At a glance

16 / 2risk-factor paragraphs added / removed in latest 10-K
4new risk-factor headings
0Form 4 filings reporting open-market purchases (last 180 days)
1Form 4 filings reporting open-market sales (last 180 days)

Jump to: Annual report (10-K) · Quarterly report (10-Q) · Insider transactions · 13F holders

What changed in the latest 10-K

Comparing 10-K filed 2026-02-26 (period ending 2025-12-31) with 10-K filed 2025-02-28 (period ending 2024-12-31).

Risk Factors (10-K Item 1A)

16new paragraphs
2removed paragraphs
25reworded paragraphs
13,470 → 14,720words in section

New heading “Risks Related to the Cornerstone Acquisition”

New heading “The proposed Cornerstone Acquisition is subject to a number of conditions which, if not satisfied or waived, could delay or impair our ability to complete the transactions on the agreed terms or at all. Failure to consummate the Cornerstone Acquisition as contemplated or at all could adversely affect us and the price of our common stock.”

New heading “If completed, the proposed Cornerstone Acquisition may not achieve its intended results.”

New heading “We expect to incur a significant amount of indebtedness to finance a portion of the Cornerstone Acquisition. However, we are obligated to complete the transaction whether or not we have obtained the necessary funding.”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

Reworded topics: tariff, liquidity, inflation, regulation

Paragraph as it now reads, with added and removed wording marked:

The laws and rules pertaining to U.S. federal, state, and local income taxation are routinely being reviewed and modified by governmental bodies, officials, and regulatory agencies, including the Internal Revenue Service (“IRS”) and the U.S. Treasury Department. It cannot be predicted whether, when, in what form, or with what effective dates tax laws, regulations, and rulings may be enacted, promulgated, or issued, which could result in changes in the estimated values of recorded deferred tax assets and liabilities and future income tax assets and liabilities and an increase in our effective tax rate and tax liability. For example, the Inflation Reduction Act was signed into law in August 2022. Among the Inflation Reduction Act’s provisions are changes to the U.S. corporate income tax system, including a one percent excise tax on certain repurchases of stock (and economically similar transactions) after December 31, 2022. The Inflation Reduction Act also includes amendments to the Internal Revenue Code of 1986, as amended (the “Code”), toto, among other things, create a nuclear production tax credit program. While electricity produced and sold by Susquehanna through December 31, 2032 may qualify for the Nuclear PTC, which is subject to potential adjustments, these provisions are subject to implementation regulations, the terms of which are not yet fully known. Accordingly, we cannot fully predict the impacts that any such tax credits may have on our liquidity or results of operations. Additional guidance expected to be issued from the U.S. Treasury and IRS may impact the credit value recognized, and any elimination of the Nuclear PTC mayprogram adverselywhich, affectif eliminated, could negatively impact our business and financial condition. See Note 2 to the Annual Financial Statements for our accounting policy related to Nuclear PTC and Note 6 to the Annual Financial Statements for Nuclear PTC revenue recognized. Additionally, the imposition of new tariffs by government authorities or the increase of existing tariffs could materially increase the prices we pay for fuel, materials, supplies, equipment, parts, and (or) other critical products that are integral to our operations.business.
see in full comparison
New text topics: tariff, supply chain, interest rate
“Additionally, United States and international laws, rules, and practices pertaining to trade are currently undergoing frequent changes, including the imposition of new or expanded tariffs on international trade by U.S. and foreign governments. Moreover, President Trump has directed various federal agencies to further evaluate key aspects of U.S. trade policy, and discussion is ongoing regarding other potentially significant changes to U.S. and international trade policies, treaties, and tariffs. …”
see in full comparison
Removed text topics: litigation, regulation
“For example, compliance with the recently revised EPA MATS Rule will require either investment in additional control equipment at Colstrip or retirement of the plant by 2027. We and the other Colstrip co-owners have not yet determined whether to install the equipment necessary to comply with the new EPA MATS Rule; meanwhile, we and others are actively challenging the EPA MATS Rule in ongoing litigation as well as advocating for changes administratively. …”
see in full comparison
New text topics: credit rating, interest rate
“We intend to raise approximately $2.55 billion of additional indebtedness to fund the Cornerstone Acquisition, in addition to issuing approximately $900 million in direct stock consideration. …”
see in full comparison
New text topics: fine, interest rate
“If an "ownership change" (as defined in Sections 382 and 383 of the Code) occurs, the amount of attributes that could be used in any one year following such ownership change could be substantially limited. In general, an "ownership change" would occur when there is a greater than 50 percentage point increase in ownership of a company's stock by stockholders, each of which owns (or is deemed to own under Section 382) 5 percent or more of such company's stock. …”
see in full comparison
New text
“The proposed Cornerstone Acquisition is subject to a number of conditions which, if not satisfied or waived, could delay or impair our ability to complete the transactions on the agreed terms or at all. Failure to consummate the Cornerstone Acquisition as contemplated or at all could adversely affect us and the price of our common stock.”
see in full comparison
Full comparison: every changed paragraph (43)

Green = added, red = removed. Unchanged paragraphs, 11 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

The effects of storms, floods, and other climatic events could disrupt our operations and cause us to incur significant costs in preparing for or responding to these effects. These or other meteorological changes could lead to increased operating costs, capital expenses, or power purchase costs. Such climatic events could also affect the availability of a secure and economical fuel and water supplysupplies in some locations, both of which isare essential for the continued operation of our generation facilities.

Reworded

Market competition may adversely affect our ability to operate profitably and generate positive cash flow. We sell our capacity, electricity, and ancillary services into competitive wholesale markets through a combination of capacity auctions, day-ahead and real-time spot markets, and bilateralfutures agreements.contracts. Our business model depends on us successfully operating in a competitive environment and, unlike regulated utilities, we are not assured of any rate of return on capital investments through a regulated rate structure. Competitors in wholesale power markets include other non-utility generators, regulated utilities and their competitive subsidiaries, industrial companies, financial institutions, and other energy marketers. See also “Item 1. Business—Our Operations—Competition.” Some of our competitors may have advantages over us through access to greater resources, newer generation facilities, lower costs, or more experience. Our ability to compete is affected primarily by electricity prices, fuel prices, the relative cost of electric generation, and the reliability and availability of generation assets. These factors can be impacted by generation additions or retirements from the market, changes in natural gas distribution networks that affect the price and availability of fuel utilized for electric generation, changes in storage assets and transmission capacity, and technological advances in power generation and efficiency. Competition may also be impacted by the actions of environmental and other governmental authorities, including but not limited to the establishment of legislation or subsidies favoring one form of generation over another (such as investment tax credits, production tax credits, and other factors); for example, the Inflation Reduction Act contains a number of tax credits and incentives relating to renewable energy projects and clean energy technologies. Any negative impact on our ability to compete could adversely impact our business. See also “—Regulatory, Environmental, and Legal Risks—We could be impacted by changes in, or state interference with, the structure or operation of the markets in which we operate, including ongoing market restructuring in PJM.”

Reworded

Our business is subject to extensive energy, reliability, market, nuclear, environmental, and safety laws, regulations, and requirements, among others. See also “Item 1. Business—Legal, Regulatory, and Environmental Matters.” Some of the key rules and regulations impacting our business include, among others, those set forth by: (i) the FERC, relating to the generation, sale, and transmission of electricity, and its designated Electric Reliability Organization (currently NERC), relating to reliability standards for the bulk power system; (ii) PJM and ISO-NE,PJM, relating to the reliability and performance of generation facilities and operation of the energy and capacity markets; (iii) the NRC, relating to the licensing, operation, and ownership of nuclear facilities; (iv) the EPA, relating to environmental protection and permitting; and (v) various state and local jurisdictions, relating to similar and other matters. We may also from time-to-time become subject to new or revised laws, regulations, or requirements. The costs of compliance with these requirements may be substantial, and any non-compliance or inability to comply could result in the suspension or curtailment of our electricity sales and power delivery; the cessation, suspension, delay, or limitation of our operations; premature unit retirements; and (or) monetary penalties, increased compliance obligations, or other types of sanctions. See also “—Regulatory, Environmental, and Legal Risks.”

Reworded

Our business could be adversely affected by events outside of our control, including armed conflicts, war, terrorist attacks or threats, government shutdowns, pandemics, natural disasters, cyber-based attacks, or other significant events.

Reworded

Instability and unrest, as well as war, other armed conflicts, economic sanctions, acts of terrorism, or threats thereof may lead to economic disruption that could adversely affect our business through high volatility in fuel and other commodity prices, difficulty obtaining products such as nuclear fuel, disruptions in supply chains, disruptions or volatility in financial markets, or other factors. Additionally, during periods of federal government shutdowns, many government agencies cease to operate at full capacity or at all, which could result in the suspension of ongoing application processes, significant delays in regulatory approvals or other project timing, and difficulty in conducting any other business requiring government participation or approval. In addition, we could be adversely affected by an epidemic, an infectious disease outbreak, or other public health events, which could impact our workforce and the availability of other resources, resulting in decreased service levels and increased costs. Furthermore, as a significant portion of our power generation facilities are geographically concentrated in the mid-Atlantic area of the United States, we face increased risk that a natural or man-made disaster in that area could adversely affect a large part of our operations.

Reworded

We are exposed to price variability associated with future sales and (or) purchases of power products, fuel, environmental products, and other commodities in competitive wholesale markets, which contribute to uncertainty in the future performance and cash flows of our business. See also “—Industry and Market Risks—We may be adversely impacted by changes in the market prices, availability, and transmission of electricity, fuel, and other commodities.” We actively manage the market risk inherent in our business through our commercial risk management activities, which utilize a variety of physical and financial instruments to protect cash flow and preserve forward margin. See also “Item 1. Business—Our Strategies—OptimizeContinue to focus on our core generation fleet that provides stable earnings and cash flows through operational excellence, high reliability, capital discipline, and prudent risk management program and hedging.management.” Nonetheless, such activities may not effectively manage or fully eliminate risks as expected due to differing conditions than those assumed or forecasted, including those related to demand, pricing, volatility, market correlations, generation facility availability, unforeseen market disruptions, and weather events. Given the inherent uncertainty in developing future market expectations, actual market conditions could be materially different than our expectations. The financial markets in which we hedge may have insufficient liquidity or excessive counterparty risk, impairing our ability to enter into new transactions. Furthermore, when a commercial contract expires or is terminated, we may not secure replacement on acceptable terms or at all, and it is possible that subsequent commercial contracts may not be available at prices that permit the operation of our generation fleet on a profitable basis. If our commercial risk management activities are unable to predict or manage the market risk inherent in our operations, economic losses or other costs to our business could result.

Reworded

Facility outages could also subject us to market or contractual penalties. Under PJM’s Capacity Performance model, we may be (and have in the past been) subject to substantial monetary penalties for failing to meet the Capacity Performance requirements set forth by PJM in certain emergency events. For example, during Winter Storm Elliott in 2022, certain of our generation facilities failedincurred Capacity Performance penalties for failing to meet PJM’s Capacity Performance requirements and,during asWinter aStorm result,Elliott wein incurred final aggregate net Capacity Performance penalties of $29 million.2022. See also “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Factors Affecting Our Financial Condition and Results of Operations—Capacity Markets—Capacity Performance Event” and “—Regulatory, Environmental, and Legal Risks.” Additionally, under the AWS PPA, Susquehannawe hashave committed to certain delivery quantities over time andwith agreed reliability standards and AWS may be entitled to contractual or other remedies in the event of Susquehanna’sour non-performance.

Reworded

Since 2016, we have retired three economically nonviableuneconomic coal-fired units, while our remaining coal-fired generation assets continue to be impacted by changing environmental regulations and power market economics. Although we recently reached a settlement agreement for the continued RMR operation of our Brandon Shores (a coal asset) and H.A. Wagner (formerly a coal asset, now operating primarily on fuel oil) facilities through May 2029, we do not currently anticipate that those assets willmay not continue to run beyond that date unless PJM continues to require their operation to maintain grid reliability. In addition, although our Brunner Island facility has been converted and can now run on either coal or natural gas, it remains a legacy coal facility with associated remediation obligations. We likewise have remaining liabilities associated with historical coal-fired generation at other legacy sites. We also own minority interests in three additional coal-fired facilities, including the Colstrip facility in Montana, of which we are the operator. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources—Forecasted Uses of Cash—Projected ARO and Accrued Environmental Liability Cash Flows” and Note 129 to the Annual Financial Statements for additional information on environmental remediation obligations. In connection with the closure and remediation of retired generation units, we have spent, and may in the future spend, a significant amount of capital, internal resources, and time to complete the required closure and reclamation.

Reworded

Our ability to attract and retain key employees is important to both our operational and financial performance. In addition, effective succession planning is also important to our long-term success. We cannot guarantee that any member of our leadership or workforce will continue to serve in any capacity for any particular period of time.time Weand we could have difficulty retaining certain key members of management beyond Maytheir 2026,currently whenagreed aemployment significantand portioncompensation arrangements, many of ourwhich outstandingexpire long-termin equity-basedearly incentive2027. compensation is scheduledFailure to vest.timely and effectively ensure the transfer of knowledge and smooth transitions involving senior management and other key personnel could hinder our strategic planning and execution. Furthermore, an aging workforce with significant retirement eligibility, mismatch of skill set, expectation of future needs, uncertainty around the future of our aging assets, or unavailability of short-term contract employees or contractors may lead to difficulty retaining our workforce, operating challenges, and increased costs. Additional challenges we could face include a lack of human resources, losses to our operational knowledge base, and the required time and other resources needed to develop new workers’ skills. In particular, our operations at Susquehanna largely depend on highly specialized personnel whose absence may adversely impact our ability to operate. We are also subject to the risk of organized actions by unionized employees which,which asrepresent ofa Decembersignificant 31, 2024, represented approximately 43%proportion of our workforce. If we are unable to negotiate future collective bargaining agreements on favorable terms, or if our union employees were to engage in strikes, work stoppages, slowdowns, or other forms of labor disruption, we would be responsible for obtaining replacement labor and could experience increased costs, reduced power generation, outages, other operational disruptions, or reputational harm.

Reworded

We could also engage in mergers, business combinations, or similar corporate transactions. In addition to the types of risks discussed above, mergers and similar transactions may subject us to risks associated with: required stockholder approvals and other stockholder legal actions; changes or fluctuations in merger consideration that could affect the value our stockholders receive; changes in management or control of our business; challenges integrating or operating the combined company; or failure to realize the anticipated business opportunities, synergies, growth prospects, or other benefits. Any acquisition, divestiture, merger, or other corporate transaction could occupy a significant amount of our time and may strain our resources, increase our costs, and distract management. Furthermore, the extensive regulation of our business could delay, prevent, limit the scope of, or increase the costs associated with any such transaction. See also “Item 1. Business—Legal, Regulatory, and Environmental Matters” and “—Regulatory, Environmental, and Legal Risks.” Any failure to meet contractual terms, whether for regulatory or other reasons, could result in transaction cancellation, costly disputes or litigation, breakage or other fees, or other costs and liabilities. No assurance can be provided that any such transaction will result in the anticipated benefits to our business or stockholders. See also “—Risks Related to the Cornerstone Acquisition.”

Reworded

We are subject to regulation by federal and state agencies and other bodies that exercise regulatory authority in the various regions where we conduct business, including but not limited to the FERC; the Department of Energy; the NRC; NERC; the Federal Communications Commission; and state public utility commissions. See also “Item 1. Business—Legal, Regulatory, and Environmental Matters—Energy Regulation” and “—Our ownership and operation of a nuclear power facility subjects us to regulations, costs, and liabilities uniquely associated with these types of facilities.”

Reworded

Certain of our subsidiaries sell electricity into the wholesale markets and are subject to rate, financial, and organizational regulation by the FERC. The FERC has authorized us to sell energy, capacity, and ancillary services at wholesale at market-based rates and has granted us various related customary waivers and blanket approvals, including a blanket authorization to issue securities and to assume liabilities. The FERC retains the authority to modify or withdraw our market-based rate authority and impose cost-based rates if it determines that the market is not competitive, we possess market power in one or more markets, we are not charging just and reasonable and not unduly discriminatory rates, or we have violated the FERC’s market behavior rules or engaged in market manipulation. Any reduction by the FERC in the rates that we may receive, revocation of the FERC’s waivers and blanket authorizations, or unfavorable changes to the regulation of our business by federal or state regulators could materially adversely affect our business. Delivery “behind-the-meter” of more than 300 MW of power under the AWS PPA requires that FERC approve an amended ISA between Susquehanna, PPL, and PJM. Without an amendment we will be unable to deliver the full amount of contract volume under the AWS PPA on a behind-the-meter basis, which may require a contract renegotiation to deliver the additional power “in-front-of-the-meter.” See "Item 3. Legal Proceedings” for additional information on the Susquehanna ISA Amendment. In addition, if we were found to have violated the FERC’s market behavior rules or other FERCrequirements requirements,of the FERC, the FERC could impose civil penalties or order us to disgorge associated profits. Our generation assets are also subject to the reliability standards promulgated by the FERC-designated Electric Reliability Organization (currently NERC) and approved by the FERC. If we fail to comply with the mandatory reliability standards, we could be subject to sanctions, including substantial monetary penalties and increased compliance obligations.

Reworded

We do not own or control the transmission facilities required to deliver the wholesale power from our generation facilities to load. The FERC has issued regulations that require wholesale electricity transmission services, even when offered by parties other than RTOs and ISOs, to be offered on an open-access, non-discriminatory basis. Although these regulations are designed to encourage competition in wholesale markets, there can be no assurance that transmission capacity will be available in the amounts we require. We cannot predict the timing of industry changes as a result of these initiatives, the adequacy of transmission facilities, or whether RTOs, ISOs, or other transmission providers will efficiently operate transmission networks and provide related services. Furthermore, regulatory approvals and orders that we have obtained may be subject to challenge and protest from time to time.

Reworded

The wholesale energy markets vary from region to region with distinct rules, practices, and procedures. Changes in these market rules, problems with rule implementation, and compliance or failure of any of these markets could adversely impact our business. The PJM market is undergoing significant restructuring due to projected increases in demand, projected retirements of supply, and recent weather events that have exposed systemic flaws. Ongoing market reforms have caused delays in the PJM Base Residual Auctions, which determine capacity prices in upcoming years, leading to unpredictability around capacity revenues due to lack of reliable pricing and on-schedule BRAs. While PJM has established dates for certain upcoming PJM BRAs based upon FERCthe FERC’s orders establishing rules for such capacity markets, we cannot guarantee those auctions will take place on those dates or at all. In addition, under PJM’s Capacity Performance model, we may be (and have in the past been) subject to substantial monetary penalties for failing to meet the Capacity Performance requirements set forth by PJM in certain emergency events. Continued efforts to address perceived capacity market design issues are ongoing, and we cannot predict the outcome of these market reforms or their impact on future capacity revenues. See Note 129 to the Annual Financial Statements for additional information on the PJM capacity market, systemic risks, BRA delays, and related legal actions.

Reworded

These efforts are resulting in increased regulation of fossil fuel combustion, GHG emissions, and other related activities. Any resulting changes to the legal and regulatory framework governing electric generation could materially impact our business. For example, new air, waste, and water rules finalized by the EPA in 2024 could require us to incur significant costs if they withstand legal challenges and potential rescission or revision by the Trump administration. These costs include ARO revisions, potential asset modifications, including investments in environmental control equipment, premature retirement or reduced operations, and increased public reporting requirements. See “Item 1. Business—Legal, Regulatory, and Environmental Matters—Environmental Regulation” and Note 129 to the Annual Financial Statements for additional information. Furthermore, any new legislation or regulatory programs could also increase the cost of electricity production or make certain units unavailable or restricted, overall reducing the amount of reliable and affordable power available to meet our nation’s growing electricity demand.

Removed

For example, compliance with the recently revised EPA MATS Rule will require either investment in additional control equipment at Colstrip or retirement of the plant by 2027. We and the other Colstrip co-owners have not yet determined whether to install the equipment necessary to comply with the new EPA MATS Rule; meanwhile, we and others are actively challenging the EPA MATS Rule in ongoing litigation as well as advocating for changes administratively. Furthermore, if we and our co-owners elect to install additional control equipment at Colstrip, the recently revised EPA GHG Rule could still force the plant to retire by 2032, before the costs of installing the equipment can be recovered. We operate an aging fossil fuel fleet and many of our facilities require periodic maintenance and repair. If we significantly modify a unit such that regulated pollutants are increased beyond thresholds set by the EPA pursuant to New Source Review guidelines promulgated under the Clean Air Act, we may be required to install the best available control technology or to achieve the lowest achievable emission rates, which would likely result in substantial additional capital expenditures or premature retirement. However, the EPA MATS, GHG, CCR, and ELG Rules are currently subject to ongoing litigation. As a result, future implementation and enforcement of these rules remains uncertain. To the extent that new or amended laws or regulations further restrict emissions from the combustion of coal, natural gas, or oil, such requirements could result in further capital expenditures or premature retirements.

Reworded

In addition, the EPA recently finalized standards under the EPA GHG Rule in 2024 for new and certain existing power plants. These regulations primarily affect baseload units in the national power fleet, including our coal-fired generation facilities that have not set near-term retirement dates (e.g., Colstrip). More stringent limits on carbon dioxide and other GHG emissions and carbon taxes could be implemented or expanded at the state or regional levels. Recently, certain state legislatures have considered bills that could materially affect our ability to operate our coal-fueled generation facilities. Furthermore, other recent EPA rules (e.g., the EPA MATS, CCR,CCR and ELG Rules) could have a significant impact on our business as discussed herein. Each of these rules are currently subject to ongoing legal challenges. In addition, in January 2025, President Trump issued an executive order directing the heads of all federal agencies to identify and begin the processes to suspend, revise, or rescind all agency actions, including existing regulations, that are unduly burdensome on the identification, development, or use of domestic energy resources. Under the Trump Administration, the EPA is currently reconsidering many of the regulations that impact fossil fuel-fired power plants. Consequently, future implementation and enforcement of these rules remains uncertain at this time.

Reworded

While Susquehanna maintains property and liability insurance and is subject to NRC insurance requirements and the Price-Anderson Act scheme, there may be limitations on the amounts and types of insurance commercially available to us or we may have insufficient coverage with respect to any losses. See Note 129 to the Annual Financial Statements for additional information on nuclear insurance. Uninsured losses and other liabilities and expenses resulting from an incident at Susquehanna, to the extent not recovered from insurers or the nuclear industry, could be borne by us. See also “—IndustryCommercial and MarketOperational Risks—Operation of power generation facilities involves significant risks and hazards customary to the power industry, which we cannot assure our insurance will be adequate to cover.” Additionally, an accident or other significant event at a nuclear facility within the United States or abroad, whether owned by us or others, could result in increased regulation and reduced public support for nuclear-fueled energy. If an incident did occur at Susquehanna, any resulting operational loss, damages, and injuries would likely have a material adverse effect on our business.

Reworded

Changes in tax law (including any elimination of the Nuclear PTC),law, the implementation regulations of certain tax provisions, adverse decisions by tax authorities, or thechanges impositionto of(and uncertainty surrounding) U.S. and international tariffs and trade may adversely affect our business.

Reworded

The laws and rules pertaining to U.S. federal, state, and local income taxation are routinely being reviewed and modified by governmental bodies, officials, and regulatory agencies, including the Internal Revenue Service (“IRS”) and the U.S. Treasury Department. It cannot be predicted whether, when, in what form, or with what effective dates tax laws, regulations, and rulings may be enacted, promulgated, or issued, which could result in changes in the estimated values of recorded deferred tax assets and liabilities and future income tax assets and liabilities and an increase in our effective tax rate and tax liability. For example, the Inflation Reduction Act was signed into law in August 2022. Among the Inflation Reduction Act’s provisions are changes to the U.S. corporate income tax system, including a one percent excise tax on certain repurchases of stock (and economically similar transactions) after December 31, 2022. The Inflation Reduction Act also includes amendments to the Internal Revenue Code of 1986, as amended (the “Code”), toto, among other things, create a nuclear production tax credit program. While electricity produced and sold by Susquehanna through December 31, 2032 may qualify for the Nuclear PTC, which is subject to potential adjustments, these provisions are subject to implementation regulations, the terms of which are not yet fully known. Accordingly, we cannot fully predict the impacts that any such tax credits may have on our liquidity or results of operations. Additional guidance expected to be issued from the U.S. Treasury and IRS may impact the credit value recognized, and any elimination of the Nuclear PTC mayprogram adverselywhich, affectif eliminated, could negatively impact our business and financial condition. See Note 2 to the Annual Financial Statements for our accounting policy related to Nuclear PTC and Note 6 to the Annual Financial Statements for Nuclear PTC revenue recognized. Additionally, the imposition of new tariffs by government authorities or the increase of existing tariffs could materially increase the prices we pay for fuel, materials, supplies, equipment, parts, and (or) other critical products that are integral to our operations.business.

Added

Additionally, United States and international laws, rules, and practices pertaining to trade are currently undergoing frequent changes, including the imposition of new or expanded tariffs on international trade by U.S. and foreign governments. Moreover, President Trump has directed various federal agencies to further evaluate key aspects of U.S. trade policy, and discussion is ongoing regarding other potentially significant changes to U.S. and international trade policies, treaties, and tariffs. Accordingly, there continues to exist significant uncertainty about the future relationship between the U.S. and international trade partners. We cannot predict the timing or scope of any potential changes to, or the volatility of governmental decisions around, tariffs or other trade policies. Any new or increased trade tariffs, restrictions, or controls, as well as any resulting delays or disruptions in global supply chains or shipping channels, could materially increase the prices we pay for, or negatively impact our ability to obtain, on a timely basis or at all, fuel, materials, supplies, equipment, parts, and (or) other products critical to our operations. Furthermore, any of these developments, or the perception that any of them could occur, may have a material negative impact on the macro-level U.S. and global economy, which could negatively impact our interest rates, stock price, and ability to access capital markets.

Reworded

Our ability to utilize our tax attributes, including net operating loss and interest carryforwards, remaining following Emergence, if any, may be limited.

Added

If an "ownership change" (as defined in Sections 382 and 383 of the Code) occurs, the amount of attributes that could be used in any one year following such ownership change could be substantially limited. In general, an "ownership change" would occur when there is a greater than 50 percentage point increase in ownership of a company's stock by stockholders, each of which owns (or is deemed to own under Section 382) 5 percent or more of such company's stock. If there is an "ownership change" (including by the normal trading activity of greater than 5% stockholders), the utilization of all NOLs existing at that time would be subject to additional annual limitations based upon a formula provided under Section 382 that is based on the fair market value of the company and prevailing interest rates at the time of the ownership change. In addition, any ownership change could result in additional limitations on our ability to use certain tax attributes, including interest and depreciation, existing at the time of any such ownership change and have an impact on our tax liabilities.

Removed

As of December 31, 2024, we had $0.8 billion of U.S. federal net operating loss carryforwards and $1.4 billion of disallowed business interest expense carryforwards under Section 163(j) of the Code and certain other tax attributes (including significant tax basis in assets). Because the consummation of the Plan of Reorganization resulted in an ownership change for purposes of Sections 382 and 383 of the Code, our ability to utilize any remaining tax attributes after reduction and disallowed business interest expense carryforwards is subject to limitation under Sections 382 and 383 of the Code. As a result, certain of our tax attributes have been substantially reduced, eliminated, or otherwise restricted.

Reworded

Furthermore, the agreements governing TES’s indebtedness restrict the ability of TES and the Subsidiary Guarantors to pay dividends or distributions or otherwise transfer assets to TEC, subject to certain exceptions. Notable exceptions include the ability to pay dividends or distributions: (1) in an amount not to exceed the greater of $420 million and 40% of TES’s consolidated adjusted EBITDA, (2) in an unlimited amount so long as TES’s pro forma consolidated total net leverage ratio is less than or equal to 2.5 to 1.0, and (3) in an amount not to exceed the sum of: (a) the greater of $525 million and 50% of TES’s consolidated adjusted EBITDA, (b) TES’s consolidated adjusted EBITDA minus 140% of TES’s consolidated interest expense, in each case, for the period beginningfrom June 1, 2023 through the most recent fiscal quarter (subject to compliance with either (x) a pro forma consolidated total net leverage ratio of less than or equal to 3.75 to 1.0 or (y) a fixed charge coverage ratio greater than or equal to 2.0 to 1.0), (c) equity contributions to TES, and (d) other customary “builder basket” components. See also “—The amount and terms of our indebtedness could adversely affect our financial condition and impair our ability to operate our business.”

Reworded

Sales of a substantial number of shares of our common stock in the public market could occur at any time. If at any time there are more shares of our common stock offered for sale than buyers are willing to purchase, then the market price of our common stock may decline, which could both affect our stockholders and also impair our ability to obtain capital (especially equity capital). Substantial sales of our common stock in the public market, or merely the market perception that large stockholders intend to sell shares (particularly with respect to our affiliates, directors, executive officers, or other insiders), could depress the market price or trading volume of our common stock. We currently expect a significant number of shares of our common stock to be issued and (or) become unrestricted in May 2025 and May 2026 upon the vesting and (or) release from lock-up of shares pursuant to certain existing awards under equity compensation plans, and those shares will become unrestricted in May 2026.plans. We may also issue additional shares under future grants of equity compensation awards, to raise capital, or in connection with future potential corporate alliances or acquisitions. For example, we expect to issue, and will be required to register, a substantial amount of common stock in connection with the proposed Cornerstone Acquisition. See “Item 1. Business—Recent Developments—Cornerstone Acquisition” for additional information.

Reworded

The threefour largest TEC stockholders collectively own approximately 30%33% of our outstanding shares of common stock. Large holders such as these may be able to significantly affect matters requiring approval by our stockholders, including but not limited to the election of directors and the approval of mergers or other business combination transactions. Furthermore, we are a Delaware corporation and the anti-takeover provisions of the Delaware General Corporation Law may discourage, delay, or prevent a change in control by prohibiting us from engaging in a business combination with an interested stockholder for a period of three years after the person becomes an interested stockholder, even if a change in control would be beneficial to our existing stockholders.

Reworded

As aan newlyindependent, publicpublicly traded company, we are or will be required to comply with additional laws, regulations, and requirements, including but not limited to applicable SEC rules and regulations, certain provisions of the Sarbanes-Oxley Act of 2002 (the “Sarbanes-Oxley Act”), including maintaining internal control over financial reporting and reporting any material weaknesses in our control, and Nasdaq rules and requirements. These requirements cover a wide variety of topics including many aspects of disclosure, financial reporting, internal controls, and corporate governance, among others. Complying with these laws, regulations, and requirements will occupy a significant amount of our time and may strain our resources, increase our costs, and distract management, all of which may inhibit our ability to comply with these requirements in a timely or cost-effective manner.

Added

Beginning with this Report we are required to furnish a report by management on the effectiveness of our internal control over financial reporting, pursuant to Section 404 of the Sarbanes-Oxley Act. Additionally, our independent registered public accounting firm is also required to express an opinion as to the effectiveness of our internal control over financial reporting.

Reworded

InWe particular,have, and will continue to, design, implement and test the internal controlscontrol and procedures required for public companyover financial reporting under Section 404 of the Sarbanes-Oxley Act are significantly more stringent than those required forto acomply privatewith company.this Fullyobligation implementingbut oursuch internalprocess controlis frameworkcomplex, time-consuming, and testing will require significant resources,costly, and management may not be able to timely and effectively implement the necessary controls and procedures. At any time, we may conclude that our internal controls, once tested, are not operating as designed or do not address all relevant financial reporting risks. InFurthermore, addition,projections onceof requiredany evaluation of effectiveness to attestfuture periods are subject to controlthe effectiveness,risk ourthat independent registered public accounting firmcontrols may issuebecome ainadequate reportbecause concludingof changes in conditions, or that ourthe internaldegree controlsof overcompliance financialwith reportingthe arepolicies notor effective.procedures may deteriorate. If we identify material weaknesses in the future or otherwise fail to implement or maintain effective internal controls over financial reporting, we may not be able to accurately or timely comply with our financial reporting obligations, which may subject us to adverse regulatory consequences, negatively affect our business, harm investor confidence, and (or) reduce the market price of our common stock.

Added

Risks Related to the Cornerstone Acquisition

Added

The proposed Cornerstone Acquisition is subject to a number of conditions which, if not satisfied or waived, could delay or impair our ability to complete the transactions on the agreed terms or at all. Failure to consummate the Cornerstone Acquisition as contemplated or at all could adversely affect us and the price of our common stock.

Added

Completion of the Cornerstone Acquisition is subject to the satisfaction or waiver of a number of conditions, including: (i) receipt of approval from the FERC under Section 203 of the Federal Power Act; (ii) expiration or termination of the applicable waiting period under the HSR Act; (iii) receipt of approval from the Indiana Utility Regulatory Commission, and (iv) other customary closing conditions, including but not limited to the absence of certain “material adverse events.” We cannot guarantee if or when these conditions will be satisfied or that the proposed Cornerstone Acquisition will be completed on the current terms or at all. There can also be no assurance as to the cost, scope, or impact of the actions, restrictions, or other conditions that may be required to obtain regulatory consents and approvals, and the Cornerstone Merger Agreement generally does not permit us to terminate the transactions due to the terms of required regulatory consents or approvals.

Added

It is a condition to closing the Cornerstone Acquisition that no governmental law, ruling, or order is in effect that prohibits its consummation. Although we are not currently aware of any, legal actions relating to the proposed Cornerstone Acquisition could be filed under antitrust, securities, or other laws. There can be no assurance of the outcome of any such actions and, regardless, defending against them could result in delays, additional costs, or diversion of time and resources.

Added

The Cornerstone Merger Agreement provides that either we or the sellers can terminate the applicable agreement if the respective acquisition is not completed by January 15, 2027 (which may be automatically extended to July 15, 2027 in the case of pending antitrust and (or) regulatory approvals). If the Cornerstone Acquisition is not consummated, or is consummated on different terms or timing than currently contemplated, we could be subject to a variety of risks, including but not limited to: (i) being required to pay the sellers a termination fee; (ii) incurrence of other significant transaction costs; (iii) inability to realize the anticipated benefits of the proposed acquisition; (iv) a decline in the market price of our common stock; (v) reputational harm; and (vi) diversion of management and employee attention from day-day-matters or other aspects of our business.

Added

If completed, the proposed Cornerstone Acquisition may not achieve its intended results.

Added

Although we currently anticipate that the Cornerstone Acquisition will be accretive to our earnings and cash flow, that expectation is based on preliminary estimates that are subject to change. We may fail to realize the anticipated benefits of the Cornerstone Acquisition, encounter additional transaction and integration-related costs, or be affected by other factors that impact preliminary estimates, any of which could decrease or delay the expected accretion and (or) contribute to a decrease in the price of our common stock.

Added

We entered into the Cornerstone Merger Agreement with the expectation that the Cornerstone Acquisition would result in various benefits to the Company, including enhanced generation capabilities. Achievement of the anticipated benefits is subject to a number of uncertainties, including our ability to effectively integrate the acquired assets, which may be complex, costly, and time-consuming. Additional challenges could include, among others: (i) achieving the targeted operating or long-term strategic benefits from the acquired assets; (ii) issues or costs in integrating our key systems, keeping industry, vendor, and other business, relationships, and integrating key hedging and other commercial arrangements; (iii) possible inconsistencies between our standards, controls, policies, and procedures and those of the acquired assets and the resources required to implement or improve them to meet public company standards; (iv) potential unknown liabilities and unforeseen expenses, delays, or regulatory conditions, as well as any unexpected write offs or impairment charges; and (v) the performance of the acquired assets and the related costs to operate and maintain them, including any unanticipated capital expenditures or investments.

Added

Furthermore, the Company will not control the acquired assets until completion of the proposed Cornerstone Acquisition, and the acquired assets or their value could be negatively impacted by conditions occurring while the Cornerstone Acquisition is pending. Adverse changes could result from, among other things, physical asset damage, legal or regulatory developments, deteriorating general business, market, industry, or economic conditions, and other factors both within and beyond the control of the Company and the sellers. In addition, there could be potential unknown liabilities or unforeseen expenses not discovered during due diligence and not adequately covered by any representation and warranty insurance we may obtain or otherwise adjusted for in the Cornerstone Merger Agreement. Any such conditions could cause the value of the acquired assets to decline and (or) reduce the benefits of the Cornerstone Acquisition to the Company and its stockholders.

Added

Any of the foregoing risks could result in failure to achieve the anticipated benefits of the Cornerstone Acquisition, and the expectations of our future financial condition and results of operations following the Cornerstone Acquisition might not be met. See also “—Commercial and Operational Risks—Acquisitions, divestitures, mergers, or other corporate transactions may expose us to additional risks.”

Added

We expect to incur a significant amount of indebtedness to finance a portion of the Cornerstone Acquisition. However, we are obligated to complete the transaction whether or not we have obtained the necessary funding.

Added

We intend to raise approximately $2.55 billion of additional indebtedness to fund the Cornerstone Acquisition, in addition to issuing approximately $900 million in direct stock consideration. The amount of our indebtedness following the Cornerstone Acquisition could have adverse consequences for us, including, among others: (i) hindering our ability to adjust to changing market, industry, or economic conditions; (ii) making us more vulnerable to economic or industry downturns (including interest rate increases); (iii) limiting the amount of free cash flow available for future operations, acquisitions, dividends, stock repurchases, or other uses; (iv) reducing our flexibility under the terms of our indebtedness to, among other things, make restricted payments, obtain other financing, operate our business, and (or) take advantage of mergers, acquisitions, or other corporate opportunities; and (v) placing us at a competitive disadvantage compared to less leveraged competitors. Increased indebtedness could also impact our credit ratings, borrowing costs, access to capital markets, and ability to comply with our indebtedness. See also “—Financial and Equity Risks—The amount and terms of our indebtedness could adversely affect our financial condition and impair our ability to operate our business.”

Added

The Cornerstone Merger Agreement does not contain a financing condition, and we would be required to complete the proposed Cornerstone Acquisition even if we do not have the required funds on hand. TEC has issued a parent guaranty in favor of the sellers to guarantee performance of our obligations under the Cornerstone Merger Agreement. We will be required to raise financing for the Cornerstone Acquisition on the timeline required to close the transaction, which could subject us to less favorable timing, costs, and market conditions than we would otherwise choose. If we cannot close on any element of our financing plan, we will need to pursue other financing options and certain existing indebtedness of the acquired assets or their affiliates may remain in place, which could result in less favorable financing terms that could negatively impact our costs, credit ratings, financing and operating flexibility, or realization of the anticipated benefits from the acquisition. See also “—Financial and Equity Risks—We may not have sufficient access to financing for our business.”

Management's Discussion & Analysis (MD&A) (10-K Item 7)

56new paragraphs
104removed paragraphs
33reworded paragraphs
9,066 → 6,665words in section

New heading “PJM 2027/2028 Base Residual Auction”

New heading “Closing of the Freedom and Guernsey Acquisitions”

New heading “Year Ended December 31, 2025 (Successor) compared to Year Ended December 31, 2024 (Successor)”

New heading “Operating activities”

New heading “Investing activities”

New heading “Financing activities”

New heading “Business Combinations”

Removed heading “Financing Transactions”

Removed heading “Power Transactions”

Removed heading “Results for the Year Ended December 31, 2024 (Successor), the Period from May 18 through December 31, 2023 (Successor), the Period from January 1 through May 17, 2023 (Predecessor), and the Year Ended December 31, 2022 (Predecessor)”

Removed heading “Successor Period — Year Ended December 31, 2024”

Removed heading “Successor Period — May 18 through December 31, 2023”

Removed heading “Predecessor Period — January 1 through May 17, 2023”

Removed heading “Successor Period — Year Ended December 31, 2024”

Removed heading “Successor Period — May 18 through December 31, 2023”

Removed heading “Predecessor Period — January 1 through May 17, 2023”

Removed heading “Predecessor Period — Year Ended December 31, 2022”

Removed heading “Recoverability of Long-Lived Assets”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

Removed text topics: impairment, regulation
“PP&E used in operations are assessed for impairment whenever changes in facts and circumstances indicate the carrying amount of the asset group may not be recoverable. Judgment is required to identify these events. …”
see in full comparison
Removed text
“Results for the Year Ended December 31, 2024 (Successor), the Period from May 18 through December 31, 2023 (Successor), the Period from January 1 through May 17, 2023 (Predecessor), and the Year Ended December 31, 2022 (Predecessor)”
see in full comparison
New text
“Year Ended December 31, 2025 (Successor) compared to Year Ended December 31, 2024 (Successor)”
see in full comparison
Removed text
“Successor Period — May 18 through December 31, 2023”
see in full comparison
Removed text
“Predecessor Period — January 1 through May 17, 2023”
see in full comparison
Removed text
“Successor Period — May 18 through December 31, 2023”
see in full comparison
Full comparison: every changed paragraph (193)

Green = added, red = removed. Unchanged paragraphs, 6 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) should be read in conjunction with the Annual Financial Statements and the accompanying notes.notes Theincluded discussion contains forward-looking statements as well as estimates regarding market and industry data, which involve risks, uncertainties, and assumptions. See “Cautionary Note Regarding Forward-Looking Information” and “Market and Industry Data” for additional information. Dollars areelsewhere in millions,this unless otherwise noted.Report.

Added

This MD&A discusses activity for the years ended December 31, 2025 (Successor) and December 31, 2024 (Successor). The operating results for the period from May 18 through December 31, 2023 (Successor) and for the period from January 1 through May 17, 2023 (Predecessor) are not comparable with the operating results for the years presented in this MD&A due to the application of fresh start accounting after our Emergence from Restructuring in May 2023. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our 2024 Annual Report on Form 10-K, filed with the SEC on February 28, 2025, for a discussion of the activities and results of operations for each of these periods.

Added

The discussion contains forward-looking statements as well as estimates regarding market and industry data, which involve risks, uncertainties, and assumptions. See “Cautionary Note Regarding Forward-Looking Information” and “Market and Industry Data” for additional information. Dollars are in millions, unless otherwise noted.

Reworded

CommonCornerstone Stock TransactionsAcquisition

Added

On January 15, 2026, we entered into the Cornerstone Merger Agreement to acquire from affiliates of Energy Capital Partners (“ECP”) the 875 MW Waterford Energy Center and 456 MW Darby Generating Station, both located in Ohio, and the 1,120 MW Lawrenceburg Power Plant located in Indiana, for an aggregate purchase price of $3.45 billion, consisting of $2.55 billion in cash, subject to working capital and other customary adjustments, and 2,400,000 shares of Talen common stock, valued at approximately $900 million at the time of the entry into the Cornerstone Merger Agreement. The Company expects the cash portion of the purchase price to be funded from the proceeds of new indebtedness. The stock consideration will be subject to lock-ups of 90 days on 50% of the stock consideration and 180 days on the remaining stock consideration.

Added

The addition of these assets to Talen’s portfolio will increase generation capacity by approximately 2.5 GW of natural gas generation, substantially expanding Talen’s presence in the western PJM market and adding additional efficient baseload generation assets to its fleet.

Added

In connection with the stock consideration, at the closing of the Cornerstone Acquisition, we intend to enter into the Cornerstone RRA with certain parties thereto substantially in the form attached to this Report as Exhibit 4.16. Pursuant to the terms of the Cornerstone RRA, the Company will agree to use its commercially reasonable efforts to file a registration statement on Form S-3 under the Securities Act of 1933, as amended, to register the TEC common stock issued pursuant to the Cornerstone Merger Agreement with the SEC within three business days (and in any event within five business days) after issuance. See also “Item 1A. Risk Factors—Financial and Equity Risks—A number of factors could adversely affect the market price or trading volume of our common stock, even if our business is doing well, including but not limited to substantial sales of our common stock by existing shareholders, future issuances of equity or debt securities by us, and (or) research or reports published by financial analysts.”

Added

The proposed Cornerstone Acquisition is subject to regulatory approvals and the satisfaction of other customary closing conditions, and is expected to close early in the second half of 2026.

Removed

Share Repurchases. During the year ended December 31, 2024 (Successor), we repurchased and retired a total of 13,227,222 shares, or approximately 22%, of TEC’s outstanding common stock through a combination of the SRP and direct repurchases from affiliates of Rubric Capital Management LP (collectively, “Rubric”). A total of: (i) 7,307,300 shares were purchased from Rubric; (ii) 5,275,862 shares through a tender offer; and (iii) 644,060 shares in the open market. The aggregate purchase price after transaction fees and excise tax was approximately $2.0 billion at a weighted average price of $149.50 per share. As of December 31, 2024 (Successor), the remaining capacity under the SRP is approximately $1.1 billion through 2026.

Reworded

See Note 1817 to the Annual Financial Statements for additional information on the SRP,Cornerstone other share repurchases,Acquisition and other“Item common1A. stockRisk transactions.Factors—Risks Related to the Cornerstone Acquisition” of this Report for a discussion of the associated risks.

Added

The foregoing description of the Cornerstone Merger Agreement and the transaction contemplated thereby is only a summary, does not purport to be complete, and is qualified in its entirety by reference to the full text of the Cornerstone Merger Agreement, a copy of which is incorporated by reference as Exhibit 2.1 to this Report. The Cornerstone Merger Agreement is being filed only to provide investors with information regarding their terms and are not intended to provide any other factual information about the parties thereto. Investors should not rely on the representations, warranties, or covenants in the Cornerstone Merger Agreement, which may be subject to important limitations and qualifications, and which may change after the date of the Cornerstone Merger Agreement, as characterizations of the actual state of facts or condition of the Company, the sellers, or any of their respective subsidiaries or affiliates.

Added

PJM 2027/2028 Base Residual Auction

Added

In December 2025, PJM announced the results of the 2027/2028 PJM BRA. Talen cleared 8,745 MW at a price of $333.44/MWd.

Added

See “—Factors Affecting Our Financial Condition and Results of Operations—Capacity Markets” for additional information.

Added

Closing of the Freedom and Guernsey Acquisitions

Added

In November 2025, the Company consummated the Freedom and Guernsey Acquisitions for an aggregate $3.8 billion which is subject to certain post-closing adjustments for net working capital and other customary items. The Freedom and Guernsey Acquisitions were funded from the proceeds of the Unsecured Notes and the TLB-3. Additionally, TES increased its RCF (including its revolving LC capacity) from $700 million to $900 million and increased its LCF from $900 million to $1.1 billion and extended its maturity from December 2026 to December 2027.

Added

Issuance of Senior Notes. In October 2025, TES issued (i) $1.4 billion in aggregate principal amount of 6.25% Senior Unsecured Notes due 2034, and (ii) $1.3 billion in aggregate principal amount of 6.50% Senior Unsecured Notes due 2036.

Removed

Financing Transactions

Removed

Secured Notes Consent. In January 2025, we received consents from noteholders representing a majority in principal amount of the Secured Notes to adopt certain amendments to the Indenture to, among other things: (i) modify certain provisions, including certain covenants and related definitions, in order to substantially conform to the corresponding amendments to the Credit Agreement obtained in the December 2024 transactions discussed below; and (ii) waive TES’s right to optionally redeem up to 10% of the Secured Notes at a price of 103% of par prior to June 1, 2025.

Removed

December 2024 Financing Activities. In December 2024, we completed several financing transactions that resulted in the: (i) issuance of $380 million in net additional long-term indebtedness through full repayment of the TLC utilizing restricted cash collateralizing the TLC and issuance of the TLB-2 (at an initial rate of SOFR + 2.5%); (ii) issuance of the new $900 million LCF and termination of the TLC LCF and Bilateral LCF, which had the combined effect of increasing our LC capacity by $355 million; and (iii) favorable repricing and covenant improvements on the existing TLB-1 and RCF (repriced to initial rates of SOFR + 2.5% and SOFR + 2.0%, respectively) as well an extension of the RCF maturity. The proceeds of the TLB-2 issuance were used, together with cash on hand, to repurchase shares of our outstanding common stock held by Rubric.

Reworded

See NoteNotes 1310 and 17 to the Annual Financial Statements for additional information on long-termthe debt,financing other credit facilities,transactions and recentissuance financingof activities.the Unsecured Notes, and the Freedom and Guernsey Acquisitions, respectively.

Removed

Power Transactions

Removed

AWS PPA. In connection with the AWS Data Campus Sale in 2024, we and AWS entered into the AWS PPA, pursuant to which we agreed to supply long-term, carbon-free power from Susquehanna to the AWS Data Campus through fixed-price power commitments. Under the AWS PPA, AWS has minimum contractual power commitments that increase in 120 MW increments annually (or earlier, at AWS’s option), with a one-time option to either cap commitments at 480 MW or otherwise purchase, in continuing annual steps, up to 960 MW. Each step up in capacity commitment has a fixed price for an initial 10-year term, after which AWS has the option to renew each step at a price that includes a fixed margin above then-applicable PJM energy and capacity prices. The initial term of the AWS PPA is 18 years, with two 10-year extensions at AWS’s option. Under a separate agreement, we will receive additional revenue from AWS related to the sales of carbon-free energy to the grid. We expect to begin receiving initial revenues from power sales in 2025. See Note 20 to the Annual Financial Statements for additional information on the AWS Data Campus Sale.

Removed

Susquehanna ISA Amendment. In November 2024, FERC issued an order denying the Susquehanna ISA Amendment between PJM, PPL Corporation, and Susquehanna that would permit Susquehanna to decrease the amount of power supply it would otherwise provide to the power grid. Such order does not have an impact on the existing ISA permitting 300 MW of co-located load at Susquehanna to supply power for the first phases of the AWS Data Campus. In December 2024, FERC issued an order stating that it would address our request for rehearing in a future order, which FERC has not yet issued. Due to FERC’s decision not to address the merits of our motion for rehearing, we have filed an appeal in the U.S. Court of Appeals for the Fifth Circuit. Delivery “behind-the-meter” of more than 300 MW of power under the AWS PPA requires that FERC approve an amended ISA between Susquehanna, PPL, and PJM. Without an amendment we will be unable to deliver the full amount of contract volume under the AWS PPA on a behind-the-meter basis, which may require a contract renegotiation to deliver the additional power “in-front-of-the-meter.” See “Item 3. Legal Proceedings” and “Item 1A. Risk Factors—Regulatory, Environmental, and Legal Risks—Our business is subject to extensive energy-related regulation and oversight.” for additional information on the Susquehanna ISA Amendment.

Removed

Brandon Shores and H.A Wagner RMR Arrangements. In 2023, we notified PJM of our intent to deactivate electric generation at both our Brandon Shores and H.A. Wagner facilities on June 1, 2025. However, PJM subsequently notified us that both Brandon Shores and H.A Wagner are needed past their previously planned retirement dates to maintain reliability in PJM. In January 2025, we reached a settlement (which remains subject to FERC approval) with key stakeholders on the terms of an RMR arrangement and filed with FERC the resulting Joint Offers of Settlement regarding both facilities’ RMR Continuing Operations Rates Schedules. If approved, the proposed RMR arrangements will extend the operating life of these plants through May 31, 2029, or until such time as the necessary transmission upgrades are placed into service. See Note 10 to the Annual Financial Statements for additional information on the RMR proceedings and settlement and the related impairment of the Brandon Shores asset group.

Added

During 2025, PJM experienced weather-related volatility, as extreme winter and summer temperatures over certain days contributed to increased load demand and higher settled on-peak power prices during the year. TETCO M-3 natural gas prices settled higher in the period due to the effect of increased electric demand despite elevated storage levels that exceeded the five-year average.

Removed

During 2024, natural gas prices for Texas Eastern M-3 settled below their ten-year average as a result of natural gas storage levels above the five-year average and abundant natural gas supplies. In PJM, periodic below average temperatures during the winter and above average temperatures during the summer contributed to increased load demand that resulted in higher annual settled on-peak power prices compared with the prior year.

Reworded

The weighted average settled on-peak power prices and natural gas prices for the PJM market for the years ended December 31, 2024 (Successor), December 31, 2023 (Successor), and December 31, 2022 (Predecessor) were:

Added

As of December 31, 2025 (Successor), the weighted average forward market prices for the following years were:

Added

(a)Spark spreads are computed based on day-ahead PJM West Hub ATC prices, TETCO M-3 natural gas prices, and a heat rate of 7 MMBtu/MWh.

Removed

(a)Spark spreads are computed based on day-ahead West Hub ATC prices, TETCO M-3 natural gas prices, and a heat rate of 7 MMBtu/MWh.

Removed

As of December 31, 2023 (Successor), the weighted average forward market prices for the following years were:

Removed

(a)Spark spreads are computed based on day-ahead West Hub ATC prices, TETCO M-3 natural gas prices, and a heat rate of 7 MMBtu/MWh.

Reworded

(ba)Represents forward prices for 20242025 as of December 31, 20232024 (Successor). See weighted average settled prices table above for 20242025 realized prices.

Added

(b)Spark spreads are computed based on day-ahead PJM West Hub ATC prices, TETCO M-3 natural gas prices, and a heat rate of 7 MMBtu/MWh.

Reworded

Our generation capacityfacilities isare located primarily in markets with capacity products, which are intended to ensure long-term grid reliability for customers by securing sufficient power supply resources to meet predicted future demand. Capacity prices are affected by supply and demand fundamentals, such as generation facility additions and retirements, capacity imports from and exports to adjacent markets, generation facility retrofit costs, non-performance risk premium penalties, demand response products, RTO/ISOpower demand forecasts, reserve margin targets,targets andand, (in PJM)PJM, adjustments to the PJM Marketmarket Sellerseller Offeroffer Capcap as determined by the PJM Independentindependent Marketmarket Monitor.monitor. Additionally, capacity prices may be affected by regulatory proceedings and (or) interventions by government stakeholders.

Reworded

PJM Capacity Auctions. Under the PJM Reliability Pricing Model, when held on schedule, the PJM Base Residual AuctionBRA is required to be conducted in the month of May three years prior to the start of the applicable PJM Capacity Year in order for PJM to secure commitments from capacity resources. The results of each PJM BRA impact our capacity revenues expected to be earned for the specific PJM Capacity Year. However, PJM has delayed its recent BRAs, which has resulted in less than 3 years between each auction and the start of the relevant PJM Capacity Year. The BRA for the 2025/2026 Capacity Year, which was the most recent auction, was held in July 2024. The BRA for the 2026/2027 Capacity Year is currently delayed until July 2025. The capacity market construct provides generation owners some opportunity for revenue visibility on a multiyear basis and is intended to provide a price signal for new generation to be built in the future. See Note 12 to the Annual Financial Statements for additional information on the PJM capacity market, systemic risks, BRA delays, and related legal actions.

Added

Recently, PJM has delayed its auctions, which has resulted in less than 3 years between each auction and the start of the relevant PJM Capacity Year. The PJM BRA for the 2027/2028 PJM Capacity Year was held in December 2025. The capacity market construct provides generation owners some opportunity for revenue visibility on a multiyear basis and is intended to provide a price signal for new generation to be built in the future. See Note 9 to the Annual Financial Statements for additional information on the PJM capacity market, systemic risks, auction delays, and related legal actions.

Reworded

For the 20252027/20262028 PJM Capacity Year, wethe Company cleared a total of 6,8208,745 MW at a clearing price of $269.92 per MW-day for the MAAC, PPL, and PSEG locational deliverability areas.$333.44/MWd.

Removed

Capacity Performance Event. As a result of Winter Storm Elliott in December 2022, PJM experienced extreme cold weather conditions that resulted in PJM’s declaration of a Capacity Performance event requiring generators to operate at their maximum output capacity. Certain of our generation facilities failed to meet PJM’s Capacity Performance requirements while others met or exceeded their obligations. As a result, we incurred final aggregate net Capacity Performance penalties of $29 million, which were remitted during the period from May 18 through December 31, 2023 (Successor) and the period from January 1 through May 17, 2023 (Predecessor). See Note 12 to the Annual Financial Statements for additional information.

Reworded

The Inflation Reduction Act was signed into law in August 2022. Among the Act’s provisions are amendments to the Internal Revenue Code to create a nuclear production tax credit program. The Nuclear PTC programprogram, established by the Inflation Reduction Act, provides qualified nuclear power generation facilities with a transferable tax credit for electricity produced and sold to an unrelated party during each tax year. The credit provides support beginning when annual gross receipts decline below an equivalent $43.75$44.60/MWh, increases ratably up to $3/MWh when annual gross receipts are equivalent to $25$26/MWh, and is subject to potential adjustments including inflation escalators and a five-times increase in value (up to $15/MWh) for meeting prevailing wage requirements (which we expect to meet). Electricity produced and sold by Susquehanna to third parties from December 31, 2023 through December 31, 2032 will be eligible for the credit. Susquehanna earned Nuclear PTC revenue during the year ended December 31, 2024 (Successor). However, as prevailing market prices exceeded the PTC recognition threshold during the year ended December 31, 2025 (Successor), no such tax credits were earned for the period. See Notes 63 and 74 to the Annual Financial Statements for additional information on Nuclear PTC revenue recognized and the Inflationtax Reduction Act.impact.

Reworded

The demand for and market prices of electricity and natural gas are affected considerably by weather and, as a result, our operating results may fluctuate significantly on a seasonal basis. In general, below-average temperatures in the winter and above-average temperatures in the summer tend to increase electricity demand, energy prices, and revenues. Alternatively, moderate temperatures tend to decrease electricity demand and may adversely affect resulting energy margins, particularly in PJM. In addition, our operating expenses typically fluctuate geographically on a seasonal basis, with peak power generation and expenses during the winter in the Mid-Atlantic. We ordinarily perform planned facility maintenance during milder non-peak demand periods in the spring and fall to ensure reliability during peak periods. The pattern of fluctuations in our operating results varies depending on the type and location of the facilities being serviced, the capacity markets served, the maintenance requirements of our facilities, and the terms of bilateral contracts to purchase or sell electricity. Our largest recurring maintenance project is the annual spring refueling outage at Susquehanna. We servemaintain our fossil generation fleet through a combination of self-service and contracted maintenance activity (including long-term service agreements at certain facilities). Our largest recurring maintenance project is the annual spring refueling outage at Susquehanna. See also “Item 1A. Risk Factors—Industry and Market Risks—Our business is subject to physical, market, economic, and regulatory risks relating to weather conditions and extreme weather events.”

Added

The results of operations presented below are prepared in accordance with GAAP and should be reviewed in conjunction with the Annual Financial Statements and the related notes in this Report. The following discussion provides an analysis of the changes in our results of operations for the year ended December 31, 2025 (Successor), compared to the year ended December 31, 2024 (Successor).

Removed

The results of operations presented below should be reviewed in conjunction with the Annual Financial Statements and the related notes. Our financial results for the year ended December 31, 2024 (Successor) and for the period from May 18 through December 31, 2023 (Successor) are referred to as the “Successor” periods. Our financial results for the period from January 1 through May 17, 2023 (Predecessor) and the year ended December 31, 2022 (Predecessor) are referred to as the “Predecessor” periods. The operating results for the Successor Periods are not comparable with the operating results for the Predecessor Periods due to the application of fresh start accounting after Emergence in May 2023. See Notes 2, 3, and 4 to the Annual Financial Statements for additional information regarding the Restructuring and related accounting. Our results of operations as reported in the Annual Financial Statements are prepared in accordance with GAAP.

Reworded

In the explanations below, “Energy and other revenues” and “Fuel and energy purchases” are evaluated collectively because the price for power is generally determined by the variable operating cost of the next marginal generator dispatched to meet demand. “Energy and other revenues” relate to sales to an RTO or ISO, sales under wholesale bilateral contracts, realized hedging activity,hedges, Bitcoin revenue, and Nuclear PTC revenue. “Fuel and energy purchases” includes costs for fuel to generate electricity and settlements of financial and physical transactions related to fuel and energy purchases.

Reworded

In addition, unrealizedUnrealized gains (losses) on derivative instruments resulting from changes in fair value during the periods are presented separately as revenues within “Operating Revenues” and expenses within “Energy ExpensesExpenses.” in the Annual Financial Statements. We evaluate them collectively because they represent the changes in fair value of our economic hedging activities.

Removed

Results for the Year Ended December 31, 2024 (Successor), the Period from May 18 through December 31, 2023 (Successor), the Period from January 1 through May 17, 2023 (Predecessor), and the Year Ended December 31, 2022 (Predecessor)

Removed

The following table and subsequent sections display the results of operations for the Successor and Predecessor periods:

Removed

Successor Period — Year Ended December 31, 2024

Removed

Net Income (Loss) Attributable to Stockholders totaled $998 million for the year ended December 31, 2024 (Successor). Results were driven by:

Removed

•Capacity Revenues totaled $192 million. This primarily included earned capacity awards based on resource clearing prices received from the PJM BRAs for the 2023/2024 and 2024/2025 PJM Capacity Years.

Removed

•Energy and Other Revenues, net of Fuel and Energy Purchases totaled $1.2 billion. This consisted of: (i) $1.3 billion in third-party wholesale electricity sales and ancillary revenues; (ii) $325 million in other revenue primarily related to Nuclear PTC and Bitcoin revenue; and (iii) $230 million in net realized gains from hedging activities. Such amounts were partially offset by $(659) million in fuel and purchased power costs.

Removed

•Unrealized Gain (Loss) on Derivative Instruments totaled $62 million gain, net. This consisted of: (i) unrealized gains from the reversal of positions previously recognized as mark-to-market liabilities which settled during the period; and (ii) unrealized gains incurred as a result of decreases in forward power prices.

Removed

•Nuclear Fuel Amortization totaled $(123) million. This consisted of the periodic expense of nuclear fuel costs capitalized as PP&E and $33 million of amortization on certain nuclear fuel contracts that were recognized at fair value at Emergence. See Note 4 to the Annual Financial Statements for additional information.

Removed

•Operation, Maintenance and Development totaled $(592) million. This consisted of generation facility operating costs, including employee wages and benefits, the costs of removal, repairs, and maintenance that are not capitalized, contractor costs, and certain materials and supplies.

Removed

•Depreciation, Amortization and Accretion totaled $(298) million. This consisted of depreciation of long-lived PP&E, intangibles, and ARO accretion.

Removed

•Nuclear Decommissioning Trust Funds Gain (Loss), net totaled $178 million. This consisted of realized and unrealized gains and losses on debt and equity securities, dividends, and interest income associated with NDT investments. See Notes 9 and 14 to the Annual Financial Statements for additional information.

Removed

•Interest Expense and Other Finance Charges totaled $(238) million. This primarily consisted of interest expense incurred on the Secured Notes, TLB-1, and TLB-2.

Removed

•Gain (Loss) on Sale of Assets, net totaled $884 million. This primarily consisted of the $564 million gain from the ERCOT Sale that closed in May 2024 and the $324 million gain from the AWS Data Campus Sale that closed in March 2024. See Note 20 to the Annual Financial Statements for additional information.

Removed

•Other Non-Operating Income (Expense), net totaled $61 million. This primarily consisted of interest income on cash deposits.

Showing the first 60 of 193 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

What changed in the latest 10-Q

Comparing 10-Q filed 2026-08-05 (period ending 2026-06-30) with 10-Q filed 2026-05-05 (period ending 2026-03-31).

Risk Factors (10-Q Part II, Item 1A)

0new paragraphs
0removed paragraphs
0reworded paragraphs
21 → 21words in section

The section in the latest 10-Q reads in full:

For information related to the Company’s risk factors, see “Part I, Item 1A. Risk Factors” in our 2025 Annual Report.

No wording changes found in this section.

Full comparison: every changed paragraph (0)

Green = added, red = removed. Unchanged paragraphs and tables are not shown. Read the complete text in the original filing.

Management's Discussion & Analysis (MD&A) (10-Q Part I, Item 2)

44new paragraphs
15removed paragraphs
20reworded paragraphs
3,611 → 4,170words in section

New heading “PJM 2028/2029 Base Residual Auction”

New heading “Closing of the Cornerstone Acquisition”

New heading “Results for the Six Months Ended June 30, 2026 and 2025”

New heading “Six Months Ended June 30, 2026 compared to Six Months Ended June 30, 2025”

New heading “Forecasted Uses of Cash”

Removed heading “Cornerstone Acquisition”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

New text
“Six Months Ended June 30, 2026 compared to Six Months Ended June 30, 2025”
see in full comparison
New text
“Results for the Six Months Ended June 30, 2026 and 2025”
see in full comparison
Removed text topics: covenant
“The foregoing description of the Cornerstone Merger Agreement and the transaction contemplated thereby is only a summary, does not purport to be complete, and is qualified in its entirety by reference to the full text of the Cornerstone Merger Agreement, a copy of which is incorporated by reference as Exhibit 2.1 to our 2025 Annual Report. The Cornerstone Merger Agreement was filed only to provide investors with information regarding their terms and are not intended to provide any other factual information about the parties thereto. …”
see in full comparison
New text
“Closing of the Cornerstone Acquisition”
see in full comparison
New text
“PJM 2028/2029 Base Residual Auction”
see in full comparison
Removed text
“Cornerstone Acquisition”
see in full comparison
Full comparison: every changed paragraph (79)

Green = added, red = removed. Unchanged paragraphs, 1 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Added

PJM 2028/2029 Base Residual Auction

Added

In July 2026, PJM announced the results of the 2028/2029 PJM BRA. Talen cleared 10,180 MWs at a price of $325.00/MWd for the MAAC, PPL, and RTO locational deliverability areas.

Added

See “—Factors Affecting Our Financial Condition and Results of Operations—Capacity Markets” for additional information.

Added

Closing of the Cornerstone Acquisition

Added

In June 2026, the Company consummated the Cornerstone Acquisition for an aggregate $3.5 billion, consisting of $2.6 billion in cash, and 2,399,998 shares of TEC common stock, valued at $927 million. The cash portion of the consideration was funded using a portion of the net proceeds of the issuance and sale of the Unsecured Notes due 2031 and 2033 in April 2026. Additionally, in June 2026, we increased the capacities of our existing RCF and LCF.

Added

In connection with the closing of the Cornerstone Acquisition, and pursuant to the Cornerstone RRA, the Company filed a registration statement on Form S-3 (Reg. No. 333-296901), with the SEC on June 18, 2026, registering the shares issued as equity consideration.

Added

See Notes 10 and 17 to the Interim Financial Statements for additional information on the Cornerstone Acquisition and related financing transactions and “Part I, Item 1A. Risk Factors—Risks Related to the Cornerstone Acquisition” of our 2025 Annual Report for a discussion of the associated risks.

Added

During the second quarter 2026, TES entered into various amendments to the Credit Agreement.

Added

Repricing Transactions. In May 2026, TES repriced the RCF, TLB-1, and TLB-2.

Removed

Unsecured Notes due 2031 and 2033. In April 2026, TES issued in private placement transactions not involving a public offering: (i) $1.5 billion in aggregate principal amount of 6.125% Senior Unsecured Notes due 2031; and (ii) $2.5 billion in aggregate principal amount of 6.375% Senior Unsecured Notes due 2033. We intend to use the net proceeds from the issuance and sale of the Unsecured Notes due 2031 and 2033 to fund: (i) the previously announced Cornerstone Acquisition and (ii) the redemption in full of the Company’s outstanding Secured Notes.

Removed

Secured Notes. In April 2026, using a portion of the net proceeds of the Unsecured Notes due 2031 and 2033, TES redeemed in full, the Company’s outstanding Secured Notes in aggregate principal amount of $1.2 billion.

Reworded

CreditUpsizes Facilityand Transactions.Extensions. In AprilJune 2026, TESin also undertook the following financing transactions that are expected to become effective concurrentlyconnection with the closing of the Cornerstone Acquisition:Acquisition, TES (i) received commitments to increaseupsized its existing RCF (including its revolving LC capacity) from $900 million to $1.35 billion; and (ii) received commitments to upsizeupsized its existing $1.1 billion LCF to $1.5 billion and extendextended theits maturity from December 2027 to December 2029. In May 2026, TES extended the maturity of the TLB-1 from May 2030 to November 2032.

Added

Unsecured Notes due 2031 and 2033. In April 2026, TES issued in private placement transactions not involving a public offering: (i) $1.5 billion in aggregate principal amount of 6.125% Senior Unsecured Notes due 2031; and (ii) $2.5 billion in aggregate principal amount of 6.375% Senior Unsecured Notes due 2033. The net proceeds from the issuance and sale of the Unsecured Notes due 2031 and 2033 were used to (i) fund the Cornerstone Acquisition and (ii) redeem the Company’s outstanding Secured Notes.

Added

Secured Notes. In April 2026, TES redeemed in full the Company’s outstanding Secured Notes in aggregate principal amount of $1.2 billion, using a portion of the net proceeds of the Unsecured Notes due 2031 and 2033.

Reworded

See NotesNote 10 and 17 to the Interim Financial Statements for additional information on the financing transactions and the Cornerstone Acquisition.transactions.

Reworded

During the three months ended MarchJune 31,30, 2026, we repurchased and retired 300,000550,000 shares of TEC’s outstanding common stock under the SRP. The aggregate purchase price, including transaction fees and excise tax,fees, was $101$198 million at a weighted average price of $336.42$359.54 per share. As of MarchJune 31,30, 2026, the remaining capacity under the SRP is $1.9$1.7 billion through 2028. See Note 15 to the Interim Financial Statements for additional information on the SRP.

Added

See Note 15 to the Interim Financial Statements and “Item 2. Unregistered Sales of Equity Securities and Use of Proceeds” of this Report for additional information on the SRP.

Removed

Cornerstone Acquisition

Removed

In January 2026, we entered into the Cornerstone Merger Agreement to acquire from affiliates of Energy Capital Partners (“ECP”) the 875 MW Waterford Energy Center and 456 MW Darby Generating Station, both located in Ohio, and the 1,120 MW Lawrenceburg Power Plant located in Indiana, for an aggregate purchase price of $3.45 billion, consisting of $2.55 billion in cash, subject to working capital and other customary adjustments, and 2,400,000 shares of TEC common stock, valued at approximately $900 million at the time of the entry into the Cornerstone Merger Agreement. The final value of the equity portion of the transaction price will be based on the value of TEC common stock at the close of the transaction. The cash portion of the purchase price will be funded from the proceeds of the Unsecured Notes due 2031 and 2033 which were issued in April 2026. The stock consideration will be subject to lock-ups of 90 days on 50% of the stock consideration and 180 days on the remaining stock consideration.

Removed

The addition of these assets to Talen’s portfolio will increase generation capacity by approximately 2.5 GW of natural gas generation, substantially expanding Talen’s presence in the western PJM market and adding additional efficient baseload generation assets to its fleet.

Removed

At the closing of the Cornerstone Acquisition, the Company intends to enter into the Cornerstone RRA with certain parties, under which it will use commercially reasonable efforts to file a registration statement on Form S-3 with the SEC to register the TEC common stock to be issued pursuant to the Cornerstone Merger Agreement within three business days (and in any event within five business days) after issuance.

Removed

The proposed Cornerstone Acquisition is subject to regulatory approvals and the satisfaction of other customary closing conditions, and is expected to close early in the second half of 2026.

Removed

See Note 17 to the Interim Financial Statements for additional information on the Cornerstone Acquisition and “Item 1A. Risk Factors—Risks Related to the Cornerstone Acquisition” of our 2025 Annual Report for a discussion of the associated risks.

Removed

The foregoing description of the Cornerstone Merger Agreement and the transaction contemplated thereby is only a summary, does not purport to be complete, and is qualified in its entirety by reference to the full text of the Cornerstone Merger Agreement, a copy of which is incorporated by reference as Exhibit 2.1 to our 2025 Annual Report. The Cornerstone Merger Agreement was filed only to provide investors with information regarding their terms and are not intended to provide any other factual information about the parties thereto. Investors should not rely on the representations, warranties, or covenants in the Cornerstone Merger Agreement, which may be subject to important limitations and qualifications, and which may change after the date of the Cornerstone Merger Agreement, as characterizations of the actual state of facts or condition of the Company, the sellers, or any of their respective subsidiaries or affiliates.

Reworded

Earnings in future periods are subject to various uncertainties and risks. See “Cautionary Note Regarding Forward-Looking Information,” “Item 1A. Risk Factors,Factors” of our 2025 Annual Report, as updated by our Q1 2026 Quarterly Report, and Notes 2 and 9 to the Interim Financial Statements for additional information on our risks.

Reworded

During the firstsecond quarter 2026, PJM experiencedmarket conditions were influenced by weather-related volatilityvolatility, as extremeperiods of above-average temperatures overincreased certainelectricity daysdemand and contributed to increased load demand, resulting in higher settled on-peak power prices. Additionally, TETCO M-3M‑3 natural gas prices settled higher inbelow the periodfive-year dueaverage, toreflecting theample effectsupply of increased electric demand resulting from the extreme temperature days in PJM driving natural gas prices to historic highs on those days.conditions. Natural gas storage levelsinventories duringremained above the quarterfive-year wereaverage nearthroughout the 5-year average.quarter.

Reworded

The weighted average settled on-peak power prices and natural gas prices for the PJM market for the yearsthree months ended MarchJune 31,30, were:

Reworded

The weighted average forward market prices for the periods from AprilJuly 1 through December 31 as of MarchJune 31,30, were:

Added

(b)Spark spreads are computed based on day-ahead PJM West Hub ATC prices, TETCO M-2 natural gas prices, and a heat rate of 7 MMBtu/MWh.

Reworded

PJM Capacity Auctions. Under the PJM Reliability Pricing Model, when held on schedule, the PJM BRA is required to be conducted in the month of May three years prior to the start of the applicable PJM Capacity Year in order for PJM to secure commitments from capacity resources. The results of each PJM BRA impact our capacity revenues expected to be earned for the specific PJM Capacity Year. The capacity market construct provides generation owners some opportunity for revenue visibility on a multiyear basis and is intended to provide a price signal for new generation to be built in the future. Recently, PJM has delayed its auctions, which has resulted in less than 3 years between each auction and the start of the relevant PJM Capacity Year.

Added

See Note 9 to the Interim Financial Statements for additional information on the PJM capacity market, systemic risks, auction delays, and related legal actions.

Removed

Recently, PJM has delayed its auctions, which has resulted in less than 3 years between each auction and the start of the relevant PJM Capacity Year. The PJM BRA for the 2027/2028 PJM Capacity Year was held in December 2025. The capacity market construct provides generation owners some opportunity for revenue visibility on a multiyear basis and is intended to provide a price signal for new generation to be built in the future. See Note 9 to the Interim Financial Statements for additional information on the PJM capacity market, systemic risks, auction delays, and related legal actions.

Reworded

ForThe PJM BRA for the 20272028/20282029 PJM Capacity Year,Year was held in July 2026 and the Company cleared 8,74510,180 MW at a price of $333.44$325.00/MWd.

Reworded

The demand for and market prices of electricity and natural gas are affected considerably by weather and, as a result, our operating results may fluctuate significantly on a seasonal basis. In general, below-average temperatures in the winter and above-average temperatures in the summer tend to increase electricity demand, energy prices, and revenues. Alternatively, moderate temperatures tend to decrease electricity demand and may adversely affect resulting energy margins, particularly in PJM. In addition, our operating expenses typically fluctuate geographically on a seasonal basis, with peak power generation and expenses during the winter in the Mid-Atlantic. We ordinarily perform planned facility maintenance during milder non-peak demand periods in the spring and fall to ensure reliability during peak periods. The pattern of fluctuations in our operating results varies depending on the type and location of the facilities being serviced, the capacity markets served, the maintenance requirements of our facilities, and the terms of bilateral contracts to purchase or sell electricity. We maintain our fossil generation fleet through a combination of self-service and contracted maintenance activity (including long-term service agreements at certain facilities). Our largest recurring maintenance project is the annual spring refueling outage at Susquehanna.

Added

We ordinarily perform planned facility maintenance during milder non-peak demand periods in the spring and fall to ensure reliability during peak periods. The pattern of fluctuations in our operating results varies depending on the type and location of the facilities being serviced, the capacity markets served, the maintenance requirements of our facilities, and the terms of bilateral contracts to purchase or sell electricity. We maintain our fossil generation fleet through a combination of self-service and contracted maintenance activity (including long-term service agreements at certain facilities). Our largest recurring maintenance project is the annual spring refueling outage at Susquehanna. Susquehanna commenced its planned refueling outage on Unit 1 on March 23, 2026 and successfully completed the work on May 4, 2026.

Removed

Susquehanna commenced its planned refueling outage on Unit 1 on March 23, 2026. We expect similar incremental maintenance activities that were performed on Unit 2 in 2025 to be performed during this outage on Unit 1, and anticipate the completion of the work in the first half of May 2026.

Reworded

The results of operations presented below are prepared in accordance with GAAP and should be reviewed in conjunction with the Interim Financial Statements and the related Notes in this Report. The following discussion provides an analysis of the changes in our results of operations for the three and six months ended MarchJune 31,30, 2026, compared to the three and six months ended MarchJune 31,30, 2025.

Reworded

Results for the Three Months Ended MarchJune 31,30, 2026 and 2025

Reworded

Three Months Ended MarchJune 31,30, 2026 compared to Three Months Ended MarchJune 31,30, 2025

Reworded

Net Income (Loss) increasedAttributable to Stockholders decreased by $198$(164) million, primarily driven by the factors discussed below.

Reworded

•Operating Revenues, net of Energy Expenses. $345$(9) million favorableunfavorable increase,decrease, primarily due to the following:

Reworded

◦Energy and Otherother Revenues,revenues, net of Fuel and Energyenergy Purchases.purchases. $157$149 million favorable increase. This is primarily related to thean combinedincrease effectsin ofgeneration volumes: (i) $432as milliona increaseresult of the Freedom and Guernsey acquisitions that were completed in marginNovember associated with electric generation2025; and ancillary revenue, primarily due to higher realized prices received(ii) at Susquehanna and our PJMother dispatchable fossil fleet; and (ii) higher generation volumes at Freedom and Guernsey. Such amounts are partially offset by $(271) million decrease in realized hedge results.facilities.

Reworded

◦Capacity Revenues.revenues. $158$149 million favorable increase. This is primarily driven by higher cleared capacity prices,prices partially offset by lower volumes clearedreceived through the 2025/2026 PJM BRA compared to the 2024/2025 PJM BRA.BRA, and higher capacity results due to the Freedom and Guernsey acquisitions that were completed in November 2025.

Added

◦Unrealized gain (loss) on derivative instruments, net. $(303) million unfavorable decrease. This is primarily related to the change in fair value of mark-to-market contracts resulting from higher forward power prices that is partially offset by the change in fair value associated with mark-to-market contracts acquired as a result of the Cornerstone Acquisition.

Added

•General and administrative. $(57) million unfavorable increase. This is primarily associated with: (i) the expense recognized in the current period for stock-based compensation awards granted in the first quarter 2026, and (ii) the effects from a change from equity to liability classification for certain awards in the fourth quarter 2025. Refer to Note 13 to the Interim Financial Statements for additional information on stock-based compensation.

Removed

◦Unrealized Gain (Loss) on Derivative Instruments, net. $28 million favorable increase. This is primarily related to the combined effects of: (i) $142 million increase due to the reversal of positions previously recognized as mark-to-market liabilities which settled during the period, partially offset by $(114) million decrease in net short power positions resulting from higher forward power prices.

Removed

•Interest Expense and Other Finance Charges. $(45) million unfavorable increase. This primarily consisted of: (i) a $(60) million increase in cash interest expense on the TLB-3 and Unsecured Notes due 2034 and 2036, each issued in October 2025 in connection with the Freedom and Guernsey Acquisitions, offset by (ii) a $15 million decrease in non-cash interest expense resulting from changes in unrealized positions on interest rate swaps.

Reworded

•IncomeDepreciation, Taxamortization Benefitand (Expense).accretion. $(7033) million unfavorable increase. This is primarily relateddue to an increase in pre-taxdepreciation incomeassociated forwith the threeFreedom monthsand endedGuernsey Marchacquisitions 31,that 2026.were completed in November 2025.

Added

•Nuclear decommissioning trust funds gain (loss), net. $54 million favorable increase. This is primarily due to unrealized gains on investments in equity securities.

Added

•Interest expense and other finance charges. $(152) million unfavorable increase. This primarily consisted of:

Added

◦$(60) million increase in cash interest expense on the TLB-3 and Unsecured Notes due 2034 and 2036, each issued in the fourth quarter 2025 in connection with the Freedom and Guernsey acquisitions that were completed in November 2025.

Added

◦$(25) million increase in cash interest expense due to the combined effect of financing transactions in April 2026 that included the issuances of the Unsecured Notes due 2031 and 2033 and redemption of the Secured Notes.

Added

◦$(54) million non-recurring make-whole payments associated with the redemption of the Secured Notes.

Added

Refer to Note 10 to the Interim Financial Statements for additional information on long-term debt transactions, including the issuances associated with the Cornerstone Acquisition.

Added

•Income tax benefit (expense). $62 million favorable increase. This is primarily related to a change from pre-tax income for the three months ended June 30, 2025 to pre-tax loss for the three months ended June 30, 2026.

Added

Results for the Six Months Ended June 30, 2026 and 2025

Added

Six Months Ended June 30, 2026 compared to Six Months Ended June 30, 2025

Added

Net Income (Loss) Attributable to Stockholders increased by $34 million, primarily driven by the factors discussed below.

Added

•Operating Revenues, net of Energy Expenses. $336 million favorable increase, primarily due to the following:

Added

◦Energy and other revenues, net of Fuel and energy purchases. $306 million favorable increase. This is primarily related to a favorable increase in margin associated with electric generation as a result of: (i) the Freedom and Guernsey acquisitions that were completed in November 2025; (ii) higher realized market prices; and (iii) higher generation volumes at Susquehanna and our dispatchable fossil generation facilities. Such favorable increase in margin associated with electric generation is partially offset by lower realized hedge results.

Showing the first 60 of 79 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

TLN insider buying and selling (Form 4)

Since 2026-04-11, insiders reported open-market purchases in 0 Form 4 filings and open-market sales in 1 filing (1 insider, 1 trade date, 2,600 shares, about $988.0K). Net open-market shares: -2,600 (purchases minus sales); net value about -$988.0K.Totals add up every open-market (code P and S) line in those filings, using the prices reported in the filings. Awards, option exercises, tax withholding and gifts are listed below but not counted.

Trade dateInsiderTransactionSharesPriceValueOwned afterFiling
2026-07-15Nutt Terry L
President
Shares withheld for tax 3,271$385.80 $1.3M72,865 SEC
2026-07-15Nutt Terry L
President
Option exercise 8,312— —76,136 SEC
2026-06-15Abbas Gizman I
Director
Open-market sale 2,600$380.00 $988.0K2,606 SEC
2026-06-08Mcfarland Mark Allen
Director, Chief Executive Officer
Other 260,335— —117 SEC
2026-06-08Mcfarland Mark Allen
Director, Chief Executive Officer
Other 260,335— —260,335 SEC
2026-05-22Mcfarland Mark Allen
Director, Chief Executive Officer
Option exercise 325,113— —400,093 SEC
2026-05-22Mcfarland Mark Allen
Director, Chief Executive Officer
Option exercise 29,752— —74,980 SEC
2026-05-22Mcfarland Mark Allen
Director, Chief Executive Officer
Shares withheld for tax 139,641$324.21 $45.3M260,452 SEC
2026-05-22Berryman Brad
Chief Operating Officer
Option exercise 90,826— —110,776 SEC
2026-05-22Berryman Brad
Chief Operating Officer
Option exercise 8,312— —19,950 SEC
2026-05-22Berryman Brad
Chief Operating Officer
Shares withheld for tax 43,047$324.21 $14.0M67,729 SEC
2026-05-22Wright Andrew M
Chief Administrative Officer
Shares withheld for tax 37,594$324.21 $12.2M70,200 SEC
2026-05-22Wright Andrew M
Chief Administrative Officer
Option exercise 8,010— —20,271 SEC
2026-05-22Wright Andrew M
Chief Administrative Officer
Option exercise 87,523— —107,794 SEC
2026-05-22Lebsack Dale E Jr.
Chief Asset Dev. Officer
Shares withheld for tax 33,692$324.21 $10.9M62,927 SEC
2026-05-22Lebsack Dale E Jr.
Chief Asset Dev. Officer
Option exercise 7,178— —18,179 SEC
2026-05-22Lebsack Dale E Jr.
Chief Asset Dev. Officer
Option exercise 78,440— —96,619 SEC
2026-05-22Muller Cole
Chief Financial Officer
Option exercise 57,592— —70,307 SEC
2026-05-22Muller Cole
Chief Financial Officer
Option exercise 5,270— —12,715 SEC
2026-05-22Muller Cole
Chief Financial Officer
Shares withheld for tax 27,339$324.21 $8.9M42,968 SEC
2026-05-22Morice Christopher E
Chief Commercial Officer
Option exercise 61,411— —75,552 SEC
2026-05-22Morice Christopher E
Chief Commercial Officer
Option exercise 5,620— —14,141 SEC
2026-05-22Morice Christopher E
Chief Commercial Officer
Shares withheld for tax 26,378$324.21 $8.6M49,174 SEC
2026-05-22Casulli Edward T.
SVP & Chief Nuclear Officer
Shares withheld for tax 2,774$324.21 $899.4K7,205 SEC
2026-05-22Casulli Edward T.
SVP & Chief Nuclear Officer
Option exercise 2,550— —6,153 SEC
2026-05-22Casulli Edward T.
SVP & Chief Nuclear Officer
Option exercise 3,826— —9,979 SEC
2026-05-22Plagens Anthony J
SVP & Chief Accounting Officer
Shares withheld for tax 2,231$324.21 $723.3K6,874 SEC
2026-05-22Plagens Anthony J
SVP & Chief Accounting Officer
Option exercise 2,267— —5,704 SEC
2026-05-22Plagens Anthony J
SVP & Chief Accounting Officer
Option exercise 3,401— —9,105 SEC
2026-05-22Nutt Terry L
President
Option exercise 90,826— —103,502 SEC
2026-05-22Nutt Terry L
President
Shares withheld for tax 35,741$324.21 $11.6M67,761 SEC
2026-05-22Olagues Darren J
Chief Development Officer
Option exercise 7,395— —7,512 SEC
2026-05-22Olagues Darren J
Chief Development Officer
Shares withheld for tax 2,911$324.21 $943.8K4,601 SEC
2026-05-22Schaefer Stephen
Director
Option exercise 4,133— —8,265 SEC
2026-05-22Schaefer Stephen
Director
Option exercise 18,349— —26,614 SEC
2026-05-22Schaefer Stephen
Director
Disposition to issuer 6,789$324.21 $2.2M19,825 SEC
2026-05-22Abbas Gizman I
Director
Option exercise 4,133— —6,736 SEC
2026-05-22Abbas Gizman I
Director
Disposition to issuer 1,530$324.21 $496.0K5,206 SEC
2026-05-22Horton Anthony R
Director
Option exercise 4,133— —9,265 SEC
2026-05-22Hyde Karen T
Director
Disposition to issuer 1,530$324.21 $496.0K5,206 SEC
2026-05-22Hyde Karen T
Director
Option exercise 4,133— —6,736 SEC
2026-05-22Nigro Joseph
Director
Option exercise 4,133— —6,736 SEC
2026-05-22Nigro Joseph
Director
Disposition to issuer 1,530$324.21 $496.0K5,206 SEC
2026-05-22Schwartzstein Christine Benson
Director
Option exercise 4,133— —6,736 SEC

Well-known investors holding TLN (13F)

InvestorQuarterSharesReported value% of their 13FChange vs prior quarter
Lone Pine Capital (Stephen Mandel) COM2026-06-301,817,947$580.3M—Sold out
Millennium Management (Israel Englander) COM2026-06-30781,457$300.3M0.2%Reduced 1%
Yacktman Asset Management COM2026-06-30359,800$138.3M1.71%No change
Oaktree Capital Management (Howard Marks) COMMON STOCK2026-06-30331,117$127.2M2.4%No change
Bridgewater Associates COM2026-06-30121,506$46.7M0.19%Reduced 54%
Gotham Asset Management (Joel Greenblatt) COM2026-06-3085,989$33.0M0.08%Added 53%
AQR Capital Management (Cliff Asness) COM2026-06-3023,559$9.1M0.0%Added 33%
Citadel Advisors (Ken Griffin) COM2026-06-3020,710$8.0M0.0%Reduced 84%
Two Sigma Investments COM2026-06-309,053$3.5M0.0%Reduced 6%
Soros Fund Management COM2026-06-301,833$704.3K0.01%New position
D. E. Shaw & Co. COM2026-06-302,045$652.8K—Sold out
Point72 Asset Management (Steve Cohen) COM2026-06-301,500$576.4K0.0%No change
Polen Capital Management COM2026-06-301,473$566.0K0.0%Added 116%

13F reports are filed up to 45 days after quarter end and show long U.S. equity positions only; options positions are omitted here.