho Power is experiencing a rapid addition of new industrial customer load, but if the new load does not meet forecasted power usage ramp rates or amounts, the loss of load may result in excess infrastructure and stranded costs and require Idaho Power to modify or eliminate large generation, storage, or transmission projects. …”
see in full comparison
Full comparison: every changed paragraph (37)

Green = added, red = removed. Unchanged paragraphs, 1 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

State or federal regulators may not approve customer rates that provide timely or sufficient recovery of Idaho Power's costs or allow Idaho Power to earn a reasonable rate of return, which could adversely affect IDACORP's and Idaho Power's financial condition and results of operations. The prices that the IPUC and OPUC authorize Idaho Power to charge customers for its retail services, and the tariff rate that the FERC permits Idaho Power to charge for its transmission services, are significant factors influencing IDACORP’s and Idaho Power’s business, results of operations, liquidity, and financial condition. Idaho Power's ability to recover its costs and earn a reasonable rate of return can be affected by many regulatory factors, including the time between when Idaho Power incurs costs and when Idaho Power recovers those costs in customers’ rates (often called "regulatory lag" in the utility industry), and differences between the costs included in rates and the amount of actual costs incurred. Idaho Power expects to incur increasing costs,costs for construction of new facilities and transmission resources, O&M, compliance with legal and regulatory requirements, and pension contributions, among others, which is likely to occur before the IPUC, OPUC, or FERC approve the recovery of those costs, such as construction costs for new facilities and transmission resources, costs associated with changes in the long-term cost-effectiveness or operating conditions of Idaho Power's assets that could result in early retirements of utility facilities, costs of compliance with legislative and regulatory requirements, fuel and wholesale power costs, and increased funding levels of Idaho Power's defined benefit pension plan.costs. The IPUC, OPUC, and FERC may not allow Idaho Power to recover some or all of those costs or costs that have already been deferred as regulatory assets if they find Idaho Power did not reasonably or prudently incur those costs or for other reasons. The IPUC and OPUC may adopt different methods of calculating the allocation of the total utility costs in their respective jurisdictions, resulting in certain costs excluded in both states. Ratemaking has generally been premised on estimates of historic costs based on a test year, so if a given year’s actual costs are higher than historic costs, rates may not be sufficient to cover actual costs. While rate regulation is also premised on the assumption that rates established are fair, just, and reasonable, regulators have considerable discretion in applying this standard.

Reworded

Economic, political, legislative, public policy, or regulatory pressures may lead stakeholders to seek rate reductions or refunds, limits on rate increases, or lower allowed rates of return on investments for Idaho Power. The ratemaking process typically involves multiple intervening parties, including governmental bodies, consumer advocacy groups, and customers, generally with the common objective of limiting rate increases or even reducing rates. With the large amount of ongoing and projected investments and the associated regulatory lag in cost recovery, Idaho Power filed rate cases in Idaho in 20232023, 2024, and 20242025, and Oregon in 2023 and expects that it will likely file rate cases or seek other types of regulatory relief on a regular basis in the next few years. There can be no assurance that any rate case filed by Idaho Power will result in an outcome that is satisfactory for Idaho Power. In the past, Idaho Power has been denied recovery, or required to defer recovery pending the next general rate case, including denials or deferrals related to capital expenditures for long-term project expenses. Adverse outcomes in regulatory proceedings, or significant regulatory lag, may cause Idaho Power to incur unrecovered project costs or result in cancellation of projects, or to record an impairment of its assets or otherwise adversely affect cash flows and earnings. This may also result in lower credit ratings, reduced access to capital, higher financing costs, and reductions or delays in planned capital expenditures.

Reworded

Idaho Power's regulatory cost recovery mechanisms may not function as intended and are subject to change or elimination, which may adversely affect IDACORP's and Idaho Power's financial condition and results of operations. Idaho Power has power cost adjustment mechanisms in its Idaho and Oregon jurisdictions and an FCA mechanism in Idaho. The power cost adjustment mechanisms track Idaho Power’s actual net power supply costs (primarily fuel and purchased power less wholesale energy sales) and compare these amounts to net power supply costs being recovered in retail rates. A majority of the differences between these two amounts is deferred for future recovery from, or refund to, customers through rates. Volatility in power supply costs continues to be significant, in large part due to fluctuations in hydropower generation conditions, fuel cost variability from factors including supply chain disruptions and inflation, supply and demand economics for fuel and power, the impact of high costs to purchase renewable energy under mandatory long-term contracts, and market price variability for power purchases from third parties based on seasonal demands and transmission system constraints. Changes in market dynamics due to the emergence of day ahead or other energy and transmission markets in the western United States could also increase the volatility of power supply costs. While the power cost adjustment mechanisms function to mitigate the potentially adverse impactimpacts on net income of power supply cost volatility, the mechanisms do not eliminate the cash flow impact of that volatility. When power costs rise above the level recovered in current retail rates, Idaho Power incurs the costs but recovery of those costs is deferred to a subsequent collection period, which can adversely affect operating cash flow and liquidity until those costs are recovered. The FCA mechanism is a decoupling mechanism that allows Idaho Power to charge Idaho residential and small commercial customers when it recovers less than the base level of fixed costs per customer that the IPUC authorized for recovery. The power cost adjustment and FCA mechanisms are generally subject to change at the discretion of applicable state regulators, who could decide to modify or eliminate either mechanism in a manner that adversely impacts IDACORP's and Idaho Power's financial condition, cash flows, and results of operations.

Reworded

Changes in customer growth and customer usage may negatively affect IDACORP's and Idaho Power's business, financial condition, and results of operations. Changes in the number of customers and customers' use of electricity are affected by a number of factors, such as population growth or decline in Idaho Power's service area,decline, expansion or loss of service area, changes in customer needs and expectations, changes to customer rates, adoption rates of energy efficiency measures, customer-generated power such as from solar panels and gas-fired generators,power, demand-side management requirements, regulation or deregulation, and economic conditions. Continued inflationaryInflationary pressures, including as a result of new or increased tariffs or other trade restrictions, or an economic downturn or recession,downturn, could also negatively impact customer use and reduce revenues and cash flows, thus adversely affecting results of operations. Many electric utilities, including Idaho Power, have experienced a long-term decline in usage per customer, in part attributable to energy efficiency activities. State or federal regulations may be enacted to encourage or require mandatory energy conservation or technological advances that increase energy efficiency, which could further reduce usage per customer. Also, changing customer needs and expectations, such as a desire for increased renewable or low GHG-emitting sources of energy, increased customer rates as a result of recent rate cases and any future rate cases,rates, and increased competition from customer-owned generation could lead to lower customer satisfaction, reduced loyalty, difficulty in obtaining rate increases, legislation to deregulate electric service, and customers seeking alternative sources of energy and electric service. If customers choose to generate their own energy, discontinue a portion or all service from Idaho Power, or replace electric power for heating with natural gas, demand for Idaho Power's energy may decline and adversely impact the affordability of its services for remaining customers.

Reworded

While Idaho Power has recently experienced a net growth in usage due to an increase in the number of customers, when adjusted for the impacts of weather, the average monthly usage on a per customer basis for Idaho Power's residential customers has declined from 1,032 kWh in 2012 to 914922 kWh in 2024.2025. There is also no guarantee that Idaho Power will continue to experience an increase in the number of customers at the current rate of growth or at all. Rate mechanisms, such as the Idaho FCA for residential and small commercial customers, are designed to address the financial disincentive associated with promoting energy efficiency activities, but there is no assurance that the mechanism will result in full or timely collection of Idaho Power's fixed costs, which are currently collected in large part through the company's volume-based energy rates that are based on historical sales volume.costs. Any undercollection of fixed costs would adversely impact revenues, earnings, and cash flows. The formation of municipal utilities or similar entities for distribution systems within Idaho Power's service area could also result in a load decrease. Idaho Power is experiencing a rapid addition of new industrial and commercial customer load. It is possible that such new industrial and commercial customers may not meet forecasted power usage ramp rates or amounts. The loss of loads resulting from any of these events may result in excess infrastructure and stranded costs and require IDACORP and Idaho Power to modify or eliminate large generation, storage, or transmission projects. This could in turn result in reduced revenues as well as write-downs or write-offs if regulators determine that the costs of the projects were incurred imprudently, which could have a material adverse impact on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.

Added

Idaho Power is experiencing a rapid addition of new industrial customer load, but if the new load does not meet forecasted power usage ramp rates or amounts, the loss of load may result in excess infrastructure and stranded costs and require Idaho Power to modify or eliminate large generation, storage, or transmission projects. This could in turn result in reduced revenues, earnings, and cash flows, as well as write-downs or write-offs if regulators determine that the costs of the projects were incurred imprudently, which could have a material adverse impact on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.

Reworded

Conversely, if Idaho Power were to experience an unanticipated increase in the demand for energy through, for example, the rapid addition of new industrial and commercial customers or population growth in the service area, Idaho Power may be required to rely on higher-cost purchased power to meet peak system demand and may need to accelerate investment in additional generation or transmission resources. Idaho Power's 20232025 IRP preferred resource portfolio and action plan included a need to acquire significant generation and storage resources to meet forecasted increasing energy and capacity needs. There can be no assurance that these energy and capacity needs will not change or that the resources will be adequate to meet load demands, in which case Idaho Power would need to rely on additional wholesale power purchases and would be subject to the volatility of wholesale markets. If the incremental costs associated with unanticipated changes in loads exceed the incremental revenue received from the sales to the new customers, and Idaho Power is unable to secure timely and full rate relief to recover those increased costs, the resulting imbalance could have an adverse effect on IDACORP's and Idaho Power's financial condition, results of operations, and cash flows.

Reworded

Changes in weather conditions, severe weather, and the impacts of climate change can affect IDACORP's and Idaho Power's operating results and cause them to fluctuate seasonally. Idaho Power's electric power sales are seasonal, with demand in Idaho Power's service area peaking during the hot summer months,months withand a secondary peak during the cold winter months. Electric power demands by irrigation customers in Idaho Power's service area, which are impacted by temperatures and the timing and amount of precipitation, can also create significant seasonal changes in usage. Seasonality of revenues may be further impacted by Idaho Power's tiered rate structure, under which rates charged to customers are often higher during higher-load periods, such as hot summers and cold winters. Market prices for power also often increase significantly during these peak periods, at times when Idaho Power is required to purchase power in the wholesale markets to meet customer demand. While Idaho Power has regulatory mechanisms to help mitigate the impact of weather on power supply costs, there is no assurance that it will continue to receive such regulatory protection in the future. By contrast, when temperatures are relatively mild or where precipitation supplants irrigation systems, loads are often lower as customers are not using electricity for heating and air conditioning or irrigation purposes. Thus, weather conditions and the timing and extent of precipitation can cause IDACORP's and Idaho Power's results of operations and financial condition to fluctuate seasonally, quarterly, and from year to year.

Reworded

Idaho Power's customers' energy needs vary with weather and to the extent weather conditions are affected by climate change, customers' energy use could increase or decrease. Increased energy use due to weather changes may require Idaho Power to invest in generating assets and transmission and distribution infrastructure, while decreased energy use due to weather changes may result in decreased revenues. Extreme weather conditions creating high energy demand may raise wholesale electricity prices for power that Idaho Power purchases to serve customers, increasing the cost of energy Idaho Power provides to its customers, and at the same time can increase the revenues Idaho Power receives for wholesale market sales of excess generation during regional extreme weather events.generation. Variations in hydropower generation that increase Idaho Power's reliance on market purchases may lead to more costly power supply sources for its customers and reduce benefits from selling surplus hydropower in the wholesale market. The price of power in the wholesale energy markets tends to be higher during periods of high regional demand that tends to occur with weather extremes, which may cause Idaho Power to purchase power in the wholesale market during peak price periods, increasing power supply costs. Idaho Power has in place mechanisms to help mitigate the effects of energy market price volatility, but there is no assurance these mechanisms willmay not continue to be in place or function as intended.

Reworded

Liability from fires could adversely impact IDACORP's and Idaho Power's business, financial condition, and results of operations, and Idaho Power's WMP and other protocols may not prevent such liability. Fires alleged to have been caused by Idaho Power's transmission, distribution, or generation infrastructure, or that allegedly result from Idaho Power’s or its contractors’ operating or maintenance practices, have exposed, and in the future could expose, Idaho Power to claims for fire suppression and clean-up costs, evacuation costs, fines and penalties, and liability for economic damages, personal injury, loss of life, property damage, inverse condemnation, and environmental pollution, whether based on claims of negligence, trespass, or otherwise.pollution. The risk of wildfires is exacerbated in forested areas where beetle infestations and rising tree mortality rates have caused a significant increase in the quantity ofwith standing dead and dying timber, increasing the risk that such trees may fall from either inside or outside Idaho Power's right-of-way into a powerline, igniting a fire and increasing the severity of fires. A significant number of urban-wildland interfaces in and near Idaho Power's service area, and commonly hot, dry summer conditions that may worsen as a result of climate change, increase the likelihood and magnitude of damages that may be caused by fires burning into or allegedly originating from utility equipment. Idaho Power spends significant resources on initiatives designed to mitigate wildfire risks, including through its WMP, but there is no assurance that the WMP and other protocols will be successful or effective in reducing wildfire-related losses. Further, there has been an increasing trend in the degree of annual destruction from wildfires in the western United States, as well as utility companies facing claims for significant damages resulting from wildfires. Idaho Power maintains insurance coverage for such risks, but insurance coverage is subject to terms and limitations and may not be sufficient to cover Idaho Power’s ultimate liability. Coverage limits within Idaho Power's wildfire insurance policies could result in material self-insured costscosts. due to self-insured retention amounts underIn the terms ofpast, Idaho Power’sPower insurance policies. Idaho Power, its contractors, and its customers havehas experienced coverage reductions and increased wildfire insurance costs and may continue to do so in future years. Idaho Power may be unable to recover costs in excess of insurance through customer rates or regulatory mechanisms and, even if such recovery is possible, it could take several years to collect. If the amount of insurance is insufficient or otherwise unavailable, and if Idaho Power is unable to fully recover in rates the costs of uninsured losses, IDACORP’s and Idaho Power’s business, financial condition, and results of operations could be materially affected.

Reworded

New advances in power generation, energy efficiency, alternative energy sources, or other technologies that impact the power utility industry could decrease customer energy demand and revenues, which could have implications for generation and system planning. Advances in technology and changes in customer demand and preferences in the electric utility industry have encouraged the development of new technologies for power generation, renewable energy, energy storage, customer-owned generation, and energy efficiency. In particular, in recent years the net cost of solar and wind generation and storage technology has decreased significantly, and there arehave been federal and state regulations, laws, and other incentives in place to help further reduce the net cost of solar, wind, and energy storage facilities. There is potential that customer-owned solar power generation systems could become sufficiently cost-effective and efficient that an increasing number of Idaho Power's customers choose to install such systems on their homes or businesses, which in turn could require changes in the way Idaho Power builds and manages its distribution systems and substantial grid infrastructure costs, and at the same time reduce the demand for and sale of energy. Additionally, considerable emphasis has been placed on energy efficiency, such as LED lighting and high-efficiency appliances. Energy efficiency programs, including programs sponsored by Idaho Power under a directive from state regulatory commissions, are designed to reduce energy use and demand. The introduction of new technologies could pose risks in the form of reduced sales and new business models for energy services. These changes in technology could also alter the channels through which customers buy or utilize energy, including the potential formation of community-based, cooperative ownership or municipal structures, which could reduce Idaho Power's revenues or impact Idaho Power's expenses. A reduction in load, however, would not necessarily reduce Idaho Power's need for ongoing investments in its infrastructure to reliably serve its customers. If Idaho Power is unable to adjust its rate design or maintain adequate regulatory mechanisms allowing for timely cost recovery, declining usage resulting from customer-owned generation sources and energy efficiency could result in under-recovery of Idaho Power's costs and investment in infrastructure, and reduce revenues, which would adversely impact IDACORP's and Idaho Power's financial condition and results of operations.

Reworded

Acts or threats of terrorism, acts of war, social unrest, cyber or physical security attacks, and other malicious acts of individuals or groups seeking to disrupt Idaho Power's operations or the electric power grid or compromise data could adversely impact IDACORP's and Idaho Power's business, financial condition, and results of operations. Idaho Power operates in an industry that requires the continuous use and operation of sophisticated information technology and increasingly complex operational technology systems and network infrastructure. Idaho Power's generation and transmission facilities and its grid operations are potential targets for terrorist acts and threats, acts of war, social unrest, cyber and physical security attacks, and other disruptive activities of individuals or groups, including by nation states or nation state-sponsored groups. There have been cyber and physical attacks on energy infrastructure within the energy industry and on Idaho Power specifically in the past, and there are likely to be additional attacks in the future.future on Idaho PowerPower, its vendors, and itsother vendors have been subject to, and will likely continue to be subject to, attempts to gain unauthorized access to systems and confidential information or to disrupt operations.utilities. The utility industry is continuing to experience an increase in the frequency and sophistication of cybersecurity incidents.

Reworded

Some of Idaho Power's facilities are deemed "critical infrastructure" under federal standards, in that incapacity or destruction of the facilities could have a debilitating impact on security, reliability, or operability of the bulk electric power system, national economic security, and public health and safety. Infrastructure facilities, such as power generation facilities and electric transmission or distribution facilities, could be direct targets of, or potential indirect casualties of, an act of terror or war or cyber or physical attack (whether originating internal to Idaho Power or externally), which might affect Idaho Power's operations by limiting the ability to generate, purchase, or transmit power. Idaho Power's electric transmission systems are part of an interconnected regional grid, and therefore, it faces the risk of causing or being subject to a long-term power outage due to grid disturbances or disruptions on a neighboring interconnected grid system. Cyber and physical threats and attacks can have cascading impacts that unfold with increasing speed across networks, information systems, and other technologies. Network, information systems, and technology-related events, including those caused by IDACORP or Idaho Power through process breakdowns, human error, security architecture or design vulnerabilities, or by third parties through cyber or physical security attacks,parties, could result in a degradation or disruption in the energy grid and the services of the companies, as well as the ability to record, process, and report customer, business, and financial information. Physical or cyber attacks against key suppliers or service providers could have a similar effect on Idaho Power.

Reworded

Idaho Power's business operations require the continuous availability of information technology systems and network infrastructure, and in the normal course of business, Idaho Power or its vendors collect and store sensitive and confidential customer and employee information and proprietary information of Idaho Power. Idaho Power’s technology systems are dependent upon connectivity to the internet and third-party vendors to host, maintain, modify, and update its systems, which may experience significant system failures or cyber attacks that could compromise the security of Idaho Power’s assets and information. All information technology systems are vulnerable to being disabled, unauthorized access, unintentional defects, user error, errors in system changes, and cybersecurity incidents. Idaho Power is in the process of pursuing complex business system upgrades, and these significant changes increase the risk of system interruption. Any data security breaches, such as misappropriation, misuse, leakage, falsification or accidental release or loss of information maintained in Idaho Power's information technology systems or on third-party systems, including customer or employee data, could result in violations of privacy and other laws and associated litigation and liability for damages, fines, and penalties; financial loss to Idaho Power or to its customers; customer dissatisfaction or diminished customer confidence; and damage to Idaho Power’s reputation, all of which could materially adversely affect Idaho Power's financial condition and results of operations.

Reworded

No security measures can completely shield Idaho Power's systems, infrastructure, and data from vulnerabilities to cyber attacks, human error, intrusions, or other catastrophic events that could result in their failure or reduced functionality, and ultimately the potential loss of sensitive information or the loss of Idaho Power's ability to fulfill critical business functions and provide reliable electric power to customers. Despite the steps Idaho Power may take to detect, mitigate, or eliminate threats and respond to security incidents, the techniques used by those who seek to obtain unauthorized access, and possibly disable or sabotage systems or abscond with information and data, change frequently and Idaho Power may not be able to protect against all such actions. Idaho Power actively monitors developments in cybersecurity and is involved in various related government and industry groups, and the company’s board receives security updates at least quarterly. Although Idaho Power continues to make investments in its cybersecurity program, including personnel, technologies, and training of personnel, thereThere can be no assurance that theseIdaho systemsPower's orcybersecurity their expected functionalitymeasures will be implemented, maintained, or expanded effectively;effective, nor can security measures completely eliminate the possibility of a cybersecurity breach. Further, the implementation of security guidelines and measures has resulted in, and Idaho Power expects to continue to result in, increased costs.

Reworded

Changes in capital expenditures for infrastructure and the risks associated with permitting and construction of utility infrastructure can significantly affect IDACORP's and Idaho Power's financial condition and results of operations. Idaho Power’s business is capital intensive and requires significant investments in power supply, transmission, and distribution infrastructure. A significant portion of Idaho Power’s facilities were constructed many years ago, and thus require periodic upgrades and frequent maintenance. Also, short-term and long-term anticipated increases in both the number of customers and the demand for energy require expansion and reinforcement of that infrastructure as described in Idaho Power's 20232025 IRP. Idaho Power is participating in three high-voltage transmission line projectsprojects, has applied for a CPCN for additional gas-fueled generating capacity next to an existing gas power plant, and has also entered into contracts to purchasepurchase, own, and ownutilize, 300 MW of wind generation and 1,3201,400 MWh of new battery storage assets expected to come online from 20252026 to 2027,2028, as well as issued RFPs for new resources, which are intended to help meet increasing customer energy demands. The level of investments that Idaho Power expects to make in capital improvements and expenditures for infrastructure projects over the next five years is roughlyover double$1.2 whatbillion itper wasyear inon the immediately preceding five years.average. These projects are subject to usual permitting and construction risks that can adversely affect project costs and the completion time. These risks include, as examples:

Reworded

•defaults and delays by suppliers and contractors, including delays for specialty equipment that requirerequires significant lead times;

Reworded

Demand for power could exceed supply,Idaho Power's available generation capacity, particularly in light of the rapid addition of new industrial and commercial customer load, resulting in deliverability risks and increased costs for, or difficulty in, purchasing capacity in the market or acquiring or constructing additional generation resources and battery storage facilities. Idaho Power's 20232025 IRP identified a low-cost preferred resource portfolio and action plan for the next 20-year period that includes adding substantial renewable resources and the conversion from coal to natural gas of two units at the Jim Bridger plant in 2024, the two units at the North Valmy plant inby 2026,mid-2026 and the remaining two units at the Jim Bridger plant in 2030. As Idaho Power implements the IRP's action plan, it remains obligated to provide reliable and affordable energy to its customers, but there are certain potential deliverability and cost risks associated with implementation. These risks include, but are not limited to, (1) the failure to timely obtain or construct additional resources to meet forecast needs related to load growth, (2) the rapid addition of new industrial and commercial customer load and the volatility of such new load demand, (3) increased renewable energy generation presenting risks of uncertainty and variability that could be further compounded as neighboring systems transition towards increasing levels of renewable resources, and (4) increased potential resource volatility due to changes in the energy market. During peak periods, power demand could exceed, and on occasion has exceeded, Idaho Power’s available generation capacity, particularly if Idaho Power’s power plants are not performing as anticipated and additional resources and battery storage are not available as needed to meet demand. Competitive market forces or adverse regulatory actions may require Idaho Power to purchase capacity and energy from the market, if such resources are even available for purchase, or build additional resources to meet customers’ energy needs in an expedited manner. If that occurs, Idaho Power may be unable to recover these additional costs and could experience a lag between when costs are incurred and when regulators permit recovery in customers’ rates, which could have negative impacts on operations and cash flows.

Reworded

Factors contributing to lower hydropower generation can increase costs and negatively impact IDACORP's and Idaho Power's financial condition and results of operations. Idaho Power derives a significant portion of its power supply from its hydropower facilities. During 20242025 and 2023,2024, 5452 percent and 5554 percent, respectively, of Idaho Power's electric power from Idaho Power-owned generation was from hydropower facilities. Due to Idaho Power’s heavy reliance on hydropower generation, the impacts of factors such as precipitation and snowpack, the timing of run-off, requirements for flood control, and the availability of water in the Snake River Basin can significantly affect its operations. The combination of a long-term trend of declining Snake River base flows, over-appropriation of water, and periods of drought have led to water rights disputes and proceedings among surface water and ground water irrigators and the State of Idaho. Recharging the Eastern Snake Plain Aquifer by diverting surface water to porous locations and permitting it to sink into the aquifer is one approach to the over-appropriation dispute. Diversions from the Snake River for aquifer recharge or the loss of water rights reduce Snake River flows available for hydropower generation. When hydropower generation is reduced, Idaho Power must increase its use of more expensive thermal generating resources and market power purchases; therefore, costs increase and opportunities for wholesale energy sales are reduced, reducing revenues and potentially earnings. Through its power cost adjustment mechanisms, Idaho Power expects to recover most (but not all) of theany increase in net power supply costs caused by lower hydropower generation. The timing of recovery of the increased costs, however, may not occur until the subsequent power cost adjustment year, adversely affecting cash flows and liquidity.

Reworded

Idaho Power’s use of coal and natural gas to fuel power generation facilities exposes it to commodity availability and price risk, which can adversely affect IDACORP's and Idaho Power's results of operations and financial condition. As part of its normal business operations, Idaho Power purchases coal and natural gas in the open market or under short-term or long-term contracts, often with variable pricing terms. Market prices for coal and natural gas are volatile and influenced by factors impacting supply and demand such as weather conditions, the adequacy and type of generating capacity, fuel transportation availability, economic conditions, regulations related to GHG emissions, and changes in technology, moratoriums on federally leased coal, and increases in coal lease costs.technology. Natural gas transportation to Idaho Power's three natural gas plants in Idaho is limited to one primary pipeline, and natural gas transportation to each of the Jim Bridger plant and the North Valmy plant is also limited to a separate, single pipeline,pipeline for each plant, presenting a heightened possibility of supply constraint and disruptions separate from the risk of counterparty default. Idaho Power's current coal supply arrangements are under long-term contracts for coal originating in Wyoming, Utah, and Colorado, and thus Idaho Power is exposed to risk of disruption of coal production in, or transportation from, thoseits regions.coal suppliers. Idaho Power may from time to time enter into new, or renegotiate, these contracts but can provide no assurance that such contracts will be negotiated or renegotiated on satisfactory terms, or at all. There also can be no assurance that counterparties to the natural gas or coal supply agreements will fulfill their obligations to supply natural gas or coal, and they may experience regulatory, financial, or technical problems or unforeseeable events that inhibit their ability to deliver natural gas or coal. DisruptionsWhen the conversion of North Valmy plant unit 2 to gas firing is completed, approximately 40 percent of Idaho Power's generation resources, measured by nameplate capacity, will be fueled by natural gas. Any disruptions in transportation of fuel and defaults by coalnatural gas and natural gascoal suppliers may cause Idaho Power to seek alternative, and potentially more costly, sources of fuel or rely on other generation sources or wholesale market power purchases.purchases, if available. Idaho Power's failure to provide service due to such disruptions may also result in fines, penalties, or cost disallowances through the regulatory process. Idaho Power may not be able to fully or timely recover these increased costs through rates and power cost adjustment mechanisms, which may adversely affect IDACORP's and Idaho Power's financial condition and results of operations.

Reworded

Idaho Power’s power supply, transmission, and distribution facilities are subject to numerous operational risks unique to it and its industry, including circumstances causing power outages, injuries and property damage, loss of life, and fires. Operating risks associated with Idaho Power's power supply, transmission, and distribution facilities include equipment failures, volatility in fuel and transportation pricing, interruptions in fuel supplies, increased regulatory compliance costs, changes necessitated by environmental legislation or litigation, labor disputes or attrition, accidents and workforce safety matters, environmental damage, property damage, wildfires, acts of terrorism or war or sabotage (both cyber and asset-based), disruptions in supply chains or price increases resulting in the inability to obtain needed equipment or materials on reasonable terms or at all, the loss of cost-effective disposal options for solid waste such as coal ash, operator error, and the occurrence of catastrophic events at the facilities. Idaho Power maintains business continuity and disaster recovery plans, but such plans may be inadequate or not function as anticipated, which could result in delayed recovery after any such events. Diminished availability or performance of those facilities could result in reduced customer satisfaction, reputational harm, liability to third parties (including tort liability),parties, and regulatory inquiries and fines. Operation of Idaho Power's owned and co-owned generating stations below expected capacity levels, or unplanned outages at these stations, could cause reduced energy output and lower efficiency levels and result in lost revenues and increased expenses for alternative fuels or wholesale market power purchases. Further, during high-load periods and other extraordinary events such as wildfires, the transmission system servicing Idaho Power's service area in the past has been, and in the future may be, constrained, limiting the ability to transmit electric energy within the service area and access electric energy from outside the service area. Idaho Power's transmission facilities are also interconnected with those of third parties, and thus operation of Idaho Power's and third-parties' facilities could be adversely affected by unexpected or uncontrollable events, such as wildfires. These transmission constraints and events could result in failure to provide reliable service to customers and the inability to deliver energy from generating facilities to the power grid, and the inability to access lower cost sources of electric energy. Idaho Power also enters into agreements with third-party contractors to perform work on its power supply, transmission, and distribution facilities, and may in some circumstances retain liability for the quality and completion of those contractors’ work, potentially subjecting Idaho Power to penalties, liability for personal injury, loss of life, or property damage, reputational harm, or enforcement actions or liability if a contractor violates applicable laws, rules, regulations, or orders.

Reworded

Accidents, acts of terrorism or war, electrical contacts, fires, explosions, catastrophic failures, general system damage or dysfunction, intentional acts of destruction, uncontrolled release of water from hydropower dams, and other unplanned events related to Idaho Power's infrastructure would increase repair costs and may expose Idaho Power to liability for personal injury, loss of life, and property damage. Idaho Power maintains insurance coverage for such operating and event risks, but insurance coverage is subject to terms and limitations and may not be sufficient to cover Idaho Power’s ultimate liability. Idaho Power may be unable to recover costs in excess of insurance through customer rates or regulatory mechanisms and, even if such recovery is possible, it could take several years to collect. If the amount of insurance is insufficient or otherwise unavailable, and if Idaho Power is unable to fully recover in rates the costs of uninsured losses, IDACORP’s and Idaho Power’s financial condition, results of operations, or cash flows could be materially adversely affected.

Reworded

IDACORP's and Idaho Power's activities are concentrated in one industry and in one region, which exposes it to risks from lack of diversification, regional economic conditions, and regional legislation and regulation. IDACORP and Idaho Power do not have diversified operations or sources of revenue. Idaho Power comprises nearly all of IDACORP's operations, and Idaho Power's business is concentrated solely in the electric power industry. Furthermore, Idaho Power's provision of electric service to retail customers is conducted exclusively in its southern Idaho and eastern Oregon service area and, following completion of the Oregon Sale, will be conducted exclusively in its southern Idaho service area. As a result, IDACORP's and Idaho Power's future performance, revenues, and collectability of revenues, as well as expenses, will be affected by regional economic conditions, regulatory and legislative activity, weather conditions, and other events and conditions in its service area and in the electric power industry.

Reworded

Co-owners of Idaho Power’s generation and transmission assets may have unaligned goals and positions due to the effects of legislation, regulations, capital requirements, load growth amounts, changes in its industry, or other factors, which could at times adversely impact Idaho Power’s ability to construct and operate those facilities in a manner most suitable to Idaho Power. Idaho Power owns certainsome of its generation and transmission assets jointly with other owners, with varying ownership interests in such facilities, and Idaho Power plans to develop and own assets jointly in the future. While there are advantages to joint ownership of resources, there are also restrictions imposed by the joint ownership and operating agreements for those facilities that provide rights, but also restrictions, on when and how the facilities are constructed and on how they are operated. Changes in the nature of Idaho Power’s industry and the economic viability of certain plants and facilities, including impacts resulting from types and availability of other resources, fuel costs, and legislation and regulation, together with timing considerations related to expiration of permits or leases or other agreements for such facilities and other factors, could result in unaligned positions among co-owners. While Idaho Power negotiates and enforces its rights and obligations thoughtfully, differences in the co-owners’ willingness or ability to continue their participation or the timing of facility construction, modification, or decommissioning could lead to restrictions and disruptions to operations, adverse financial impacts to Idaho Power, and/or uncertainty related to the resulting cost recovery of such assets.

Reworded

Changes in legislation, regulation, and government policy may have a material adverse effect on IDACORP’s and Idaho Power’s business in the future.business. Legislative and regulatory proposals and recently enacted legislation that could have a material impact on IDACORP and Idaho Power include, but are not limited to, changes in tax policy or utility regulation, carbon-reduction initiatives, infrastructure renewal programs, climate change and environmental regulation, and modifications to accounting and public company reporting requirements. Further, the proposals and new legislation could have an impact on the rate of growth of Idaho Power’s customers and their willingness to expand operations and increase electric service requirements. Under the newcurrent Presidential Administration, Idaho Power expectsseveral laws, regulations, executive orders, and policies relating to environmental compliance, tax, and other matters tohave changechanged from those of the previous Presidential AdministrationAdministration, with further changes proposed. These changes, in some cases, have required, and couldmay requirein the future require, IDACORP and Idaho Power and some of their customers to modify their business strategy, activities, and projects due to change or uncertainty in the regulatory environment. For example, in January 2025, the United States again opted out of the Paris Agreement on climate change that would require commitments related to GHG emissions, among other things. It is possible that a future Presidential Administration may cause the United States to adopt the Paris Agreement again or enter into a similar agreement. Many states and localities may continue to pursue climate policies in addition to federal mandates.projects. Failure to comply with environmental laws and regulations, even if such non-compliance is caused by factors outside of Idaho Power's control, may result in the assessment of civil or criminal penalties or fines, or government enforcement actions. Idaho Power could also become subject to climate change lawsuits and an adverse outcome could require substantial expenditures and could possibly require payment of damages. IDACORP and Idaho Power expect federal, state, and local governmental authorities to implement various recent and future executive orders from the new Presidential Administration and are unable to predict whether and to what extent such actions will meaningfully change existing legislative and regulatory environments relevant to the companies, or if any such changes would have a net positive or negative impact on the companies. Idaho Power is unable to estimate the costs of complying with suchrecent legislative orand regulatory changes due to the uncertainties associated with the nature and implementation of the changes, and may not be able to recover the associated costs. To the extent that such changes have a negative impact on the companies or Idaho Power’s customers, including as a result of related uncertainty, these changes may materially and adversely impact IDACORP’s and Idaho Power’s business, financial condition, results of operations, and cash flows.

Reworded

Changes in income tax laws and regulations, or differing interpretation or enforcement of applicable laws by the U.S. Internal Revenue Service or other taxing jurisdictions, could have a material adverse impact on IDACORP’s or Idaho Power’s financial condition and results of operations. IDACORP and Idaho Power must make judgments and interpretations about the application of the law when determining the provision for income taxes. Amounts of income tax-related assets and liabilities involve judgments and estimates of the timing and probability of recognition of income, deductions, and tax credits, which are subject to challenge by taxing authorities. These judgments may include estimates for potential outcomes regarding tax positions that may be subject to challenge by the taxing authorities. Disputes over interpretations of tax laws may be settled with the taxing authority in examination, upon appeal, or through litigation. The outcome of potential future income tax proceedings or laws, or the state public utility commissions' treatment of those outcomes, could differ materially from the amounts IDACORP and Idaho Power record prior to conclusion of those proceedings, and the difference could negatively affect IDACORP’s and Idaho Power’s earnings and cash flows. Further, in some instances, the treatment from a ratemaking perspective of any net income tax expense (including from increased tax rates) or benefit could be different than IDACORP or Idaho Power anticipate or request from applicable state regulatory commissions, which could have a negative effect on their financial condition and results of operations. The unavailability of expected tax credits or other tax benefits, whether due to a change in law, interpretation, or otherwise, could also have an adverse impact on the economic viability of certain of itsIdaho Power's planned or existing facilities. In addition, Idaho Power uses the regulatory flow-through income tax accounting method as described in Note 1 - "Summary of Significant Accounting Policies" to the consolidated financial statements included in this report, and potential changes in income tax laws or interpretations may impact IDACORP's and Idaho Power's income taxes and reporting obligations differently than most other companies.

Added

Changes in U.S. trade policy and the impact of tariffs could have an adverse effect on Idaho Power's business and results of operations. The U.S. government has implemented and may continue to implement significant trade policy and tariff actions, including but not limited to tariffs on imported steel and aluminum products, tariffs on certain imports from China, Canada, and Mexico, and baseline tariffs on imports from many other countries. If regulators do not deem prudent the increased costs for Idaho Power's projects or maintenance of its existing facilities resulting from tariffs or other trade policy, Idaho Power may be unable to recover those increased costs through rates in full or at all or on a timely basis. Any inability of Idaho Power to recover increased costs could result in impairment or otherwise materially adversely affect IDACORP's and Idaho Power's financial condition and results of operations. Further, if as a result of increased costs due to tariffs or other trade policies, other resources become more economical, Idaho Power may terminate uneconomical projects and seek to develop those other resources. If any projects are canceled because they are no longer economical, Idaho Power could incur significant cancellation penalties under purchase orders or construction contracts.

Reworded

In addition, some environmental regulations are currently subject to litigation or other uncertainty, including due to changes instituted by the newcurrent Presidential Administration. As a result, approaches to comply with the regulations, including available control technologies or other allowed compliance measures, are unpredictable and Idaho Power cannot foresee the potential impacts these regulations would have on Idaho Power's operations or financial condition. In 2019, Idaho Power announced its long-term goal to serve customers with 100-percent clean energy by 2045, and Idaho Power has short-termannounced long-term, medium-term, and medium-termshort-term goals for CO2 emission reductions, which could impact infrastructure resource decisions and costs. Idaho Power's ability to achieve these targets are subject to a number of risks and uncertainties, including the company's regulatory obligation to serve its customers, the availability and cost of new generation resources, legal and permitting requirements, system operation and energy integration, and grid balancing, among others. Additionally, Idaho Power is not guaranteed timely or full recovery through customer rates of costs associated with environmental regulations, environmental compliance, its clean energy initiatives, plant closures, or clean-up of contamination. If there is a delay in obtaining any required environmental regulatory approval or if Idaho Power fails to obtain, maintain, or comply with any such approval, construction and/or operation of Idaho Power's generation or transmission facilities could be delayed, halted, terminated, or subjected to additional costs. For further discussion of environmental matters that may affect Idaho Power, see "Environmental Matters" in Item 7 - MD&A in this report.

Reworded

IDACORP and Idaho Power are subject to costs and other effects of legal and regulatory proceedings, disputes, and claims. From time to time in the normal course of business, IDACORP and Idaho Power are subject to various lawsuits, regulatory proceedings, disputes, and claims that could result in adverse judgments or settlements, fines, penalties, injunctions, or other adverse consequences. These matters are subject to a number of uncertainties, and management is often unable to predict the outcome of such matters;matters. resultingResulting liabilities could exceed amounts currently reserved or insured against with respect to such matter. The legal costs and final resolution of matters in which IDACORP or Idaho Power are involved could have reputational impact and a short- or long-term negative effect on their financial condition and results of operations. Addressing any adverse publicity or governmental scrutiny could be time consuming and expensive, regardless of the basis of the assertions being made, and could impact Idaho Power's relationship with employees, stakeholders, and regulators. Further, the terms of resolution could require the companies to change their operational practices and procedures, which could also have a negative effect on their financial positions and results of operations.

Reworded

Changes in accounting standards or rules may impact IDACORP's and Idaho Power's financial results and disclosures. The Financial Accounting Standards Board and the SEC have made and may continue to make changes to accounting standards that impact presentation and disclosures of financial condition and results of operations. Further, new accounting orders issued by the FERC could significantly impact IDACORP's and Idaho Power's reported financial condition. IDACORP and Idaho Power do not have any control over the impact these changes may have on their financial conditions or results of operations nor the timing of such changes. Idaho Power meets the requirements under GAAP to reflect the impact of regulatory decisions in its financial statements and to defer certain costs as regulatory assets until those costs are collected in rates, and to defer some items as regulatory liabilities. If recovery of these amounts ceases to be probable, if Idaho Power determines that it no longer meets the criteria for applying regulatory accounting or if accounting rules change to no longer provide for regulatory assets and liabilities, Idaho Power could be required to eliminate some or all of those regulatory assets or liabilities. Any of these circumstances could result in write-offs and have a material adverse effect on IDACORP's and Idaho Power’s financial condition and results of operations.

Reworded

Volatility or disruptions in the financial markets, failure of IDACORP or Idaho Power to satisfy conditions necessary for obtaining loans or issuing debt securities, and denial of regulatory authority to issue debt or equity securities, may negatively affect IDACORP’s and Idaho Power’s ability to access capital and/or increase their cost of borrowing and ability to execute on their strategic plans. IDACORP and Idaho Power use credit facilities, commercial paper markets, long-term debt, and equity securities as significant sources of liquidity and funding for operating and capital requirements and debt maturities not satisfied by operating cash flow. IDACORP has over $600 million of FSAs outstanding from forward sales of its common stock. Settlement of those FSAs is subject to the conditions specified in the FSAs, and there is a risk that the counterparties to the FSAs may not perform their obligations under the FSAs. Credit facilities represent commitments by the participating banks to make loans and issue letters of credit. However, the ability and obligation of the participating banks to make those loans and issue letters of credit is subject to specified conditions and volatility or disruptions in the financial markets could affect the companies' ability to obtain debt financing or draw upon or renew existing credit facilities on favorable terms and comply with debt covenants. Idaho Power's ability to issue long-term debt is also subject to a number of conditions included in an indenture, and IDACORP's and Idaho Power's ability to issue long-term debt, commercial paper, and equity securities is subject to the availability of purchasers willing to purchase the securities under reasonable terms or at all. Because of these limitations, IDACORP and Idaho Power may be unable to issue commercial paper, short-term or long-term debt, or equity securities on reasonable terms or at all. Higher interest rates on short-term borrowings with variable interest rates could also have an adverse effect on IDACORP's and Idaho Power's operating results. Changes in interest rates may also impact the fair value of the debt securities in Idaho Power's pension funds, as well as Idaho Power's ability to earn a return on short-term investments of excess cash. Also, while the credit facilities represent a contractual obligation to make loans, one or more of the participating banks may default on their obligations to make loans under, or may withdraw from, the credit facilities.

Reworded

A downgrade in IDACORP’s and Idaho Power’s credit ratings could affect the companies’ ability to access capital, increase their cost of borrowing, and require the companies to post collateral with transaction counterparties. Credit rating agencies periodically review the corporate credit ratings and long-term ratings of IDACORP and Idaho Power. These ratings are premised on financial ratios and performance, the regulatory environment and rate mechanisms, the effectiveness of management, resource risks and power supply costs, and other factors. IDACORP and Idaho Power also have borrowing arrangements that rely on the ability of the banks to fund loans or support commercial paper, a principal source of short-term financing. In addition, IDACORP's or Idaho Power's credit ratings may change as a result of change in the methodologies used by the various rating agencies. Downgrades of IDACORP’s or Idaho Power’s credit ratings, or those affecting relationship banks, could limit the companies’ ability to access short- and long-term capital under reasonable terms or at all, reduce the pool of potential lenders, increase borrowing costs under the Credit Facilities, limit access to the commercial paper market, require the companies to pay a higher interest rate on their debt, limit the ability of IDACORP to declare and make dividends, and require the companies to post additional performance assurance collateral with transaction counterparties. If access to capital were to become significantly constrained or costs of capital increased significantly due to lowered credit ratings, prevailing industry conditions, regulatory constraints, the volatility of the capital markets, or other factors, IDACORP's and Idaho Power's ability to pursue improvements or acquisitions (including generating capacity and transmission assets, which may be necessary for future growth), liquidity, financial condition, and results of operations could be adversely affected.

Reworded

Idaho Power’s energy risk management policy and programs relating to economically hedging commodity exposures and credit risk may not always perform as intended, and as a result, IDACORP and Idaho Power may suffer losses. Idaho Power enters into transactions to buy and sell power, natural gas, and transmission service, enters into transactions to hedge its positions in coal, natural gas, power, and other commodities, and enters into economic hedge transactions to mitigate in part exposure to variable commodity prices. IDACORP and Idaho Power could recognize losses as a result of volatility in the market value of these contracts or if a counterparty fails to perform. The derivative instruments used for hedging might not offset the underlying exposure being mitigated as intended, due to pricing inefficiencies or other terms of the derivative instruments, and any such failure to mitigate exposure could result in losses. Certain of Idaho Power's purchase or sale, hedging, and derivative agreements may result in the receipt of, or posting of, collateral with counterparties. Fluctuations in commodity prices that lead to the posting of collateral with counterparties negatively impact liquidity, and downgrades in Idaho Power's credit ratings may lead to additional collateral posting requirements. In 2024,2025, Idaho Power recorded losses on economic hedges of $63.3$37.7 million, compared with $16.2$63.3 million of losses in 2023.2024. At times, Idaho Power’s energy risk management policy results in Idaho Power entering into economic hedges in an environment where prices are high, and if prices are lower at the time the economic hedge settles, Idaho Power will record losses on the economic hedges.hedges, Dependingwhich on the volume of economic hedges and the degree of price volatility, those losses cancould be substantial,substantial. and theThe power cost adjustment mechanisms generally provide that Idaho Power will incur a portion of those losses. Forecasts of future fuel needs and loads and available resources to meet those loads are inherently uncertain and may cause Idaho Power to over- or under-hedge actual resource needs, exposing the company to market risk on the over- or under-hedged position. To the extent that commodity markets are illiquid, Idaho Power may not be able to execute its risk management strategies, which could result in undesired over-exposure to unhedged positions that Idaho Power may not be able to collect in customer rates. The FERC may take action to limit volatility in the energy market by imposing price limits or other market restrictions to control rates in market-based sales, which could adversely affect the companies' financial results. As a result, risk management actions, or the failure or inability to manage commodity availability and price and counterparty risk, may adversely affect IDACORP’s and Idaho Power’s financial condition and results of operations. Idaho Power has additional indirect credit exposures to financial institutions in the form of letters of credit provided as security by power suppliers under various purchased power contracts, by vendors for infrastructure development projects, and by customers or potential customers. If any of the credit ratings of the letter of credit issuers were to drop below investment grade, the vendor, supplier, customer, or potential customer would need to replace the security with an acceptable substitute, which may be impracticable and may expose Idaho Power to losses resulting from a default of the counterparty. If the security were not replaced, the counterparty could be in default under the contract and Idaho Power's remedies for default may be inadequate to fully compensate Idaho Power for its losses. Further, the bankruptcy or insolvency of a counterparty to commodity or other transactions could impair Idaho Power’s ability to collect amounts receivable from those counterparties, potentially including the ability to collect or retain collateral posted by a counterparty.

Added

Idaho Power has additional indirect credit exposures to financial institutions in the form of letters of credit provided as security by power suppliers under various purchased power contracts, by vendors for infrastructure development projects, and by customers or potential customers. If any of the credit ratings of the letter of credit issuers were to drop below investment grade, the vendor, supplier, customer, or potential customer would need to replace the security with an acceptable substitute, which may be impracticable and may expose Idaho Power to losses resulting from a default of the counterparty. If the security were not replaced, the counterparty could be in default under the contract and Idaho Power's remedies for default may be inadequate to fully compensate Idaho Power for its losses. Further, the bankruptcy or insolvency of a counterparty to commodity or other transactions could impair Idaho Power’s ability to collect amounts receivable from those counterparties, potentially including the ability to collect or retain collateral posted by a counterparty.

Reworded

The performance of pension and postretirement benefit plan investments, increasing health care costs, and other factors impacting plan costs and funding obligations could adversely affect IDACORP's and Idaho Power's financial condition and results of operations - primarily cash flows and liquidity. Idaho Power provides a noncontributory defined benefit pension plan covering most employees, as well as a defined benefit postretirement benefit plan (consisting of health care and death benefits) that covers eligible retirees. Costs of providing these benefits are based in part on the value of the plans' assets and, therefore, adverse investment performance for these assets or the failure to maintain sustained growth in pension investments over time could increase Idaho Power’s plan costs and funding requirements related to the plans. Idaho Power's self-insured costs of health care benefits for eligible employees and retirees have increased in recent years and Idaho Power believes that future legislative changes related to the provision of health care benefits and other external market conditions and factors, could cause such costs tocould continue to rise. As benefit costs continue to rise, there is no assurance that the IPUC and OPUC will continue to allow recovery.

Reworded

IDACORP's charter and bylaws and Idahovarious orlegal Oregonand lawregulatory factors could delay or prevent a change in control that shareholders may favor. The terms of some of the provisions in IDACORP's articles of incorporation and bylaws and provisions of Idaho or Oregon law could delay or prevent a change in control that shareholders may favor or may impede the ability of shareholders to change IDACORP's management. In particular, the provisions of IDACORP's articles of incorporation and bylaws authorize issuance of up to 20,000,000 shares of preferred stock without further action by shareholders; limit the shareholders’ right to remove directors, fill vacancies, and change the number of directors; regulate how shareholders may present proposals or nominate directors for election at shareholders’ meetings; and require a supermajority vote of shareholders to amend certain provisions. IDACORP is also subject to the provisions of the Idaho Control Share Acquisition Act and the Idaho Business Combination Act, which provide for certain procedures and restrictions in connection with acquisitions or business combinations. In addition, Oregon law requires shareholders to obtain advance approval from the OPUC before acquiring 5% stock ownership in an Oregon public utility.utility, which law Idaho Power expects to apply to it until such time, if any, as the Oregon Sale is consummated. Any of the above provisions could delay or prevent a change in control of Idaho Power. Even if IDACORP's board of directors were to favor a sale of the company, a sale would require approval of a number of federal and state regulatory agencies, including the FERC, the IPUC, OPUC, and WPSC. The approval process could be lengthy and the outcome uncertain, which may deter otherwise interested parties from proposing or attempting a business combination.

Removed

Statutory and regulatory factors will limit another party’s ability to acquire IDACORP and could deprive shareholders of the opportunity to gain a takeover premium for their shares of common stock. Even if IDACORP's board of directors favors a sale of the company, a sale would require approval of a number of federal and state regulatory agencies, including the FERC, the IPUC, the OPUC, and the WPSC. The approval process could be lengthy and the outcome uncertain, which may deter otherwise interested parties from proposing or attempting a business combination.

Management's Discussion & Analysis (MD&A) (10-K Item 7)

59new paragraphs
32removed paragraphs
128reworded paragraphs
23,178 → 24,110words in section

New heading “EPA Proposed Regulatory Actions”

New heading “One Big Beautiful Bill Act”

New heading “Executive Orders of the Current Presidential Administration”

New heading “Idaho's Wildfire Standard of Care Act”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

Removed text topics: supply chain, inflation, labor
“GWW Transmission Line: Idaho Power and PacifiCorp are pursuing the joint development of the GWW project, a high-voltage transmission line project between a substation located near Douglas, Wyoming, and the Hemingway substation located near Boise, Idaho. In 2012, Idaho Power and PacifiCorp entered a joint funding agreement for permitting of the project. Idaho Power has expended approximately $67 million, including Idaho Power's AFUDC, for its share of the permitting phase of the project through December 31, 2024. …”
see in full comparison
Removed text topics: penalt, regulation
“•Regulatory and Environmental Compliance Costs; Coal Plant Retirements: Idaho Power is subject to extensive federal and state laws, policies, and regulations, as well as regulatory actions and audits by agencies and quasi-governmental agencies, including the FERC, the North American Electric Reliability Corporation, and the Western Electricity Coordinating Council. Compliance with these requirements directly influences Idaho Power's operating environment and affects Idaho Power's operating costs. …”
see in full comparison
New text topics: tariff, regulation
“In addition, the court system has become more active in reviewing Presidential and agency actions, resulting in even less certainty as to the outcome and durability of rules that are administratively implemented. Changes to or elimination of regulations may lower Idaho Power's costs of operating and maintaining fossil fuel-fired generation plants and constructing transmission lines, due to the reduction of potential environmental infrastructure upgrades or conversions or reduction or elimination of permitting requirements. …”
see in full comparison
New text topics: tariff, regulation
“Beginning in January 2025, the current Presidential Administration has released several executive orders that may impact Idaho Power. These executive orders include, but are not limited to, orders regarding tariffs, the electric grid, the coal industry, revocation of executive orders of prior Presidential Administrations, federal grantmaking, and other orders intended to regulate international trade, strengthen the U.S. energy industry, and/or promote deregulation, including with respect to environmental and energy-related regulations. The outcome of these executive orders and U.S. …”
see in full comparison
Removed text topics: litigation, climate
“Climate-Related Disclosures: In March 2024, the SEC issued a final rule on the enhancement and standardization of climate-related disclosures for investors. In April 2024, the SEC voluntarily stayed the effectiveness of the rule, pending the resolution of litigation challenging the rule in the U.S. Court of Appeals for the Eighth Circuit. If the rule becomes effective, it could require IDACORP and Idaho Power to make various additional climate-related disclosures, including regarding its Scope 1 and Scope 2 GHG emissions, if material. …”
see in full comparison
Reworded topics: supply chain, inflation, labor

Paragraph as it now reads, with added and removed wording marked:

Total cost estimates for the project are between $1.5 billion and $1.7 billion, including Idaho Power's AFUDC. The capital requirements table above includes approximately $500$415 million of Idaho Power's share of estimated costs (excluding AFUDC) related to the remaining permitting phase, design, material procurement,procurement and construction phases of the project. Actual construction costs could differ from Idaho Power's estimates based upon Idaho Power’s or its contractors ability to timely obtain labor or materials at reasonable costs, supply chain disruptions and delays, inflationary pressures, macroeconomic conditions, or other issues.
see in full comparison
Full comparison: every changed paragraph (219)

Green = added, red = removed. Unchanged paragraphs, 30 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

In this MD&A insection of this report, the general financial condition and results of operations for IDACORP and its subsidiaries and Idaho Power and its subsidiary are discussed. The discussion of IDACORP's and Idaho Power's general financial condition and results of operations for 20232024 compared with 20222023 can be found in their Annual Report on Form 10-K for the year ended December 31, 2023.2024. See Part II - Item 7 - MD&A in that report for further information on the companies' prior period results of operations. While reading thethis MD&A, please refer to the accompanying consolidated financial statements of IDACORP and Idaho Power. Also refer to "Cautionary Note Regarding Forward-Looking Statements" and Part I - Item 1A - "Risk Factors" in this report for important information regarding forward-looking statements made in this MD&A section and elsewhere in this report.

Reworded

IDACORP is a holding company whose principal operating subsidiary is Idaho Power. IDACORP’s common stock is listed and trades on the New York Stock Exchange under the trading symbol "IDA". Idaho Power is an electric utility whose rates and other matters are regulated by the IPUC, OPUC, and FERC. Idaho Power generates revenues and cash flows primarily from the sale and distribution of electricity to customers in its Idaho and Oregon service areas, as well as from the wholesale sale and transmission of electricity. On February 13, 2026, Idaho Power entered into a definitive agreement to sell its Oregon electric distribution business and associated distribution assets, as well as certain Oregon transmission assets, to OTEC. The closing of the transaction is subject to various conditions, including approvals of the OPUC, IPUC, and FERC. For further information regarding the proposed transaction, see Note 22 - "Sale of Oregon Assets" to the consolidated financial statements included in this report.

Reworded

IDACORP is committed to its focus on competitive total returns and generating long-term value for shareholders. IDACORP’s business strategy emphasizes Idaho Power as IDACORP’s core business, since Idaho Power’s regulated electric utility operations are the primary driver of IDACORP’s operating results. This strategy is described in Part I, Item 1 - "Business - Business Strategy" of this report. Examples of IDACORP's and Idaho Power's achievements, notable events, and milestones during 2024 and during 2025, through the date of this report,2025 include the following:

Reworded

•IDACORP achieved net income growth for aan seventeentheighteenth consecutive year in 2024.2025.

Reworded

•Idaho Power continues to focus on timely recovery of costs and earning a reasonable return on investment. In December 2024 and January 2025, the IPUC issuedapproved ana ordersettlement andstipulation an(2025 errataSettlement Stipulation) related to the order, respectively, in Idaho Power's limited issuegeneral rate case filing,that Idaho Power had filed in May 2025, with new rates effective January 1, 2025, designed to increase annual Idaho-jurisdiction retail revenue by $50.1 million. In addition, in September 2024, the OPUC approved three partial settlement stipulations related to Idaho Power's Oregon general rate case filing that it made in December 2023, with rates effective October 15, 2024, designed to increase annual Oregon-jurisdiction retail revenue by $6.7 million.2026. The Idaho2025 limitedSettlement issueStipulation rate case and Oregon general rate case filings areis described more fully in Note 3 - "Regulatory Matters" to the consolidated financial statements included in this report and in "Regulatory Matters" in this MD&A.

Reworded

•Idaho Power's customer count grew 2.62.3 percent in 20242025 and Idaho Power's MWh sales to retail customers in 20242025 were the highest in its history, surpassing the previous record set in 2022,2024, reflecting considerablecontinued growth in its service area.

Removed

•Idaho Power reached new winter and summer peaks during 2024. Idaho Power's new winter peak demand of 2,719 MW and summer peak demand of 3,793 MW were reached on January 16, 2024 and July 22, 2024, respectively. The prior highest demand peaks were 2,604 MW and 3,751 MW, reached in December 2022 and June 2021, respectively.

Reworded

•Idaho Power’s third-party ratings for residential and business customer satisfaction remain strong – in 2025, it was the third-rankedhighest ranked utility among peers in the segment for overall customer satisfaction,satisfaction in a third-party survey, and was the second highest in the segment for business customer satisfaction, and the thirdsecond highest in the segment for residential customer satisfaction in 2024.a separate third-party survey.

Reworded

•In September 2024,2025, IDACORP's board of directors approved an increase in the regular quarterly cash dividend on IDACORP’s common stock from $0.83$0.86 per share to $0.86$0.88 per share, as a part of a 187193 percent increase in quarterly dividends approved over the last thirteenfourteen years.

Added

•To help meet growing capacity and energy needs in 2027 and beyond, Idaho Power entered into the following transactions in 2025:

Added

◦an agreement to purchase the output of a 100 MW solar facility, coupled with a 100 MW battery energy storage agreement, with a scheduled online date of June 2027;

Added

◦an agreement to acquire an ownership interest in 250 MW and for rights to an additional 250 MW of northbound capacity on SWIP-N, a planned 285-mile high-voltage transmission line; and ◦an agreement to purchase the output of an 80 MW solar facility, with a scheduled online date of June 2027.

Added

•During 2025, several key projects achieved notable milestones, underscoring significant progress towards Idaho Power addressing peak capacity and energy needs in 2025 and beyond, including the following:

Added

◦Idaho Power commenced construction on the B2H transmission line, with an expected in-service date of late 2027;

Added

◦Idaho Power began receiving power under a 20-year agreement to utilize storage capacity from a third-party 150 MW battery storage facility;

Added

◦80 MW of company-owned battery storage facilities came online, with another 250 MW of company-owned battery storage commencing construction; and ◦Idaho Power filed a CPCN request with the IPUC for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expected in-service date in 2028.

Added

•In June 2025, Idaho Power filed with the Idaho and Oregon public utility commissions its 2025 IRP, its forecast of load and resources for the next 20 years, including the preferred portfolio of resources necessary to meet predicted demands.

Removed

•In connection with its resource planning process, Idaho Power has updated the estimate of load growth that it intends to use for its 2025 IRP. While subject to adjustment, Idaho Power currently plans to use an 8.3 percent annual rate of growth in retail sales volumes over the 2025-2029 time period, representative of anticipated continued strong growth in Idaho Power's service area.

Reworded

•Idaho Power's estimate of capital expenditures from 20252026 to 20292030 is in the range of $5.4$6.3 billion to $6.1$7.2 billion. Part of the increasemagnitude of capital expenditures is driven by Idaho Power's need to acquire additional power supply and transmission resources to meet growing demand. Idaho Power has procured resources under several RFPs, and has RFPs for 2028 and 2029 resources outstanding.

Reworded

The following is a summary of Idaho Power's net income, net income attributable to IDACORP, and IDACORP's earnings per diluted share for the years ended December 31, 2025, 2024, 2023, and 20222023 (in thousands,thousands of dollars and shares, except earnings per share amounts):

Reworded

The table below provides a reconciliation of net income attributable to IDACORP for the year ended December 31, 2024,2025, from the year ended December 31, 20232024 (items are in millions of dollars and are before tax unless otherwise noted):

Reworded

The net increase in retail revenues per MWh, net of power cost adjustment and FCA mechanisms, increased operating income by $52.7$49.6 million in 20242025 compared with 2023.2024. This benefit was primarily due to an overall increase in Idaho base rates, effective January 1, 2024,2025, perfrom the termsoutcome of the 20232024 SettlementIdaho Stipulation.Limited-Issue Rate Case. For more information on the 20232024 SettlementIdaho Stipulation,Limited-Issue Rate Case, see Note 3 - "Regulatory Matters" to the consolidated financial statements included in this report.

Reworded

Idaho Power's customer growth of 2.62.3 percent added $19.0$25.2 million to Idaho Power's operating income in 20242025 compared with 2023.2024. Usage per retail customercustomer, increasednet of associated power supply costs and power cost adjustment and FCA mechanisms, decreased operating income by $4.5$6.5 million in 20242025 compared with 2023.2024. Overall,During 2025, usage per customer was relatively flatdecreased for most customer classes,classes. withMilder temperatures during the year reduced the demand for both space heating and air conditioning. This decrease was partially offset by an increase in irrigation customersusage representingper an increase,customer, as higherlower temperaturesprecipitation during the summer led irrigation customers to run irrigation pumps more frequently. Partially offsetting the revenue impact of decreased usage per customer, a decrease in the deferral of residential and small commercial customer revenues through the FCA mechanism positively impacted retail revenues by $6.8 million.

Added

Other O&M expenses in 2025 were $9.6 million higher than in 2024. This increase was primarily driven by inflationary pressures on labor-related costs, professional services, and increases in statutory fees assessed by regulators.

Removed

Transmission wheeling-related revenues, net of PCA impacts, decreased $3.0 million during 2024 compared with 2023. Effective January 1, 2024, financial settlement of transmission line losses were subject to the PCA mechanism, as approved in the 2023 Settlement Stipulation, resulting in a smaller contribution of those revenues to net income compared with 2023 when the financial settlement of transmission losses was not subject to the PCA mechanism.

Removed

Other O&M expenses in 2024 were $61.1 million higher than in 2023, primarily related to approximately $17.7 million of increased pension-related expenses and an approximate $29.5 million increase in wildfire mitigation program and related insurance expenses. Both of these increases were partially offset by increases in retail revenues, as more of those costs are now recovered in base rates pursuant to the 2023 Settlement Stipulation. Inflationary pressures on labor-related costs also contributed to the increase in other O&M expenses. These increases were partially offset by an $8.5 million increase in deferral of other O&M expenses related to the conversion from coal to natural gas for two units at the Jim Bridger plant.

Reworded

Depreciation and amortization expense increased $28.1$27.7 million in 20242025 compared towith 2023,2024, due primarily to an increase in plant-in-service. Additionally, the start of operations at a leased battery storage facility in the second quarter of 2025 contributed modestly to the increase through amortization of a related right-of-use asset.

Added

Other changes in operating revenues and expenses, net, decreased operating income by $3.8 million in 2025 compared with 2024, due primarily to the successful conclusion of multi-year litigation efforts challenging Idaho and Oregon property tax valuations, which resulted in refunds of prior year taxes being finalized in 2024, which did not reoccur in 2025. In addition, the timing of recording and adjusting regulatory accruals and deferrals positively impacted 2024 results, but did not reoccur in 2025. These decreases were partially offset by recovery of costs of a new finance lease through Idaho Power's power cost adjustment mechanism rates and a decrease in net power supply expenses that were not deferred for future recovery in rates through Idaho Power's power cost adjustment mechanisms.

Removed

Other changes in operating revenues and expenses, net, increased operating income by $30.8 million in 2024 compared to 2023, due partially to a decrease in net power supply expenses that were not deferred for future recovery in rates through Idaho Power's power cost adjustment mechanisms. More moderate wholesale natural gas and power market prices in the western United States and increased wholesale energy sales decreased Idaho Power's net power supply expenses in 2024 compared with 2023. In addition, property taxes contributed to the increase from 2023 to 2024, due primarily to the successful conclusion of multi-year litigation efforts challenging Idaho and Oregon property tax valuations, which resulted in refunds of prior year taxes being finalized in 2024. The change was also partially due to the timing of recording and adjusting regulatory accruals and deferrals.

Reworded

Non-operating expense, net, increased $2.2$22.8 million in 20242025 compared with 2023.2024. Interest expense onHigher long-term debt increasedbalances and an increase in 2024transmission comparedcustomer withdeposits, 2023,on duewhich primarilyIdaho Power must pay interest to the customer, led to an increase in long-terminterest debtexpense. balances.Interest In addition, Idaho Power's earnings from its investment in BCC decreased due toon a decreasenew infinance thelease amountalso included and recovered in base rates pursuantcontributed to the 2023increased Settlementinterest Stipulation.expense Thesecompared increaseswith were2024. This increase was partially offset by an increase in AFUDC incomeduring in 20242025 compared with 2023,2024, as the average construction work in progress balance was higher. Additionally, interest income increased due to higher average cash balances and interest rates compared with 2023.

Reworded

Idaho Power recorded $29.8$40.3 million of additional ADITC amortization under its Idaho regulatory settlement stipulation during 2024,2025, butcompared recordedwith no$29.8 additionalmillion ADITCin amortization during 2023.2024. The $18.6$20.4 million increasedecrease in income tax expense, excluding additional ADITC amortization, in 20242025 compared with 20232024 was primarily due to higher income beforetax incomereturn adjustments for state taxes and variances inplant-related flow-through tax adjustments.items.

Added

To address the regulatory lag in recovery of costs primarily associated with Idaho Power’s current and anticipated significant infrastructure investments, in May 2025 Idaho Power filed a general rate case in Idaho and in October 2025 Idaho Power, the IPUC Staff, and intervening parties filed the 2025 Settlement Stipulation with the IPUC. In December 2025, the IPUC approved the 2025 Settlement Stipulation. The IPUC order related to the 2025 Settlement Stipulation is described more fully in Note 3 - "Regulatory Matters" to the consolidated financial statements included in this report. The 2025 general rate case followed a limited-scope rate case that Idaho Power filed in Idaho in 2024, as well as general rate cases that Idaho Power filed in Oregon and Idaho in 2023. In light of the regulatory lag in recovery of costs within Idaho Power's substantial capital expenditures to address growth, maintain system reliability, and ensure an adequate supply of electricity, Idaho Power is evaluating its potential rate case filings for 2026.

Removed

To address the regulatory lag in recovery of costs primarily associated with Idaho Power’s current and anticipated significant infrastructure investments, including those that are intended to help meet projected near-term capacity deficits, Idaho Power filed a limited-issue rate case in Idaho on May 31, 2024. The IPUC approved, with modifications, the limited-issue rate case in December 2024, with rates effective January 1, 2025, designed to increase annual Idaho-jurisdiction retail revenue by $50.1 million. In September 2024 the OPUC approved the 2024 Oregon Settlement Stipulations related to Idaho Power's Oregon general rate case filing, designed to increase annual Oregon-jurisdiction retail revenue by $6.7 million. The IPUC order related to the limited-issue rate case and the 2024 Oregon Settlement Stipulations are described more fully in Note 3 - "Regulatory Matters" to the consolidated financial statements included in this report.

Removed

Given the limited-scope nature of the filing Idaho Power made in 2024 and its ongoing infrastructure investment, Idaho Power believes it is likely that it will file a general rate case in Idaho during 2025, as early as May 2025.

Reworded

Idaho Power is preparingfiled its 2025 IRP, its 20-year forecast of load and power supply resource options.options, with the IPUC and OPUC in June 2025. Included in the below table are the load forecast assumptions the company anticipates usingused in the 2025 IRP as of the date of this report, andand, for comparison purposes, the analogous average annual growth rates Idaho Power used in the prior two IRPs.

Reworded

Customer growth has contributed to increases in peak loads experienced in recent years. For example, Idaho Power's highest all-time winter peak demand of 2,719 MW occurred on January 16, 2024, and on July 22, 2024, Idaho Power reached a new all-time summer peak demand of 3,793 MW. Idaho Power's prior all-time summer peak demand was 3,751 MW, set in June 2021. Idaho Power believes that existing and sustained growth in customers, load, and peak demand for electricity, the obligation to maintain a safe and reliable system, along with changes in the regional transmission markets that have constrained the availability of transmission outside Idaho Power’s service area to import energy during peak load periods, require Idaho Power to increase its investment in capacity resources, transmission, and distribution infrastructure. This includes the B2H, GWW, and SWIP-N transmission projects, along with other capacity, energy, and transmission resource procurements, described in "Liquidity and Capital Resources" in this MD&A. Idaho Power has begun preparation of its 2027 IRP and expects to prepare an updated load forecast during 2026 as the basis for the 2027 IRP, which Idaho Power expects to file in the summer of 2027.

Reworded

Further, as Idaho Power's hydropower facilities comprise over one-half of Idaho Power's nameplate generation capacity, precipitation levels impact the mix of Idaho Power's generation resources. When hydropower generation decreases, Idaho Power must rely on more expensive generation resources and purchased power. When favorable hydropower generating conditions exist for Idaho Power, they also may exist for other Pacific Northwest hydropower facility operators, lowering regional wholesale market prices and impacting the revenue Idaho Power receives from wholesale energy sales. Much of the adverse or favorable impact of this volatility is addressed through the Idaho and Oregon power cost adjustment mechanisms, which lessenmitigate in large part the potential earnings benefit or detriment of volatile hydrological conditions and their impact on overall power supply costs.earnings. For 2025,2026, Idaho Power expects generation from its hydropower resources to be in the range of 6.55.5 million to 8.57.5 million MWh, compared with 7.27.0 million MWh in 20242025 and average total annual hydropower generation of approximately 7.77.3 million MWh over the last 3020 years.

Removed

•Regulatory and Environmental Compliance Costs; Coal Plant Retirements: Idaho Power is subject to extensive federal and state laws, policies, and regulations, as well as regulatory actions and audits by agencies and quasi-governmental agencies, including the FERC, the North American Electric Reliability Corporation, and the Western Electricity Coordinating Council. Compliance with these requirements directly influences Idaho Power's operating environment and affects Idaho Power's operating costs. Moreover, environmental laws and regulations may increase the cost of constructing new facilities, may increase the cost of operating generation plants, may require that Idaho Power install additional pollution control devices at existing generating plants, may result in penalties for non-compliance, even where inadvertent, or may require that Idaho Power curtail or cease operating certain generation plants. Idaho Power expects to spend significant amounts on environmental compliance and controls for the foreseeable future. Due to economic factors in part associated with the costs of compliance with environmental regulation, Idaho Power accelerated the retirement date of its North Valmy plant, ceasing participation in coal-fired operations at one unit in 2019 and planning to cease its participation in coal-fired operations at the remaining unit by year-end 2025. Idaho Power's jointly-owned coal plant in Boardman, Oregon, ceased operations as planned in October 2020. In 2022, the IPUC approved Idaho Power's request to allow the coal-related assets at the Jim Bridger plant to be fully depreciated and recovered by end-of-year 2030. Idaho Power's 2023 IRP identified a preferred resource portfolio and action plan that included the conversion from coal to natural gas of two units at the Jim Bridger plant in 2024, the two units at the North Valmy plant in 2026, and the remaining two units at the Jim Bridger plant in 2030. Units 1 and 2 at the Jim Bridger plant were successfully converted to natural gas in the second quarter of 2024. In July 2024, Idaho Power executed an agreement with its co-owner to facilitate the planned conversion of the two units at the North Valmy plant from coal to natural gas by mid-2026.

Removed

•Water Management and Relicensing of Hydropower Projects: Because of Idaho Power's reliance on stream flow in the Snake River and its tributaries, Idaho Power participates in numerous proceedings and venues that may affect its water rights, seeking to preserve the long-term availability of its rights for its hydropower projects. Also, Idaho Power is involved in renewing its long-term federal licenses for the HCC, its largest hydropower generation source, and for American Falls, its second largest hydropower generation source. Given the number of parties involved, Idaho Power's relicensing costs have been and are expected to continue to be substantial. As of the date of this report, Idaho Power cannot determine the ultimate terms of, and costs associated with, any resulting long-term licenses for the HCC or American Falls hydroelectric facilities.

Reworded

•Wildfire Mitigation Efforts: In recent years, the western United States has experienced ansevere increasing number of wildfires of unprecedented severity.wildfires. A variety of factors have contributed to this trend including increased wildland-urban interfaces, historical land management practices, climate change, and overall wildland and forest health. Idaho Power is taking a proactive approach to wildfire risk in its service area and transmission corridors. Several years ago, Idaho Power has adopted a WMP that outlines actions Idaho Power is taking or is working to implement in the future to reduce wildfire risk and to strengthen the resiliency of its transmission and distribution system to wildfires.wildfires, and Idaho Power has refined that WMP over time. Idaho Power's approach to achievewildfire these objectivesmitigation includes identifying areas subject to elevated risk; system hardening programs, vegetation management, and field personnel practices to mitigate wildfire risk; incorporating current and forecasted weather and field conditions into operational practices; PSPSpublic safety power shutoff protocols; and evaluating the performance and effectiveness of theits strategies identified in the WMPapproach through metrics and monitoring. Idaho Power has regulatory authorization in both Idaho and Oregon to defer, for potential future amortization, certain actual incremental O&M expenses necessary to implement the WMP. The WMP regulatory deferrals are described in more detail in Note 3 - "Regulatory Matters" to the consolidated financial statements included in this report. In July 2025, the Wildfire Standard of Care Act became effective in Idaho. In October 2025, Idaho Power filed a new WMP with the IPUC in accordance with Idaho's Wildfire Standard of Care Act. As of the date of this report, the IPUC's decision on the filing is pending. See "Other Matters - Idaho's Wildfire Standard of Care Act" for additional details.

Reworded

This section of MD&A takes a closer look at the significant factors that affected IDACORP’s and Idaho Power’s earnings. In this analysis, thefinancial results of operations for 2024 are2025, compared with 2023.2024.

Reworded

(1) "SteamJointly-owned thermal generation" is composed of generation from steam plants that are fueled by only coal or by both coal and natural gas.

Reworded

Total system generation increased 131 percent in 20242025 compared with 2023,2024, due primarily to higher jointly-owned thermal generation, mostly offset by lower natural gas generation and hydropower generation. For more information on the changes in sales volume, see the "Operating Expenses" section below in this MD&A.

Reworded

Retail Revenues: The tables below present Idaho Power’s retail revenues (in thousands of dollars), MWh sales (in thousands of MWh), and number of retail customers for the last two years ended December 31.

Reworded

(2) The IPUC allows Idaho Power to recover a portion of the AFUDC on construction work in progress related to the HCC relicensing process,process in its Idaho jurisdiction, even though the relicensing process is not yet complete and the costs have not been moved to utility plant in service. Effective October 1, 2025, Idaho Power isbegan collecting approximately$38.5 million annually. Prior to October 1, 2025, Idaho Power collected $8.8 million annuallyannually. For more information refer to Note 3 - "Regulatory Matters" to the consolidated financial statements in this report. Amounts collected in the Idaho jurisdiction butare isrecognized deferringas deferred revenue recognition of the amounts collected until the license is issued and the accumulated license costs approved for recovery are placed in service.

Reworded

•Rates: Customer rates, excluding revenues related to power cost adjustment mechanisms and net of FCA mechanism revenues,mechanisms, increased retail revenues by $52.7$49.6 million in 20242025 compared with 2023,2024, due primarily to thean overall increase in Idaho base rates, effective January 1, 2024,2025, ratefrom increasethe foroutcome of the 2024 Idaho Power’sLimited-Issue IdahoRate retail customers under the 2023 Settlement Stipulation.Case. Customer rates also include the collection from customers of amounts related to the power cost adjustment mechanisms, which decreased revenues by $14.2$71.2 million in 20242025 compared with 2023.2024. The adjustments related to the Idaho-jurisdiction PCA in rates do not have a significant effect on operating income as a corresponding amount is recorded in expense in the same period it is collected through rates.

Added

•Usage: Lower usage (on a per customer basis) in most customer classes decreased retail revenues by $20.9 million during 2025 compared with 2024, primarily due to weather variations that caused lower usage per customer. Milder temperatures during the year reduced the demand for both space heating and air conditioning. This decrease was partially offset by an increase in irrigation usage per customer, as lower precipitation during the summer led irrigation customers to run irrigation pumps more frequently.

Added

•FCA Mechanism: A decrease in the deferral of residential and small commercial customer revenues through the FCA mechanism positively affected retail revenues by $6.8 million in 2025 compared with 2024.

Removed

•Usage: Increased usage (on a per customer basis) in most customer classes increased retail revenues by $11.2 million during 2024 compared with 2023. Warmer and drier summer weather during 2024 led to an increase in energy usage per residential customer for cooling purposes and an increase in energy usage per irrigation customer, which was partially offset by a decrease in usage per residential customer due to milder temperatures during January to May and September to December 2024, compared with temperatures during 2023.

Reworded

Wholesale Energy Sales: Wholesale energy sales consist primarily of long-term sales contracts, opportunity sales of surplus system energy, and sales into the western EIM, and do not include derivative transactions. The table below presents Idaho Power’s wholesale energy sales for the last two years ended December 31 (in thousands,thousands of dollars and MWh, except for revenue per MWh amounts).

Reworded

In 2024,2025, wholesale energy revenue increaseddecreased by $10.5$17.9 million, or 1724 percent, compared with 2023,2024, asdue higherprimarily wholesale energy sales volumes were partially offset byto lower wholesale market prices. Wholesale energy prices were lower during 20242025 compared with 20232024 as more moderate winter and springsummer weather resulted in lower natural gas fuel costs in the wholesale markets in the region. The financial impacts of fluctuations in wholesale energy sales are largely mitigated by Idaho Power's Idaho and Oregon power cost adjustment mechanisms, which are described below in "Power Cost Adjustment Mechanisms" in this MD&A.

Reworded

Purchased Power: The table below presents Idaho Power’s purchased power expenses and volumes for the last two years ended December 31 (in thousands,thousands of dollars and MWh, except for per MWh amounts).

Reworded

Purchased power expense decreased $76.4$32.6 million, or 158 percent, in 20242025 compared with 2023.2024. The decrease in purchased power expense in 20242025 is primarily due to lower wholesale energy market prices as milder winter and springsummer weather resulted in lower demand and lower fuel costs (natural gas and coal) in the wholesale markets in the region. Increased system generation led to a decrease in total MWh purchased of 7 percent compared with 2023. For further information on purchased power activities, see Part I, Item 1 – Utility Operations – "Power Supply – Purchased Power."

Reworded

Fuel Expense: The table below presents Idaho Power’s fuel expenses and thermal generation for the last two years ended December 31 (in thousands,thousands of dollars and MWh, except for per MWh amounts).

Reworded

(1) "SteamJointly-owned thermal" is composed of expenses and generation from steam plants that are fueled only by coal or by both coal and natural gas.

Reworded

The majority of the fuel for Idaho Power’s jointly-owned coal-firedthermal plants is purchased through long-term contracts, including coal purchases from BCC, a one-third owned investment of IERCo. The price of coal from BCC is subject to fluctuations in mine operating expenses, geologic conditions, and production levels. BCC supplies the majority of the coal used by the Jim Bridger plant and BCC does not have significant sales to third parties. Natural gas is mainly purchased on the regional wholesale spot market at published index prices. In addition to commodity (variable) costs, both natural gas and coal expenses include costs that are more fixed in nature for items such as capacity charges, transportation, and fuel handling. Period to period variances in fuel expense per MWh are noticeably impacted by these fixed charges when generation output is substantially different between the periods.

Reworded

Fuel expense decreased $16.2$6.0 million, or 62 percent, in 20242025 compared with 2023.2024. In 2024,2025, steamjointly-owned and natural gasthermal generation increased 17 percent to serve load and provide power for wholesale energy sales compared with 2023.2024. The impact of this generation increase on fuel expense was more than offset during 20242025 by lower natural gas market prices compared with 2023.2024.

Reworded

Power Cost Adjustment Mechanisms: Idaho Power's power supply costs (primarily purchased power and fuel expense, less wholesale energy sales) can vary significantly from year to year. Volatility of power supply costs arises from factors such as weather conditions, wholesale market prices, volumes of power purchased and sold in the wholesale markets, Idaho Power's hydropower and thermal generation volumes and fuel costs, generation plant availability, and retail loads. To address the volatility of power supply costs, Idaho Power's power cost adjustment mechanisms in the Idaho and Oregon jurisdictions allow Idaho Power to recover from customers, or refund to customers, most of the fluctuations in power supply costs. In the Idaho jurisdiction, the PCA includes a cost or benefit sharing ratio that allocates the deviations in net power supply expenses between customers (95 percent) and Idaho Power (5 percent), with the exception of PURPA power purchasespurchases, export credit mechanisms, a battery storage lease, and demand response program incentives, which are allocated 100 percent to customers. The Idaho deferral period, or PCA year, runs from April 1 through March 31. Amounts deferred during the PCA year are primarily recovered or refunded during the subsequent June 1 through May 31 period. However, the IPUC directed Idaho Power to spread recovery of the March 31, 2023 PCA deferral balance over a two-year period from June 1, 2023,2023 to May 31, 2025. Because of the power cost adjustment mechanisms, the primary financial impacts of power supply cost variations is that cash is paid out but recovery from customers does not occur until a future period, or cash that is collected is refunded to customers in a future period, resulting in fluctuations in operating cash flows from year to year.

Reworded

The table below presents the components of the Idaho and Oregon power cost adjustment mechanisms for the last two years ended December 31 (in thousands of dollars).

Reworded

The power supply (deferrals) accruals represent the portion of the power supply cost fluctuations (deferred) accrued under the power cost adjustment mechanisms. When actual power supply costs are lower than the amount forecasted in power cost adjustment rates, most of the difference is accrued as an increase to a regulatory liability or decrease to a regulatory asset. When actual power supply costs are higher than the amount forecasted in power cost adjustment rates, most of the difference is deferred as an increase to a regulatory asset or decrease to a regulatory liability. During both2025, 2024purchased andpower 2023,costs led to lower actual power supply costs compared with the forecasted amount, which resulted in an accrual of power supply costs by the mechanism. In 2024, higher purchased power expense and fuel costs led to higher actual power supply costs compared with the forecasted amount, which resulted in the deferral of power supply costs. The amortization of the prior year’s balances represents the offset to the amounts being collected or refunded in the current power cost adjustment year that were deferred or accrued in the prior power cost adjustment year (the true-up component of the power cost adjustment mechanism).

Showing the first 60 of 219 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

What changed in the latest 10-Q

Comparing 10-Q filed 2026-07-30 (period ending 2026-06-30) with 10-Q filed 2026-04-30 (period ending 2026-03-31).

Risk Factors (10-Q Part II, Item 1A)

0new paragraphs
0removed paragraphs
0reworded paragraphs
91 → 91words in section

The section in the latest 10-Q reads in full:

The factors discussed in Part I - Item 1A - "Risk Factors" in the 2025 Annual Report, could materially affect IDACORP’s and Idaho Power's business, financial condition, or future results. In addition to those risk factors and other risks discussed in this report, see "Cautionary Note Regarding Forward-Looking Statements" in this report for additional factors that could have a significant impact on IDACORP's or Idaho Power's operations, results of operations, or financial condition and could cause actual results to differ materially from those anticipated in forward-looking statements.

No wording changes found in this section.

Full comparison: every changed paragraph (0)

Green = added, red = removed. Unchanged paragraphs and tables are not shown. Read the complete text in the original filing.

Management's Discussion & Analysis (MD&A) (10-Q Part I, Item 2)

49new paragraphs
17removed paragraphs
82reworded paragraphs
13,259 → 15,634words in section

New heading “Net Income - Year-To-Date 2026”

New heading “Open Access Transmission Tariff Draft Posting”

New heading “Oregon Sale Regulatory Applications”

New heading “National Environmental Policy Act Matters”

New heading “Clean Air Act Matters”

New heading “Endangered Species Act Matters”

New heading “Resource Conservation and Recovery Act Matters”

New heading “Land Use Matters”

New heading “Snake River Minimum Streamflow at Swan Falls”

Removed heading “Idaho's Wildfire Standard of Care Act”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

New text topics: tariff
“Open Access Transmission Tariff Draft Posting”
see in full comparison
New text
“Resource Conservation and Recovery Act Matters”
see in full comparison
New text
“Snake River Minimum Streamflow at Swan Falls”
see in full comparison
New text
“National Environmental Policy Act Matters”
see in full comparison
Removed text
“Idaho's Wildfire Standard of Care Act”
see in full comparison
New text
“Oregon Sale Regulatory Applications”
see in full comparison
Full comparison: every changed paragraph (148)

Green = added, red = removed. Unchanged paragraphs, 4 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

•Idaho Power continues to experience and forecast positive customer growth in its service area. During the twelve months ended MarchJune 31,30, 2026, Idaho Power's customer count grew by approximately 15,000 customers and the customer growth rate was 2.3 percent.

Reworded

•So far in 2026, Idaho Power achievedhas notabletaken milestonesimportant foractions and several key projects,projects achieved notable milestones, underscoring significant progress towards addressing peakIdaho Power's growing capacity and energy needs in 20272026 and beyond:

Removed

◦In March, the IPUC approved Idaho Power's agreement to purchase the output of an 80 MW solar facility, with a scheduled online date of June 2027.

Removed

◦In March, the IPUC approved Idaho Power's CPCN request for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expected in-service date in 2028.

Reworded

◦In March, Idaho Power filed a CPCN request with the IPUC for a 222 MW natural gas-fueled facility, with an expected in-service date in 20292029, and for a 430 MW natural gas-fueled facility, with an expected in-service date in 2030. As of the date of this report, boththe requestsCPCN arerequest pendingremains IPUCsubject to regulatory approval.

Added

◦Also in March, the IPUC approved Idaho Power's agreement to purchase the output of an 80 MW solar facility, with a scheduled online date of June 2027, and Idaho Power's CPCN request for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expected in-service date in 2028. Construction commenced at the Bennett Mountain power plant in May 2026.

Reworded

◦In April, Idaho Power, jointly with co-owner PacifiCorp, filed a CPCN request for Segment E-8 for the GWW transmission line, whichwith wouldan createexpected upin-service date for the entire segment in 2030 or later. As of the date of this report, the CPCN request remains subject to 2,000regulatory MW of additional transmission capacity and the ability to interconnect new generation resources across Idaho.approval.

Added

◦In June, Idaho Power filed an application with the IPUC for an order approving a 20-year PPA with Bluebird Solar Project LLC, supplying up to 200 MW of output to Idaho Power, along with a 20-year energy storage system tolling agreement for 100 MW of dispatchable energy storage capacity. Both are expected to be in-service by June 2028. As of the date of this report, the application remains subject to regulatory approval.

Added

◦The conversion of unit 2 at the North Valmy power plant from coal to natural gas was completed in June, ending all coal-fired generation at the plant.

Added

◦Also in June, the Hemingway expansion and Boise Bench battery energy storage systems became fully operational, adding 250 MW of energy storage.

Added

◦Construction commenced in June on SWIP-N, a 285-mile high voltage transmission line, with an expected in-service date in 2028.

Added

◦In July, Idaho Power began stringing transmission line wire on B2H and continues to expect an in-service date for B2H in late 2027.

Reworded

The following is a summary of Idaho Power's net income, net income attributable to IDACORP, and IDACORP's earnings per diluted share (in thousands of dollars andor shares, except earnings per share amounts):

Reworded

The table below provides a reconciliation of net income attributable to IDACORP for the three months and six months ended MarchJune 31,30, 2026, from the same periodperiods in 2025 (items are in millions of dollars and are before related income tax impact unless otherwise noted):

Reworded

Net Income - FirstSecond Quarter 2026

Reworded

IDACORP's net income increased $8.4$6.8 million for the firstsecond quarter of 2026 compared with the firstsecond quarter of 2025, due primarily to higher net income at Idaho Power.

Reworded

AThe net increase in retail revenues per MWh, excluding large contract customers, and net of power cost adjustment mechanisms, increased operating income by $18.0$27.5 million in the firstsecond quarter of 2026 compared with the firstsecond quarter of 2025. This benefit was due primarily to an overall increase in Idaho base rates, effective January 1, 2026, from the outcome of the 2025 Settlement Stipulation. For more information on the 2025 Settlement Stipulation, see Note 3 - "Regulatory Matters" to the consolidated financial statements included in the 2025 Annual Report.

Reworded

Customer growthgrowth, excluding large contract customers, and net of associated power supply costs and power cost adjustment mechanisms, increased operating income by $5.0$4.5 million in the firstsecond quarter of 2026 compared with the firstsecond quarter of 2025, as the number of Idaho Power customers grew by approximately 15,000, or 2.3 percent, during the twelve months ended MarchJune 31,30, 2026. Usage per retail customer, excluding large contract customers, and net of associated power supply costs and power cost adjustment mechanisms, decreasedwas operatingrelatively income by $10.7 millionconsistent in the firstsecond quarter of 2026 compared with the firstsecond quarter of 2025. Usage per residential and commercial customers decreased most significantly,2025, as morea moderate2 temperaturespercent in the first quarter of 2026 compared with the first quarter of 2025 led these customers to use less energy for heating purposes. These decreases were partially offset by increasesdecrease in usage per irrigationresidential andcustomer industrialwas customers,mostly asoffset lowerby precipitationan increase in theusage firstper quartercustomer of 2026 compared with the first quarter of 2025 ledfor irrigation customerscustomers. toA use more energy for operating irrigation pumps, and a large load industrial customer increased energy use as it ramped up operation of its facility. An increasedecrease in the deferral of residential and small commercial customer revenues through the FCA mechanism positively affected retail revenues by $19.1$2.7 million.

Added

Retail revenues from large contract customers, net of associated power supply costs and the PCA mechanism, increased operating income by $6.5 million in the second quarter of 2026 compared with the second quarter of 2025. This benefit was primarily due to an increase in usage per large contract customer, the overall increase in Idaho base rates effective January 1, 2026, and the addition of one new large contract effective June 1, 2026.

Reworded

Other O&M expenses in the firstsecond quarter of 2026 were $13.1$11.7 million higher than the firstsecond quarter of 2025. This increase was primarily the result of increased wildfire mitigation program expenses and the amortization of previously deferred costs related to the conversion of generating units at the Jim Bridger plant from coal to natural gas, much of which is recovered in customer rates and reflected in revenues pursuant to the 2025 Settlement Stipulation. The amortization of previously deferred wildfire mitigation program expenses, which are also recovered in customer rates and reflected in revenues for both the Idaho and Oregon jurisdictions, also contributed to the increase from the second quarter of 2025.

Reworded

Depreciation and amortization expense increased $5.7$5.2 million in the firstsecond quarter of 2026 compared with the firstsecond quarter of 2025, due primarily to an increase in plant-in-service. Additionally, the start of operations at a leased battery storage facility in the second quarter of 2025 contributed modestly to the increase through the amortization of a related right-of-use asset.

Reworded

Other changes in operating revenues and expenses, net, increased operating income by $13.6$6.3 million in the firstsecond quarter of 2026 compared with the firstsecond quarter of 2025, due primarily to a decrease in net power supply expenses that were not accrued for future refund in rates through Idaho Power's power cost adjustment mechanisms. Also contributing to the increase in other changes in operating revenues and expenses, net, was a decrease in property tax expense due to property tax legislative changes in Idaho.

Reworded

Non-operating expense, net, increased $4.1$0.5 million in the firstsecond quarter of 2026 compared with the firstsecond quarter of 2025. Higher long-term debt balances led to an increase in interest expense, while lower interest-bearing cash investments led to a decrease in interest income. Interest expense recorded on a new finance lease also contributed to the increase compared with the first quarter of 2025. This increase was partiallymostly offset by an increase in AFUDC in the firstsecond quarter of 2026 compared with the firstsecond quarter of 2025, as the average construction work in progress balance was higher.

Reworded

The increase in income tax expense for the firstsecond quarter of 2026, compared with the firstsecond quarter of 2025, was primarily due to a decrease in additional ADITC amortization under the Idaho regulatory settlement stipulation.stipulation and an increase in pre-tax income. Based on Idaho Power's current expectations of full-year 2026 financial results, Idaho Power recorded $6.3no additional ADITC amortization during the second quarter of 2026, compared with $17.2 million of additional ADITC amortization during the firstsecond quarter of 2026, compared with $19.3 million of additional ADITC amortization during the same period in 2025.

Added

Net Income - Year-To-Date 2026

Added

IDACORP's net income increased $15.2 million for the first six months of 2026 compared with the first six months of 2025, due primarily to higher net income at Idaho Power.

Added

The net increase in retail revenues per MWh, excluding large contract customers, and net of power cost adjustment mechanisms, increased operating income by $44 million in the first six months of 2026 compared with the first six months of 2025. This benefit was due primarily to an overall increase in Idaho base rates, effective January 1, 2026, from the outcome of the 2025 Settlement Stipulation.

Added

Customer growth, excluding large contract customers, and net of associated power supply costs and power cost adjustment mechanisms, increased operating income by $8.2 million in the first six months of 2026 compared with the first six months of 2025. Usage per retail customer, excluding large contract customers, and net of associated power supply costs and power cost adjustment mechanisms, decreased operating income by $12.4 million in the first six months of 2026 compared with the first six months of 2025. Residential usage per customer decreased most significantly, as more moderate temperatures in the first six months of 2026 compared with the first six months of 2025 led residential customers to use less energy for heating and cooling purposes. A decrease in the deferral of residential and small commercial customer revenues through the FCA mechanism positively affected retail revenues by $21.8 million.

Added

Retail revenues from large contract customers, net of associated power supply costs and the PCA mechanism, increased operating income by $8.9 million in the first six months of 2026 compared with the first six months of 2025. This change was primarily due to an increase in usage per large contract customer, the overall increase in Idaho base rates effective January 1, 2026, and the addition of one new large contract effective June 1, 2026.

Added

Other O&M expenses in the first six months of 2026 were $24.8 million higher than the first six months of 2025. This increase was primarily the result of previously deferred costs related to the conversion of generating units at the Jim Bridger plant from coal to natural gas, much of which is recovered in customer rates and reflected in revenues pursuant to the 2025 Settlement Stipulation. The amortization of previously deferred wildfire mitigation program expenses, which are also recovered in customer rates and reflected in revenues for both the Idaho and Oregon jurisdictions, also contributed to the increase from the first six months of 2025.

Added

Depreciation and amortization expense increased $10.9 million for the first half of 2026 compared with the first half of 2025, due primarily to an increase in plant-in-service.

Added

Other changes in operating revenues and expenses, net, increased operating income by $22.0 million in the first six months of 2026 compared with the first six months of 2025, due primarily to a decrease in net power supply expenses that were not accrued for future refund in rates through Idaho Power's power cost adjustment mechanisms. Also contributing to the increase in other changes in operating revenues and expenses, net, was a decrease in property tax expense due to property tax legislative changes in Idaho.

Added

Non-operating expense, net, increased $4.6 million in the first six months of 2026 compared with the first six months of 2025. Higher long-term debt balances led to an increase in interest expense. This increase was partially offset by an increase in AFUDC in the first six months of 2026 compared with the first six months of 2025, as the average construction work in progress balance was higher. In addition, interest income decreased due to lower cash and cash equivalent balances in the first six months of 2026 compared with the first six months of 2025.

Added

The increase in income tax expense was principally the result of a decrease in additional ADITC amortization and higher pre-tax income. Based on Idaho Power's current expectations of full-year 2026 financial results, Idaho Power recorded $6.3 million of additional ADITC amortization under its Idaho regulatory settlement stipulation during the first six months of 2026, compared with $36.5 million of additional ADITC amortization during the same period in 2025.

Reworded

•Rate Base Growth and Infrastructure Investment: The rates established by the IPUC, OPUC, and FERC are determined with the intent to provide an opportunity for Idaho Power to recover authorized operating expenses and depreciation and earn a reasonable return on “rate base.” Rate base is generally determined by reference to the original cost (net of accumulated depreciation) of utility plant in service and certain other assets, subject to various adjustments for deferred income taxes and other items. Over time, rate base is increased by additions to utility plant in service and reduced by depreciation of utility plant and write-offs as authorized by the IPUC and OPUC. Idaho Power is pursuing significant enhancements to its utility infrastructure in an effort to maintain system reliability, ensure an adequate supply of electricity, and provide service to new customers, including major ongoing transmission projects such as the B2H, GWW, and SWIP-N projects. To help meet future peakgrowing capacity and energy needs, Idaho Power is planning to construct three new natural gas-fired generating facilities with planned generation capacities of 167 MW, 222 MW, and 430 MW, and expected in-service dates in 2028, 2029, and 2030, respectively. Idaho Power also has RFPs outstanding for resources beyond those years. Idaho Power's existing hydropower and thermal generation facilities also require continuing upgrades and equipment replacement, and the company continues a significant relicensing effort for the HCC, its largest hydropower generation resource. Idaho Power intends to pursue timely inclusion of completed capital projects into rate base as part of a future general rate case or other appropriate regulatory proceeding, but the company incurs the cash requirements of constructing and the costs of financing those resources before they are in rates and customer revenues.

Reworded

•Economic Conditions and Loads: Economic conditions impact consumer demand for energy, revenues, collectability of accounts, the volume of wholesale energy sales, and the need to construct and improve infrastructure, purchase power, and implement programs to meet customer load demands. In recent years, Idaho Power has seen significant growth in the number of customers in its service area. Over the twelve months ended MarchJune 31,30, 2026, Idaho Power's customer count grew by 2.3 percent. While recessionary or volatile economic conditions could slow the rate of customer growth, Idaho Power expects its number of customers and, to a greater extent its load due to anticipated commercial and industrial customer growth, to increase in the foreseeable future. This was visible during the firstsecond quarter of 2026, with an increase in industrial loads and revenues over the prior year's firstsecond quarter driven by the ramp-up in electric service and in revenues by a newtwo large load customer.customers. Idaho Power expects thisthese customer,customers, together with other large-loadlarge load industrial customers, to ramp up operations further during the remainder of 2026 and for the next several years. Idaho Power is in the process of discussing and negotiating terms, conditions, and pricing of potential service agreements with several additional large load customers.

Reworded

Idaho Power's 2025 IRP assumed a forecasted annual growth in retail MWh sales of 8.3 percent and a forecasted annual growth in peak-hour demand of 5.1 percent over the upcoming 5-year period. For more information on the 2025 IRP, refer to "Resource Planning" in Item 1 - "Business" of the 2025 Annual Report. Customer growth has contributed to increases in peak loads experienced in recent years. For example, Idaho Power's highest all-time winter peak demand of 2,719 MW occurred on January 16, 2024, and on July 22, 2024, Idaho Power reached a new all-time summer peak demand of 3,793 MW. Idaho Power believes that existing and sustained growth in customers, load, and peak demand for electricity, the obligation to maintain a safe and reliable system, along with changes in the regional transmission markets that have constrained the availability of transmission outside Idaho Power’s service area to import energy during peak load periods, require Idaho Power to increase its investment in capacity resources, transmission, and distribution infrastructure. For more information on Idaho Power's system investments and resource procurements, see "Liquidity and Capital Resources" in this MD&A. Idaho Power has begun preparation of its 2027 IRP and expects to prepare an updated load forecast during 2026 as the basis for the 2027 IRP, which Idaho Power expects to file in the summer of 2027.

Reworded

•Wildfire Mitigation Efforts: In recent years, the western United States has experienced severe wildfires. A variety of factors have contributed to this trend including increased wildland-urban interfaces, historical land management practices, climate change, and overall wildland and forest conditions. Idaho Power is taking a proactive approach to wildfire risk in its service area and transmission corridors. Several years ago, Idaho Power adopted a WMP that outlines actions Idaho Power is taking or is working to implement to reduce wildfire risk and to strengthen the resiliency of its transmission and distribution system to wildfires, and Idaho Power has refined that WMP over time. Idaho Power's approach to wildfire mitigation includes identifying areas subject to elevated risk; system hardening programs, vegetation management, and field personnel practices to mitigate wildfire risk; incorporating current and forecasted weather and field conditions into operational practices; public safety power shutoff protocols; and evaluating the performance and effectiveness of its approach through metrics and monitoring. Idaho Power has regulatory authorization in both Idaho and Oregon to defer, for potential future amortization, certain actual incremental O&M expenses necessary to implement the WMP. The WMP regulatory deferrals are described in more detail in Note 3 - "Regulatory Matters" to the consolidated financial statements included in the 2025 Annual Report and the condensed consolidated financial statements included in this report. In October 2025, Idaho Power filed a new WMP with the IPUC in accordance with Idaho's new Wildfire Standard of Care Act, and in April 2026, the IPUC issued an order approving the WMP. In December 2025, Idaho Power filed its 2026-2028 WMP with the OPUC, and in June 2026, the OPUC issued an order approving the WMP. See "Other Matters - Idaho Wildfire Standard of Care Act" included in the 2025 Annual Report, for additional details.

Reworded

This section of MD&A takes a closer look at the significant factors that affected IDACORP’s and Idaho Power’s earnings during the three months and six months ended MarchJune 31,30, 2026. In this analysis, the results for the three months and six months ended MarchJune 31,30, 2026, are compared with the same periodperiods in 2025.

Added

Sales Volume and Generation: Total energy sales volumes decreased 8 percent and 14 percent for the second quarter and first six months of 2026, respectively, compared with the same periods in 2025. The decrease in total energy sales volumes was primarily due to lower wholesale energy sales and lower energy sales bundled with renewable energy credits, offset partially by the increase in retail sales volumes. Retail sales volumes increased 3 percent for the second quarter of 2026 compared with the second quarter in 2025, primarily due to customer growth as the number of Idaho Power's customers grew by 2.3 percent over the prior twelve months. Retail sales volumes were relatively consistent in the first six months of 2026, compared with the same period in 2025, as the customer growth was mostly offset by lower usage per customer from more moderate weather in the first few months of 2026. For more information on the changes in sales volumes, see the "Operating Revenues" section below in this MD&A.

Removed

Sales Volume and Generation: Retail sales volumes decreased 3 percent in the first quarter of 2026 compared with the same period in 2025, primarily due to more moderate temperatures, which reduced the amount of energy per customer used for heating. The decrease in usage per customer was partially offset by customer growth as the number of Idaho Power's customers grew by 2.3 percent over the prior twelve months. For more information on the changes in sales volume, see the "Operating Revenues" section below in this MD&A.

Reworded

Total system generation decreased 2320 percent for the firstsecond quarter of 20262026, compared with the firstsecond quarter of 2025, due primarily to lower hydropower generation and natural gas generation, partially offset by an increase in jointly-owned thermal generation. Total system generation decreased 21 percent in the first six months of 2026 compared with the same period in 2025, due to lower hydropower generation, jointly-owned thermal generation, and natural gas generation. For more information on the changes in generation, see the "Operating Expenses" section below in this MD&A.

Reworded

Retail revenues increased $6.5$33.1 million and $39.6 million during the second quarter and first quartersix months of 2026, respectively, compared with the same periodperiods in 2025. The factors affecting retail revenues during the periods are discussed below.

Reworded

•Rates: Customer rates, excluding revenues related to large contract customers, and power cost adjustment mechanisms, increased retail revenues by $18.0$27.5 million and $44.0 million, respectively, for the three months and six months ended MarchJune 31,30, 2026, compared with the same periodperiods in 2025,2025. This was due primarily to an overall increase in Idaho base rates, effective January 1, 2026, from the outcome of the 2025 Settlement Stipulation. Customer rates also include the collection from customers of amounts related to the power cost adjustment mechanisms, which decreased revenues by $20.6$13.1 million and $30.9 million in the firstsecond quarter and first six months of 20262026, respectively, compared with the same periodperiods of 2025. The amount collected from customers in rates under the power cost adjustment mechanisms has relatively little effect on operating income as a corresponding amount is recorded as expense in the same period it is collected through rates.

Reworded

•Customers: Customer growth of 2.3 percent during the twelve months ended MarchJune 31,30, 2026, increased retail revenuesrevenues, excluding large contract customers, by $7.5$6.3 million and $11.5 million in the firstsecond quarter and first six months of 20262026, respectively, compared with the same periodperiods of 2025.

Reworded

•Usage: Lower usageUsage (on a per customer basis), excluding large contract customers, was relatively consistent in somethe second quarter of 2026, compared with the second quarter of 2025, as a 2 percent decrease in usage per residential customer classes,was offset by an increase in usage per customer for irrigation customers and changes in customer mix. Lower usage per customer decreased retail revenues by $17.5$18.6 million in the first quartersix months of 20262026, compared with the same period of 2025, primarily due to weather variations. Usage per residential and commercial customers decreased most significantly, as more moderate temperatures in the first quarterhalf of 2026 compared with the first quarterhalf of 2025 led these customers to use less energy for heating and cooling purposes. These decreases were partially offset by increases in usage per irrigation and industrial customers, as lowerdistribution precipitationof rainfall in theMay firstand quarterJune of 2026 compared with the firstsame quartermonths of 2025 led irrigation customers to use more energy for operating irrigation pumps, and a large load industrial customer increased energy use as it ramped up operation of its facility.pumps.

Reworded

•FCA Mechanism: A decrease in the deferral of residential and small commercial customer revenues through the FCA mechanism positively affected retail revenues by $19.1$2.7 million.million and $21.8 million in the second quarter and first six months of 2026, respectively, compared with the same periods of 2025.

Added

•Large Contract Customers: Retail revenues from large contract customers increased $9.7 million and $11.8 million during the second quarter and first six months of 2026, respectively, compared with the same periods of 2025. The increases were primarily due to an increase in usage per large contract customer, the overall increase in Idaho base rates effective January 1, 2026, and the addition of one new large contract effective June 1, 2026.

Reworded

Wholesale Energy Sales: Wholesale energy sales consist primarily of long-term sales contracts, opportunity sales of surplus system energy, and sales into the energy imbalance market in the western United States, and do not include derivative transactions. The table below presents Idaho Power’s wholesale energy sales (in thousands of dollars andor MWh, except for revenue per MWh amounts).

Reworded

In the second quarter and first quartersix months of 2026, wholesale energy revenues decreased $14.7$11.8 million and $26.6 million, respectively, compared with the same periodperiods of 2025, due primarily to a decrease in wholesale energy volumes sold, partially due to milder winter and spring weather resulting in lower demand in the regional energy market. Lower prices in the energy imbalance market led to less trading activity, which also contributed to the decrease in wholesale energy volumes sold. The financial impacts of fluctuations in wholesale energy sales are largely mitigated by Idaho Power's Idaho and Oregon power cost adjustment mechanisms, which are described below in this section of the MD&A under "Power Cost Adjustment Mechanisms."

Reworded

Purchased Power: The table below presents Idaho Power’s purchased power expenses and volumes (in thousands of dollars andor MWh, except for per MWh amounts).

Added

Purchased power expense increased $1.7 million, or 2 percent, in the second quarter of 2026 compared with the second quarter of 2025, due to a 9 percent increase in MWh purchased to meet load, offset partially by lower market prices. Purchased power expense decreased $7.4 million, or 5 percent, in the first six months of 2026, compared with the same period of 2025, due to lower wholesale energy market prices in the region.

Removed

Purchased power expense decreased $9.0 million during the first quarter of 2026 compared with the same period of 2025, primarily due to a 12 percent decrease in MWh purchased.

Reworded

Fuel Expense: The table below presents Idaho Power’s fuel expenses and thermal generation (in thousands of dollars andor MWh, except for per MWh amounts).

Added

Fuel expense decreased $6.5 million, or 19 percent, and $12.2 million, or 12 percent, in the second quarter and first six months of 2026, respectively, compared with the same periods of 2025. The decrease in fuel expense in the second quarter of 2026 compared with the second quarter of 2025 was primarily due to a 10 percent decrease in the total average cost per MWh from all sources and a 19 percent decrease in natural gas generation, partially offset by a 6 percent increase in jointly-owned thermal generation. The decrease in fuel expense in the first six months of 2026 compared with the same period of 2025 was primarily due to a 14 percent decrease in total MWh generated from jointly-owned thermal and natural gas facilities, partially offset by a 2 percent increase in the total average cost per MWh from all sources.

Removed

Fuel expense decreased $5.7 million, or 8 percent, in the first quarter of 2026 compared with the same period of 2025, primarily due to a 37 percent decrease in jointly-owned thermal generation, partially offset by an 11 percent increase in the total average cost per MWh from all sources.

Reworded

Included in fuel expense are losses and gains on settled financial gas hedges entered into in accordance with Idaho Power's energy risk management policy. For the second quarters and first quarterssix months of 2026 and 2025, losses on financial gas hedges of $26.5$1.1 million and $12.2$0.5 million, and $27.6 million and $12.7 million, respectively, increased natural gas fuel expense. Most of these realized hedging losses are passed on to customers through the power cost adjustment mechanisms described below.

Reworded

Power Cost Adjustment Mechanisms: Idaho Power's power supply costs (primarily purchased power and fuel expense, less wholesale energy sales) can vary significantly from year to year. Variability of power supply costs arises from factors such as weather conditions, wholesale market prices, volumes of power purchased and sold in the wholesale markets, Idaho Power's hydropower and thermal generation volumes and fuel costs, generation plant availability, and retail loads. To address the variability of power supply costs, Idaho Power's power cost adjustment mechanisms in the Idaho and Oregon jurisdictions allow Idaho Power to recover from customers, or refund to customers, most of the fluctuations in power supply costs. In the Idaho jurisdiction, the PCA includes a cost or benefit sharing ratio that allocates the deviations in net power supply expenses between customers (95 percent) and Idaho Power (5 percent), with the exception of PURPA power purchases, export credit mechanisms, acapital lease payments associated with battery energy storage lease,systems, and demand response program incentives, which are allocated 100 percent to customers. The Idaho deferral period, or PCA year, runs from April 1 through March 31. Amounts deferred or accrued during the PCA year are primarily recovered or refunded during the subsequent June 1 through May 31 period. Because of the power cost adjustment mechanisms, the primary financial impact of power supply cost variations is that cash is paid out but recovery from customers does not occur until a future period, or cash that is collected is refunded to customers in a future period, resulting in fluctuations in operating cash flows from year to year.

Reworded

The power supply accruals (deferrals) represent the portion of the power supply cost fluctuations accrued (deferred) under the power cost adjustment mechanisms. When actual power supply costs are lower than the amount forecasted in power cost adjustment rates, most of the difference is accrued as an increase to a regulatory liability or decrease to a regulatory asset. When actual power supply costs are higher than the amount forecasted in power cost adjustment rates, most of the difference is deferred as an increase to a regulatory asset or decrease to a regulatory liability. During the second quarter and first quartersix months of 2026, lower purchased power and fuel costs led to lower actual power supply costs compared with the forecasted amount, which resulted in an accrual of power supply costs by the mechanism. The amortization of the prior year’s balances represents the offset to the amounts being collected or refunded in the current power cost adjustment year that were deferred or accrued in the prior PCA year (the balancing adjustment component of the power cost adjustment mechanism).

Added

Other O&M Expenses: Other O&M expenses increased $11.7 million and $24.8 million in the second quarter and first six months of 2026, respectively, compared with the same periods of 2025. This increase was primarily the result of previously deferred costs related to the conversion of generating units at the Jim Bridger plant from coal to natural gas, much of which is recovered in customer rates and reflected in revenues pursuant to the 2025 Settlement Stipulation. The amortization of previously deferred wildfire mitigation program expenses, which are also recovered in customer rates and reflected in revenues for both the Idaho and Oregon jurisdictions, also contributed to the increases from the second quarter and first six months of 2025.

Showing the first 60 of 148 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

IDA insider buying and selling (Form 4)

Since 2026-04-11, insiders reported open-market purchases in 0 Form 4 filings and open-market sales in 2 filings (2 insiders, 2 trade dates, 3,000 shares, about $424.5K). Net open-market shares: -3,000 (purchases minus sales); net value about -$424.5K.Totals add up every open-market (code P and S) line in those filings, using the prices reported in the filings. Awards, option exercises, tax withholding and gifts are listed below but not counted.

Trade dateInsiderTransactionSharesPriceValueOwned afterFiling
2026-06-10Richins Adam J
EVP and COO (IPC)
Open-market sale 1,500$142.03 $213.0K18,550 SEC
2026-06-01Miller Sharon L.
Director
Grant/award 689— —689 SEC
2026-05-29Hanchey James Bo D
VP of Cust Op & CSO (IPC)
Open-market sale 1,500$140.95 $211.4K2,138 SEC

Well-known investors holding IDA (13F)

InvestorQuarterSharesReported value% of their 13FChange vs prior quarter
Two Sigma Investments COM2026-06-301,439,828$217.8M0.16%Added 7%
Citadel Advisors (Ken Griffin) COM2026-06-30900,382$136.2M0.08%Added 455%
Soros Fund Management COM2026-06-30546,085$82.6M1.08%Reduced 5%
AQR Capital Management (Cliff Asness) COM2026-06-30251,905$38.1M0.01%Added 311%
Point72 Asset Management (Steve Cohen) COM2026-06-30162,781$24.6M0.04%Added 83%
Bridgewater Associates COM2026-06-30109,136$16.5M0.07%Added 14%
Gotham Asset Management (Joel Greenblatt) COM2026-06-30102,668$15.5M0.04%Added 7%
D. E. Shaw & Co. COM2026-06-3065,573$9.9M0.01%Added 101%
Millennium Management (Israel Englander) COM2026-06-3053,700$8.1M0.01%Added 114%
First Eagle Investment Management COM2026-06-3041,508$6.3M0.01%No change

13F reports are filed up to 45 days after quarter end and show long U.S. equity positions only; options positions are omitted here.