What changed in the latest 10-K
Risk Factors
New heading “Our efforts to pursue deep-sea nodule exploration licenses and a commercial recovery permit under DSHMRA may subject us to conflicting regulatory regimes, uncertain legal interpretations, and operational risks that could adversely affect our business.”
New heading “We are involved in litigation that may adversely affect us.”
Removed heading “Our efforts to explore a regulatory pathway for deep-sea nodule production under the U.S. Deep Seabed Hard Mineral Resources Act may subject us to conflicting regulatory requirements and other operational risks.”
Removed heading “Reduced growth in the adoption of electric vehicles by consumers may change our strategy and our business and operating results may be impacted.”
Removed heading “We are involved in litigation that may adversely affect us and may not be successful in our litigation related to non-performing Private Investment in Public Equity (“PIPE”) investors.”
Removed heading “We are an emerging growth company and a smaller reporting company within the meaning of the Securities Act, and if we take advantage of certain exemptions from disclosure requirements available to “emerging growth companies” or “smaller reporting companies,” this could make our securities less attractive to investors and may make it more difficult to compare our performance with other public companies.”
Largest changes
“On November 8, 2024, a shareholder filed a putative class action against us and certain executives in federal district court for the Central District of California, captioned Lin v. TMC The Metals Company Inc., Gerard Barron, and Craig Shesky. The complaint alleges that all defendants violated Section 10(b) of the Exchange Act and Rule 10b-5 promulgated thereunder, and Messrs. …”see in full comparison
“The environmental permitting process, which includes considerations of the impacts of our activities on the biodiversity of the CCZ, is expected to involve a series of checks and balances with reviews being conducted by the ISA, including technical evaluations by the ISA Secretariat and the LTC. The recommendations of the LTC will then go before the ISA Council (“Council”), a core policy-making body of the ISA, which will then review and, if it deems appropriate, approve the contractor’s application. …”see in full comparison
“On January 16, 2026, American Metal Inc. and American Metal Resources LLC filed a civil claim against TMC The Metals Company Inc. and The Metals Company USA LLC in the Supreme Court of British Columbia, Vancouver Registry, captioned American Metal Inc. and American Metal Resources LLC v. TMC The Metals Company Inc. and The Metals Company USA LLC, No. S260335. …”see in full comparison
“All phases of exploring for and collecting and processing polymetallic nodules are subject to environmental regulation in various jurisdictions and under national as well as international laws and conventions. No seafloor polymetallic nodule deposit has been developed commercially to date, and it is not clear what environmental parameters may need to be measured to satisfy regulatory authorities for an ISA Exploitation Contract to be granted. …”see in full comparison
For example, as previously disclosed, management identified a material weakness in the operating effectiveness of our internal control over the accounting for significant, non-routine transactions that resulted from the inadequate and untimely involvement of stakeholders and technical advisors with an appropriate level of expertise to account for significant, non-routine transactions. Although we believe we havesee in full comparisontaken steps to remediateremediated this material weaknesswhich we believe worked effectively for a recent significant, non-routine transaction, the new internal control needs to be in operationandtested for sufficient instances to be considered effective and, therefore, these changes can only be deemed effective once they have been in place over a longer time period and applied in additional instances. Althoughwe will continue to review the effectiveness of our newly implemented controls and make improvements as warranted, there is no assurance, however, that these control modifications will ultimately have the intendedeffects or that the material weakness will be remediated.effects. In addition,as set forth above,a shareholder filed a putative class action lawsuit against us and certain of our executives following our announcement of this material weakness and the associated restatements to our previously issued financialstatementsstatements.forThisthelawsuitthreehasmonthssinceendedbeenMarch 31, 2023, the six months ended June 30, 2023 and the nine months ended September 30, 2023 contained in its Quarterly Reports on Form 10-Q for the quarter ended March 31, 2023, June 30, 2023 and September 30, 2023, respectively, filed with the SEC.dismissed. We can provide no assurance that additional litigation or disputes will not arise in the future as a result of this or other material weaknesses or restatements. Any such litigation or dispute, whether successful or not, could have a material adverse effect on our business, results of operations and financial condition.
“We are involved in litigation that may adversely affect us and may not be successful in our litigation related to non-performing Private Investment in Public Equity (“PIPE”) investors.”see in full comparison
Full comparison: every changed paragraph (96)
Summary of the Material Risks Associated with Our Business
Both the ISA regulatory regime under UNCLOS and the U.S. regulatory regime under DSHMRA have not yet been used for commercial production of seafloor polymetallic nodules and, to date, no commercial collection (also referred to as “mining,” “exploitation” or “harvesting”) of nodules has occurred on the seafloor in the area of the high seas beyond the limits of national jurisdiction (the “Area”), which includes the CCZ.
DSHMRA Regime
To date, NOAA has not issued a commercial recovery permit, and the legal framework, while established, has not yet been applied to the full lifecycle of a seabed mining project. Despite our applications now under NOAA review, there can be no assurance that such review will lead to NOAA granting TMC USA any exploration licenses or a commercial recovery permit on a timely basis or at all, or on commercially viable terms and conditions, which would materially and negatively impact our business, financial condition, liquidity, results of operations and prospects. In addition, there is no assurance that we will be able to comply with, or obtain a waiver of, the requirement under DSHMRA that minerals be processed in the United States.
In addition, permitting under DSHMRA subjects TMC USA to a complex regulatory system in the United States which we are in the initial stages of analyzing to determine applicability and how compliance will impact our development plans and potential commercial operations. We will need to be in full compliance with U.S. environmental laws, and NOAA may deny a commercial recovery permit if it determines that significant adverse environmental effects cannot be adequately mitigated. The review and approval process will also be subject to a full EIS process under NEPA, as well as public comments and potential legal challenge in U.S. courts by third parties who can show that they are adversely affected or aggrieved by NOAA’s actions. Although the Executive Order 14825 signed by President Trump on April 24, 2025 directs the Commerce Secretary to implement an expedited permitting process under DSHMRA, the timing of license or permit issuance remains uncertain while there are statutory guidelines as to timing, there are no mandatory deadlines under DSHMRA and actual review timelines will depend on the scope and outcome of NOAA’s assessment.
Success under the U.S. regulatory pathway will also require continued policy support from the U.S. executive branch and agencies such as NOAA and the Department of Commerce. Shifts in U.S. political priorities, legal interpretations, or agency leadership could adversely affect our ability to obtain and maintain required approvals or to rely on DSHMRA as a viable permitting pathway.
Although NOAA has determined that our applications for exploration licenses are in full compliance and our consolidated application is in substantial compliance with the applicable requirements under DSHMRA and its implementing regulations and provide us with priority rights in the application areas under DSHMRA, if such priority rights were to be terminated or successfully challenged by a third party, our business prospects and financial condition would be materially adversely affected.
UNCLOS Regime
On March 4, 2023, the United Nations finalized the text of the UN High Seas Treaty. The treaty does not replace or amend UNCLOS, or the authority of the ISA, and must be interpreted consistently with the provisions of the Convention, including the rights granted by the Convention.thereunder.
To date, no commercial collection (also referred to as “mining,” “exploitation” or “harvesting”) of nodules has occurred on the seafloor in the area of the high seas beyond the limits of national jurisdiction (the “Area”), which includes the CCZ. Moreover, despiteDespite the release by the ISA of the Draft Regulations on Exploitation of Mineral Resources (the “Draft Regulations”), finalization of such regulations remains subject to negotiation, approval and adoption by the ISA. Once adopted, these regulations will add to the legal and technical framework for exploitation of the polymetallic nodules in the NORI and TOML contract areas.
Section 1, paragraph 15 of the Annex to the 1994 Agreement Relating to the Implementation of Part XI of UNCLOS (the “1994 Agreement”) allows a member state whose national intends to apply for approval of a plan of work for exploitation to notify the ISA Council of such intention. This notice obliges the ISA Council to complete the adoption of exploitation regulations within two years of the request made by the member state.
On June 25, 2021, Nauru submitted such a notice, with an effective date of July 9, 2021, to the ISA requesting that it complete the adoption of rules, regulations and procedures (“RRPs” or the “Mining Code”) necessary to facilitate the approval of plans of work for exploitation in the Area. As a result of that notice, the ISA was required to adopt the relevant RRPs for exploitation by July 9, 2023. The ISA, however, did not adopt the RRPs for exploitation by the July 9, 2023 deadline. At its July 2023 session, the ISA released a road map for the finalization of the Mining Code, with a view to its adoption during the 30th Session of the ISA in 2025. The road map included three scheduled ISA Council meetings through July 2024 to elaborate on the Mining Code. The Mining Code was not completed at the July 2024 ISA Council meetings and during these meetings, the ISA agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th Session of the ISA in 2025.2025 Thebut once again failed to finalize and adopt the regulations. There is currently no timeline or target agreed to by the ISA Council has scheduled two ISA Council meetings, one in March 2025 andfor the otheradoption of which is expected to occur in July 2025, to progress the Mining Code.regulations. Although we believe the ISA will adopt the Mining Code, there can be no assurances that the Mining Code will be adopted in 2025,2026, or at all, as a result of actions of ISA member States or otherwise. For example, at least 32 of the 171 ISA member States out of the 170 ISA members have expressed reservations about the timing of commercialization of seafloor mineral resources and have called for a ban, moratorium, or precautionary pause on the commercialization of these resources. In addition, although the Draft Regulations and several supporting standards and guidelines are at an advanced stage,exist, there remains uncertainty regarding the final form that these will take, as well as the impact that such regulations, standards and guidelines will have on our ability to meet our objectives.
As the ISA Council did not complete the adoption and elaboration of the Mining Code by the prescribed deadline of July 9, 2023, pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement, if an application for a plan of work for exploitation is now submitted to the ISA, the ISA Council is nonetheless required to consider and provisionally approve such a plan of work based on: (i) the provisions of the UNCLOS; (ii) any rules, regulations and procedures that the ISA Council may have adopted provisionally, (iii) the basis of the norms contained in the UNCLOS and (iv) the terms and principles contained in the 1994 Agreement,Agreement includingand the principle of non-discrimination among contractors.
NORI intends to submit an application to the ISA for an exploitation contract, which will include a plan of work for exploitation for the NORI contract area, expected to be filed on June 27, 2025. If the ISA has not adopted the final Mining Code by the time NORI submits this application, we believe that the ISA will review and provisionally approve the plan of work for exploitation included therein pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement discussed above. The ISA released its road map to finalize the Mining Code at its July 2023 session and at its July 2024 session agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th Session of the ISA in 2025, however, it has also stated that the commercial exploitation of mineral resources in the ISA’s jurisdictional area should not be carried out in the absence of RRPs relating to exploitation. In addition, there can be no assurances that the ISA will come to a consensus as to the interpretation of Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement. Although we believe the ISA will accept and consider an application for a plan of work for exploitation in the absence of the final Mining Code, there is no consensus within the ISA as to the process to be followed for its consideration of such an application, including the involvement of the LTC and whether and how long the ISA could delay its consideration of an application past the proscribed 60-day period. As a result, and to provide clarity on the application review process and timeline, the Republic of Nauru, in consultation with NORI, formally requested that this issue be added to the agenda of the Council’s March 2025 meeting. Nauru’s proposed agenda item was strongly opposed by Chile, and it is unlikely for there to be an agreed upon process until after an application is received. In light of some ISA Member States calling for a ban, moratorium or precautionary pause on the commercialization of seafloor mineral resources, there can be no assurance that the ISA will provisionally approve our plan of work for exploitation, within one year from submission thereof, or at all, or that such provisional approval would lead to the issuance of an exploitation contract with the ISA. On August 2, 2024, the ISA Assembly elected Leticia Carvalho of Brazil as the new Secretary-General of the ISA for the period 2025-2028. There can be no assurances that the ISA’s stated target for adoption of the Mining Code of 2025 will be met or that any application for an exploitation contract will be approved before the final Mining Code is adopted.
Under UNCLOS, the collection of polymetallic nodules underin ourNORI ISAand explorationTOML’s contracts,contract areas will require approval of an ISA Exploitationapplication Contractfor a plan of work for exploitation (which will authorize commercial collection activities). As part of the application for an ISA Exploitationplan Contract,of work for exploitation, all contractors are required to complete baseline studies and an Environment and Social Impact Assessment (ESIA), culminating in an EIS, prior to collecting nodules at a commercial scale. The EIS would be accompanied by an Environmental Monitoring and Management Plan (EMMP) which is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
In order to move ourNORI and TOML’s exploration projects into commercial production,production under the UNCLOS regime, our wholly owned subsidiaries, NORI and TOML will each need to receive an exploitation contract with the ISA, in addition to obtaining related permits that may be required by ourtheir commercial partners. There can be no assurance that the ISA will approve ourthe application for a plan of work for exploitation and issue an exploitation contract to our subsidiaries in a timely manner or at all. Even if the ISA timely evaluates such applicationsapplication(s), our subsidiaries may be required to submit a supplementary EIS or perform additional studies or campaigns before obtaining approval. As such, there is a risk that an exploitation contract may not be granted by the ISA, or may not be granted on a timely basis, thereby delaying ourNORI and TOML’s potential timeline for commercial exploitation, or may be granted on uneconomic terms.
Similarly, with respect to sponsoring State regulation, no assurance can be given that new rules and regulations will not be enacted or that existing rules and regulations will not be applied in a manner that would limit or curtail production or development by our subsidiaries. Amendments to current laws and regulations governing the operations and activities of deep-sea mineral resources companies, or changes in interpretation thereto, or the unwillingness of countries throughout the world to enforce such laws and regulations, could have a material adverse impact on our business, and could cause increases in exploration expenses, capital expenditures, production costs, or put the security of our equipment at risk to activism or piracy. Such amendments could also cause reductions in our future production, or the delay or abandonment in the development of our polymetallic mineral resource properties. There can be no certainty that actions by governmental and regulatory authorities, including changes in regulation, taxation and other fiscal regimes, will not adversely impact our projects or our business. Further, our operations depend on the continuation of the sponsorship agreements between our subsidiaries NORI and TOML and each of their host Sponsoring States, TongaNauru and Nauru,Tonga, respectively. Each subsidiary has been registered and incorporated within such host nationState and each host nationState has maintained effective control, supervision, regulation, and sponsorship over the conduct of such subsidiary. While we have beneficial ownership over suchthese subsidiaries, each subsidiary operates under the regulation and sponsorship of Nauru and Tonga. If such arrangement is challenged, or sponsorship is terminated, we may have to restructure the ownership or operations of sucheach subsidiary to ensure continued State sponsorship. Failure to maintain sponsorship, or secure new state sponsorship, will have a material impact on suchthe subsidiary and on our overall business and operations.
While the rates of payments are yet to be set by the ISA, the 1994 Agreement prescribes a relevant framework that the rates of payments “shall be within the range of those prevailing in respect of land-based mining of the same or similar minerals in order to avoid giving deep seabed miners an artificial competitive advantage or imposing on them a competitive disadvantage.” The ISA has held workshops with stakeholders to discuss and seek comments on the potential financial regime for the collecting of polymetallic nodules in the CCZ. There can be no assurance that the ISA will put in place a Mining Code in a timely manner or at all. Such regulations may also impose burdensome obligations or restrictions on us,NORI and TOML, and/or may contain terms that do not enable usNORI and TOML to develop ourtheir projects.
WeNORI and TOML currently hold exclusive exploration rights throughgranted ourby subsidiariesthe NORI and TOMLISA to two polymetallic nodule areas in the CCZ. The exploration contracts for each of these areas require usNORI and TOML to conduct certain activities in accordance with approved plans of work. Our operations in the CCZ are being conducted under our ISA exploration contracts and will be conducted under these contracts until we receive an exploration license or commercial recovery permit under DSHMRA from NOAA. The NORI Exploration Contract terminates in July 2026 and the TOML Exploration Contract terminates in January 2027. We have submitted an application to the ISA to extend the NORI Exploration Contract and plan to submit an application to the ISA to extend the TOML Exploration Contract, in each case for an additional five years. The suspension or terminationtermination, including the non-renewal of our exploration contract for the NORI areaExploration Contract would, and any of ourthe otherTOML explorationExploration contractsContract could, have a material and adverse effect on our future business prospects and financial condition.
In 2024, the LTC of the ISA established a new process to identify contractors who may be at risk of non-compliance with obligations under their respective exploration contract. In August 2024, as a result of this new process, the ISA sent notifications of such potential risk of non-compliance to TOML. The LTC’s notification to TOML cited concerns, which relate mainly to the failure to conduct planned sampling campaigns, the need to submit digital data in the revised reporting templates, delays in surveys for environmental baseline development, and the delay in submission of its scoping report. TOML responded by the November 30, 2024 deadline and is positioned to take corrective action if necessary. If the LTC deems TOML’s response incomplete or does not effectively address the LTC’s concerns, the LTC, in line with its established process, may report TOML to the ISA Council for further consideration and action. If TOML is deemed to have not remedied all issues raised by the LTC and the ISA then determines that TOML is not in compliance with its obligations under its exploration contract, the ISA could impose monetary sanctions on TOML, suspend some or all rights under the exploration contract, which could include halting exploration activities, or terminate TOML’s exploration contract, any of which could have a material and adverse effect on our future business prospects and financial condition.
Our efforts to pursue deep-sea nodule exploration licenses and a commercial recovery permit under DSHMRA may subject us to conflicting regulatory regimes, uncertain legal interpretations, and operational risks that could adversely affect our business.
As described above, we have initiated a U.S.-based regulatory pathway with the U.S. Department of Commerce and NOAA under DSHMRA for the commercial recovery of polymetallic nodules in the CCZ, while NORI and TOML are maintaining their rights under their exploration contracts issued by the ISA under UNCLOS. We are now prioritizing this U.S. pathway, while preserving our subsidiaries’ rights under their ISA exploration contracts. Although we believe this dual-path approach enhances optionality, it introduces additional risks and complexities, arising from the interaction of parallel international and national regulatory regimes. For example, a U.S.-issued permit would be a unilateral authorization by the United States not formally recognized by the ISA or by states that are parties to UNCLOS. We do not believe pursuing licenses and permits with NOAA under DSHMRA nullifies our subsidiaries’ ISA exploration contracts or their sponsorship contracts with the Republic of Nauru and the Kingdom of Tonga, and NORI and TOML are in compliance with each of their ISA exploration contracts and each of their sponsorship contracts. There can be no assurances, however, that the ISA may not attempt to suspend or terminate NORI and TOML’s existing exploration contracts or that it will renew our NORI exploration contract when it expires in July 2026 or our TOML’s exploration contract when it expires in January 2027. Nor can there be assurances that NORI and TOML’s sponsorship contracts will not be suspended or terminated. In addition, if we proceed under the DSHMRA regime and secure U.S. permits, NORI and TOML may need to relinquish or suspend overlapping rights held under their ISA exploration contracts, which could raise diplomatic concerns or be perceived as undermining the ISA’s authority and allow the ISA to grant rights to these overlapping areas to other parties. While we believe our dual-path strategy is legally sound and the Trump administration, the U.S. Department of Commerce and NOAA have stated that U.S. companies can apply for exploration licenses and commercial recovery permits for deep-sea mining in ocean areas beyond national jurisdiction under DSHMRA, the announcement or implementation of this strategy may cause additional regulatory and political tensions, delay ISA decision-making, or impair NORI and TOML’s ability to secure or maintain exploration contracts or an exploitation contract under the ISA framework and may result in our need to engage in costly and time-consuming litigation to enforce our and/or our subsidiaries’ rights. In addition, a commercial recovery permit issued to us under DSHMRA, if any, may not be recognized by states that are parties to UNCLOS or by the ISA and may be regarded by UNCLOS parties and the ISA as a violation of international law, including UNCLOS, which could affect international perceptions of the project, and could have implications for logistics, processing, and market access in UNCLOS parties for seabed minerals extracted under a U.S. license or permit and for downstream products containing them, or for partnerships involving foreign entities, and could also result in actions, pursuant to UNCLOS, against us under the national laws of UNCLOS state parties, any or all of which could have a material adverse effect on our business, financial condition, liquidity, results of operations and prospects.
There is a risk that a State sponsoring activities in a project area ceases to be a sponsor, or is not permitted to be a sponsor, or that NORI and TOML cease to remain as sponsored contractors by such State; and if an agreement cannot be reached with a substitute sponsoring State, or if weNORI or TOML are unable to transfer ourthe sponsorship with Nauru and Tonga to another State, suchthese subsidiarysubsidiaries couldwill be forced under UNCLOSrequired to cease activities in the CCZ.CCZ under UNCLOS.
Additionally, there is little jurisprudence or interpretative guidance regarding the application of the sponsorship regulations that are applicable to ourNORI and TOML’s business. For example, with respect to the question overas the regulation ofto which Statestate’s canregulations impactapply to the activities of any contractor (such as NORI or TOML), we have taken the view that incorporation, registration and the grant of nationality are critical factors, amongst others, notwithstanding the beneficial ownership of a subsidiary by its parent (“beneficial ownership”). While this position has not been challenged by ourNORI and TOML’s Sponsoring States or the ISA, certain organizations and member states to the ISA that oppose the deep-sea polymetallic nodule exploration and collecting industry have advocated for the use of a beneficial ownership test for state sponsorship, and there are no guarantees that our interpretation will be universally accepted in the future.
The seabed mineral exploration activities of our subsidiaries and their future project development prospects could be affected in varying degrees by political instabilityinstability, including administration changes, the recent outbreak of war in Iran, and changes in government regulation relating to foreign investment and the deep-sea polymetallic collecting business, including expropriation. Operations may also be affected in varying degrees by possible natural disasters in the region, terrorism, military conflict, crime, piracy, fluctuations in currency rates, and high inflation. In addition, from time to time, governments may nationalize private businesses, including companies such as ours.those within our group. There can be no assurance that the governments of countries where we or our affiliates or third-party contractors operate or the governments with which our subsidiaries work in the CCZ will not nationalize companies such as ours and our assets in the future or impose burdensome obligations or restrictions. There can also be no assurance that NOAA or the ISA will not impose burdensome obligations or restrictions on our business or our projects (or those of our affiliates and third-party contractors), or that they will not implement policies or regulations that would prevent us from accomplishing our objectives.
Our efforts to explore a regulatory pathway for deep-sea nodule production under the U.S. Deep Seabed Hard Mineral Resources Act may subject us to conflicting regulatory requirements and other operational risks.
We recently announced a plan to consider a U.S.-based regulatory pathway with NOAA and the U.S. Department of Commerce under the DSHMRA for the exploration and commercial recovery of deep-sea polymetallic nodules in the CCZ. Pursuing this pathway will likely introduce new uncertainties into our business, such as differing and potentially contradictory environmental, permitting and legal requirements, which could negatively impact our expected timelines, costs, ability to secure commercialization rights and operating results. In addition, reliance on a U.S.-based regulatory regime will require support from U.S. policy makers, which support can change over time, depending on a variety of factors.
Although we believe the U.S.-based regulatory pathway potentially offers a clear and predictable route to securing an exploration license and a commercial recovery permit for polymetallic nodules found in the CCZ, we are in the initial planning stages of this strategy and there are no assurances that we will be able to secure any exploration license and a commercial recovery permit under the DSHMRA in a timely manner, or at all, or that our ability to secure any such rights will be on economically viable terms. To date, NOAA has not granted any commercialization rights to seafloor nodule production. In addition, although we do not believe there are any provisions under UNCLOS or other ISA regulations that prohibit us from simultaneously seeking rights under this alternative regulatory pathway, the announcement of this strategy may cause additional regulatory and political instability, prolong the ISA’s review and approval of the final Mining Code and negatively impact our interactions with the ISA and ability to secure an exploitation contract from the ISA.
Our exploration, development, collecting, processing and refining activities are subject to extensive and costly environmental requirements, and current and future laws, regulations, and permits may impose significant costs, liabilities, or obligations, or could limit or prevent our ability to continue our operations as currently contemplated or to undertake new operations.
All phases of exploring for, collecting and processing polymetallic nodules are subject to environmental regulation in multiple jurisdictions, including under international frameworks administered by the ISA and under national laws and regulations administered by governmental authorities, including NOAA pursuant to DSHMRA. No seafloor polymetallic nodule deposit has been developed commercially to date, and the environmental parameters, data sets, methodologies and mitigation measures that regulators may require in connection with the authorization of commercial-scale deep-sea mineral activities have not been fully established under either regime.
Under the ISA framework, the standards, guidelines and procedures applicable to exploitation activities continue to evolve, and a full environmental and social impact assessment for commercial deep-sea nodule collection has not yet been completed and approved. The required scope, content and assessment standards for an ESIA and associated EMMPs have not been finalized, and changes to those standards could require revisions to submissions made by our subsidiaries (NORI and TOML) in connection with any exploitation contract application. The timing, content and outcome of any ISA review process remains uncertain, and the adoption of additional environmental requirements, procedural safeguards or policy measures could materially affect NORI and TOML’s anticipated development timelines or the economic viability of their projects.
In parallel, under the United States regulatory framework, commercial recovery activities would require licenses and permits issued by NOAA, including approvals relating to environmental impact assessment, mitigation, monitoring and compliance with applicable federal environmental statutes. While the United States has an established permitting regime under the DSHMRA, the application of that framework to commercial-scale polymetallic nodule recovery has not been tested in practice. Regulatory interpretations, environmental review expectations, interagency coordination requirements and potential judicial review under U.S. law introduce additional uncertainty, and there can be no assurance that permits or licenses will be granted on acceptable terms, within anticipated timeframes, or at all.
All phases of exploring for and collecting and processing polymetallic nodules are subject to environmental regulation in various jurisdictions and under national as well as international laws and conventions. No seafloor polymetallic nodule deposit has been developed commercially to date, and it is not clear what environmental parameters may need to be measured to satisfy regulatory authorities for an ISA Exploitation Contract to be granted. A full ESIA for deep-sea collecting operations has yet to be completed and approved by the ISA, and the full impact of any polymetallic nodule collecting operation on the environment has yet to be determined. Further, the required standards for an ESIA have not been finalized by the ISA, which could require changes to any submissions made by our subsidiaries in connection with an ISA Exploitation Contract application. Environmental legislation is evolving in a manner which is likely to require strict standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees.
Nodule collection operations in the CCZ are certainexpected to disturb wildlife in the operating area and may impactaffect ecosystem function. The naturenature, extent and severityduration of these impacts on CCZ wildlife are expected to vary by species and arehabitat currentlyand remain subject to significant scientific uncertainty. Our environmental campaigns to establish baseline wildlife and ecosystem function,conditions, pilot the nodule collection systemsystems and monitor potential impacts arising from the use of this system have been completed.completed, Dataand data processing and analysis is inongoing. progressAs and, similar to studies conducted in respect ofwith land-based mining, these studies may not definitively establish the full impacts of activitiesoperations on the biodiversity in the CCZ.biodiversity. Given the significantscale, volumedepth and logistical challenges of deep water and the difficultydeep-sea of sampling and retrieving biological specimens,environment, a complete biological inventory mightmay never be establishedestablished, as is the case in terrestrial environments. Accordingly,and impacts on CCZ biodiversity and ecosystem services may never be,be completelyfully andor definitively known. For the same reasons, it may also not be possible to definitively say whether the impact of nodule collection on global biodiversity will be less significant than those estimated for land-based mining for a similar amount of produced metal.
It is also currently not definitively known whether the risk of biodiversity loss in the CCZ couldcan be eliminated or sufficiently mitigated through setting aside large representative areas of CCZ underspatial protection (13measures, areasoperational currently set aside by the ISA covering 43% of the CCZ)controls or reduced throughother mitigation strategies inside operating areasstrategies, or how long it will take for disturbed seabed areas may take to recover naturally. PriorWhile prior research indicatessuggests that the density, diversity and function ofcertain fauna representing most of resident biomass (including mobile, pelagic and microbial life) are expected tomay recover naturally over years to decades.decades, However, a high level ofsignificant uncertainty existsremains, aroundparticularly recoverywith ofrespect faunato species that requiresdepend theon polymetallic nodules as hard substrate of nodules for critical life function.functions. The extenteffectiveness toof whichmitigation planned measures,measures such as leaving behind partial nodule coverretention, no-collection zones and settinghabitat asideconnectivity no-takecorridors zones,remains wouldunder aidactive recruitmentstudy and recoverymay ofvary anymaterially potentialby nodule-dependentlocation speciesand inoperating impacted areas will depend on factors like habitat connectivity, which is an area that is still under study.conditions.
WhileAlthough we intend to collect seafloor polymetallic nodules in a way that mitigatesdesign and reducesoperate our collection systems to mitigate and reduce potential damageharm to the seafloor, marine life and ecosystem function, we do not know whether the ISA or any other regulatory bodyauthorities under national permitting regimes will seekimpose toadditional imposeor more onerous methodsrestoration, forrehabilitation, the restoration of the disturbed areaoffset or rehabilitationlong-term obligationsmonitoring on our collecting process.obligations. Any such obligations,requirements, to the extent they are overlycostly, burdensome,operationally restrictive or open-ended, could result in material changes to our businessand our subsidiaries’ businesses, increased capital or operating expenditures, or delays or limitations on our ability to proceed with development as currently contemplated.
Environmental permitting processes under both international and national regimes are expected to involve multiple layers of technical review, public scrutiny and potential legal challenge. Under the ISA framework, reviews by the Secretariat, the Legal and Technical Commission and the Council introduce procedural and political risk, and proposed exploitation activities may be subject to opposition from member states or non-governmental organizations, including calls for moratoria or other restrictions on deep-sea mining activities. Under national permitting regimes, including in the United States, approvals may be subject to administrative appeals or judicial review, which could delay or prevent project development.
In addition, sponsoring state approvals, governmental licenses and permits may be required in connection with our activities, and failure to obtain or maintain such approvals could curtail or prohibit planned operations. Failure to comply with applicable environmental laws, regulations or permit conditions may result in enforcement actions, including suspension or cessation of operations, monetary penalties, remedial obligations or civil or criminal liability. Parties engaged in collection operations may also be required to compensate third parties for loss or damage arising from such activities. Any of the foregoing could have a material adverse effect on our business, financial condition, results of operations or prospects.
Although the environmental impact review process has not yet been finalized, all contractors have been made aware of the requirement to complete baseline studies and an ESIA, culminating in an EIS, prior to collecting. The EIS would be accompanied by an EMMP, which will be required as part of the application for an ISA Exploitation Contract within the NORI and TOML contract areas. The EMMP is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
The EMMP will also be submitted to the ISA for approval as part of the ISA Exploitation Contract application. There are no guarantees that the ISA will evaluate any exploitation contract application by our subsidiaries in a timely manner, and even if the ISA does timely evaluate such applications(s), our subsidiary may be required to submit a supplementary EIS before being approved. This may result in delays that could impact our projected timeframe. Furthermore, in the event that the ISA evaluates and approves an application in a timely manner, any aspect of such application and approval theoretically could be subject to legal challenges which could result in further delays that could detrimentally impact our business. For example, certain conservation groups have called for a ten-year moratorium on all deep-sea mineral exploration and exploitation activities. While this agenda does not appear to have directly impacted the development of proposed Final Regulations and Standards and Guidelines by the ISA, any such moratorium would have a material adverse effect on our business.
The environmental permitting process, which includes considerations of the impacts of our activities on the biodiversity of the CCZ, is expected to involve a series of checks and balances with reviews being conducted by the ISA, including technical evaluations by the ISA Secretariat and the LTC. The recommendations of the LTC will then go before the ISA Council (“Council”), a core policy-making body of the ISA, which will then review and, if it deems appropriate, approve the contractor’s application. It would require a two-thirds majority of the Council to reject a development proposal that is recommended to it by the LTC. There are no assurances that the work our subsidiaries have done to date, or their contemplated future operations will satisfy the final environmental rules and regulations adopted by the ISA, and any future changes could delay the timing of such submissions to the ISA or our subsidiaries operations more generally, which could have a material adverse effect on our business. Sponsoring State approvals and permits are currently and may in the future be required in connection with our operations. To the extent such approvals are required and not obtained, our subsidiaries may be curtailed or prohibited from proceeding with planned exploration or development of mineral properties. Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in collection operations may be required to compensate those suffering loss or damage by reason of the collection activities and may have civil or criminal fines or penalties imposed for violations of applicable laws and regulations.
Seafloor polymetallic nodules have never been commercially mined, and there is a risk that our offshore collection and recovery methods and the equipment that we intend to utilize during this process, including transferring nodules to transport vessels and delivering of nodules to port, may not be adequate for the economic development of seafloor polymetallic nodule deposits. The equipment and technology that we intend to utilize has not been fully proven in such subsea conditions and for this specific material and application, and failure to adapt existing equipment or to develop suitable equipment or recovery, transportation and development techniques for the prevailing material and seafloor conditions would have a material adverse effect on the business of our subsidiaries, and the results of their operations and financial condition. As a result, even if we obtain the necessary licenses, permits or approvals to proceed under one or more regulatory pathways, including under the ISA timelyor reviews and approves our expected application for an exploitation contract, which will include a plan of work for exploitation, for NORI Area D,NOAA, there are no assurances that we will have successfully completed all development and pre-production work necessary to start commercial production. We have partnered with Allseas, a leading global offshore contractor, to undertake a pre-production pilot collection system test in which a collector vehicle, a riser and lift system and surface production vessel have been tested. Although the pilot collection system test was successful, pilot-scale testing does not replicate all conditions or risks associated with continuous commercial-scale operations, and there can be no assurance that theirthe technologytechnology, systems or operating procedures tested to date will eventually be adequate for fullsustained scalefull-scale commercial production.
On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of a commercial nodule collection system and, in August 2023 entered into an exclusive use agreement with respect to the Projectvessel Zerothe OffshoreHidden NoduleGem. CollectionWe System.anticipate NORIreaching agreements with Allseas in 2026 on definitive contract terms for both the development of collection system (including preparation of the Hidden Gem and Allseasthe intendfirst tonodule equallycollection finance all costs related to developingsystem), and gettingfor Projectinitial Zerocommercial Offshore Nodule Collection System intonodule production currently. The parties intend to detail and revise these cost estimates in three definitive agreements for the engineering, build and operations phases which the parties expect to enter into before the submissionextension of our exploitationexclusive applicationuse onagreement Junewith 27,respect 2025.to the Hidden Gem. There can be no assurances, however, that we will enter into the binding Heads of Terms and definitive agreements with Allseas in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet,sheet and the exclusive use agreement, or that if such definitive agreements are entered into by us that the proposed commercial systems and secondadditional production vessel(s) will be successfully developed or operated in a particular time period, or at all and hence, we may be delayed in obtaining offshore collection equipment in the event we do not reach agreement with Allseas and have to develop such equipment on our own or through new third-party contractual relationships.
We rely upon third-party consultants, engineers, analysts, scientists, and others to provide analyses, reviews, reports, advice, and opinions regarding our potential projects.projects, Forsuch example,as the NORINORI-D Initial AssessmentPFS and the TOML Mineraland ResourceNORI Statement,IA. The NORI-D PFS and the TOML and NORI IA contain analyses and determinations by third party experts regarding the mineral resourceresources in the subject areas and, in the case of the NORI-D PFS, mineral reserve estimates and other technical and economic information with respect to our contract areas. While these studies have been prepared by qualified persons, they are inherently based on assumptions and interpretations that may change over time or prove inaccurate. There is a risk that such analyses, reviews, reports, advice, opinions, and projects are incorrect or become outdated over time or as our plans change, in particular with respect to mineral resource and reserve estimation, process development, and recommendations for products to be produced, as well as with respect to economic assessments, including estimating the capital and operating costscost of our projectestimates, and forecasting potential futureforecasted revenue streams. Both the NORI-D PFS and TOML and NORI IA are subject to the risks and uncertainties that apply to early-stage technical studies, including that results may not be realized as currently presented. Uncertainties are also inherent in such estimations.
Mineral resource and mineral reserve estimates from the contract areas of NORI and TOML are only estimates.
Estimates of mineral resources and mineral reserves from the contract areas of NORI and TOML described in our SEC filings and reported in the NORI-D PFS and the TOML and NORI IA technical reports prepared by AMC depend on geological interpretation and statistical inferences or assumptions drawn from survey data and recovery and sampling analysis, which might prove to be materially inaccurate. While these reports have been provided by experts, there is a degree of uncertainty attributable to the estimation of mineral resources and mineral reserves. Except for the probable mineral reserves declared in the NORI-D PFS for the Initial Mining Area of NORI Area D as described in the NORI-D PFS, mineral reserves have not been defined for our other contract areas and will require completion of further studies. The NORI-D PFS is not a feasibility study and does not support a development decision, and the TOML and NORI IA is preliminary in nature, contains no mineral reserves, and is not sufficient to determine the economic viability of a mining project. Additionally, the NORI-D PFS does not include the conversion of all mineral resources included in NORI Area D to mineral reserves and does not include the conversion of any mineral resources to proven mineral reserves. You are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded to mineral reserves or that probable mineral reserves will ever be upgraded to proven mineral reserves. Until mineral deposits are actually mined and processed, mineral resources and mineral reserves must be considered as estimates only. Until mineral resources and mineral reserves are actually collected and processed on a commercial scale, the quantity of metal and nodule abundance must be considered as estimates only, and no assurance can be given that the indicated levels of metals will be produced. The estimation of mineral reserves and mineral resources is an iterative process and is, at times, partially dependent upon the judgment of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, experience, statistical analysis of data and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. Estimated mineral reserves and mineral resources may have to be recalculated based on changes in metal prices, further exploration or development activity, actual production experience, or changes in operating or regulatory conditions. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates, or other important factors that influence mineral reserve and mineral resource estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in volume and grades of mineralization will affect the economic viability of placing a property into production and a property’s return on capital. We cannot provide assurance that polymetallic nodules can be collected or processed profitably. The mineral resource and mineral reserve estimates in our SEC filings have been determined and valued based on assumed future metal prices, cut-off grades, production rates, and operating costs that may prove to be inaccurate.
Estimates of mineral resources from the contract areas of NORI and TOML described in our SEC filings and reported in technical reports prepared by AMC are only estimates and depend on geological interpretation and statistical inferences or assumptions drawn from survey data and recovery and sampling analysis, which might prove to be materially inaccurate. While these reports have been provided by experts, there is a degree of uncertainty attributable to the estimation of mineral resources. Mineral reserves have not been defined and will require completion of further studies. Until mineral resources are actually collected and processed on a commercial scale, the quantity of metal and nodule abundance must be considered as estimates only and no assurance can be given that the indicated levels of metals will be produced. In making determinations about whether to advance any of our projects to further development, we must rely upon calculated estimates for the mineral resources and grades of mineralization in our contract areas and estimated equipment production rates, equipment availability and utilization and collection efficiency.
The estimation of mineral reserves and mineral resources is an iterative process and is, at times, partially dependent upon the judgment of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, experience, statistical analysis of data and industry practices. Valid estimates made at a given time may significantly change when new information becomes available.
Estimated mineral reserves and mineral resources may have to be recalculated based on changes in metal prices, further exploration or development activity or actual production experience. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral reserves and mineral resources estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in volume and grades of mineralization will affect the economic viability of placing a property into production and a property’s return on capital. We cannot provide assurance that polymetallic nodules can be collected or processed profitably.
The mineral resource estimates in our SEC filings have been determined and valued based on assumed future metal prices, cut-off grades, production rates and operating costs that may prove to be inaccurate. Extended declines in the market price for nickel, manganese, copper and cobalt may render portions of our mineralization uneconomic and result in reduced reported volume and grades, which in turn could have a material adverse effect on our financial performance, financial position and results of operations.
Extended declines in the market price for nickel, manganese, copper, and cobalt may render portions of our mineralization uneconomic and result in reduced reported volume and grades, which in turn could have a material adverse effect on our financial performance, financial position, and results of operations. In addition, inferred mineral resources have a great amount of uncertainty as to their existence and their economic and legal feasibility. You should not assume that any part of an inferred mineral resource will be upgraded to a higher category or that any of the mineral resources will be reclassified as mineral reserves. CurrentlyA 97%part of the measured and indicated mineral resource in the NORI Area D resourcehave isbeen classified intoas 51 million tonnes of probable mineral reserves in the NORI-D PFS, with the balance of the resource remaining in the measured and indicated and measuredinferred categories.
No deep-sea polymetallic properties in the CCZ that have been identified have as of today been developed into production. Exploration and exploitation risks exist in the discovery, location, definition and recovery of seafloor polymetallic nodule deposits. Given that no seafloor polymetallic nodule deposit has ever been commercially developed, such risks may have a material impact on our ability to accomplish our objectives. Operations may be affected by the availability of suitable vessels and equipment, prevailing sea conditions, changes in meteorological conditions and climate change, currents close to the seafloor and throughout the water column, recovery of materials sampled, lack of experience in delineating deposits, or unsuitability of equipment for recovering such material in prevailing conditions. Substantial expenditures are required to establish mineral resources, mineral reserves, to develop metallurgical processes, and to construct collection and transportation vessels, and we will be required to rely upon the expertise of consultants and others for exploration, development, construction and operational knowhow, and such consultants and third parties may not always be available to support our operations. If we are not able to obtain such expertise or identify alternative sources of expertise, our operations and financial results will be negatively impacted.
The critical metals production industry is capital intensive and competitive. Production of battery materials and manganese alloys is largely dominated by Chinese competitors. These competitors may have greater financial resources, as well as other strategic advantages to operate, maintain, improve and possibly expand their facilities. Additionally, domestic Chinese resources firms have historically been able to produce minerals and/or process metals from land-based operations at relatively low costs due to domestic economic and regulatory factors, including less stringent environmental and governmental regulations and lower labor and benefit costs. In addition to two contracts held by our subsidiaries and partners, 15a number of other entitiesentities, (including ISA Member States and private companies sponsored by ISA Member States)States, currently hold ISA Explorationexploration Contractscontracts for polymetallic nodules.nodules or are pursuing alternative national regulatory pathways for deep-sea mineral exploration and commercial recovery, including under DSHMRA. If and when they move into the exploitation or commercial recovery phase, each of these contract-holdersentities could become potential competitors with respect to the collection of polymetallic nodules and the production of nickel, manganese, copper and cobalt products. Some of these contract holderscompetitors may possess greater financial and/or technical resources. There is increasing competition from new and existing marine mineral players for the availability of marine exploration and support vessels, related marine equipment and specialized personnel, desirable exploration areas, suitable offshore collection and onshore processing equipment, and available capital. There is a risk that competitors may find more promising resources, identify or develop more economic technologies, enter into strategic partnerships that constrain our optionality, or may develop novel methods to collect nodules from the seafloor or process nodules into metals that are more economic than we currently contemplate.contemplate, including through land-based, alternative marine, or hybrid production pathways.
Because our revenue is expected to be from the collection and processing of minerals, changes in demand for, and taxes and other tariffs and fees imposed upon, such minerals and derived mineral products (most notably, nickel, manganese, copper, and cobalt) could significantly affect our profitability. A prolonged or significant economic contraction in the U.S., China or worldwide could put downward pressure on market prices of minerals. Protracted periods of low prices for minerals could significantly reduce revenues and the availability of required development funds in the future. This could cause substantial reductions to, or a suspension of, our exploration, development, collecting and production operations, and impair asset values.
Demand for our minerals may be impacted by changes in supply dynamics and sources, and changes in demand for downstream products, including batteries for EV and energy storage that consume high volumes of the metals we intend to produce, as well as demand for manganese alloys used in steel-making, the targeted market for most of our manganese production. Lack of growth or material increases in new sources of supply in this or in any other related markets may adversely affect the demand for our minerals and any related products, and if the market for these critical existing and emerging technologies does not grow as we expect, grows more slowly than we expect, or if the demand for our products in these markets decreases, then our business, prospects, financial condition and operating results could be harmed. Notably, our financial success in part will depend in part on the expansion of the global manganese market to consume the additional volume of manganese that we intend to produce.produce and on our ability to displace existing supply.
Technology changes rapidly in the industries and end markets that utilize the four metals contained in polymetallic nodules found in the CCZ, nickel, manganese, cobalt and copper. Some of these changes have resulted, and may continue to result, in decreased use of nickel, manganese, cobalt and/or copper in these industries and end markets. For instance, our growth may be affected by the consumer adoption of EVs. The market for EV is relatively new, rapidly evolving, characterized by rapidly changing technologies, price competition, additional competitors, evolving government regulation and industry standards, frequent new vehicle announcements and changing consumer demands and behaviors. While it has been projected that demand for EVs will surge over time, if the market for EVs does not develop as we expect, or develops more slowly than we expect, our business and operating results may be impacted, as we refocus on other industrial uses of the metals we plan to produce. In addition, the adoption of lithium iron phosphate, or LFP, battery chemistries has grown substantially from 4% of the batteries used in passenger EVs in 2015 to an estimated 42%60% in 2023.2025. The continuation of this trend in the use of LFP battery chemistries will decrease the overall demand for nickel- and cobalt-rich battery chemistries in EV use. Additionally, copper is increasingly being substituted with aluminum or other materials in electrical and infrastructure applications, potentially reducing the overall market demand for copper.
Reduced growth in the adoption of electric vehicles by consumers may change our strategy and our business and operating results may be impacted.
Given that we have focused part of our operating plan on the sale of nodule-derived critical metals into the EV supply chain, our growth may be affected by the consumer adoption of EVs. The market for EV is relatively new, rapidly evolving, characterized by rapidly changing technologies, price competition, additional competitors, evolving government regulation and industry standards, frequent new vehicle announcements and changing consumer demands and behaviors. While it has been projected that demand for EVs will surge over time, if the market for EVs does not develop as we expect, or develops more slowly than we expect, our business and operating results may be impacted, as we refocus on other industrial uses of the metals we plan to produce.
Like other businesses that operate in the resources industry, we along with our partners, and our shareholders are subject to pressure and lobbying from non-governmental organizations, particularly with respect to impacts on the deep-sea environment. There is a risk that the demands and actions of such non-governmental organizations may cause significant disruption to our business, which could have a material adverse effect on our operations and financial condition. It is possible that direct action from non-governmental environmental groups could physically impact ongoing operation during exploration, project development and commercial operations. As seen during the coordinated and disruptive activities by Greenpeace International during Campaign 8A,8A in 2023, designed to prevent and obstruct the campaign, such activities can have significant impacts from a timing, financial and safety perspective. There can be no assurances that such activities by Greenpeace and other stakeholder will not materially impact our ongoing operations.
For example, we have been working with Hatch, a global engineering, project management, and professional services firm, to support the development of onshore processing technology for the production of readily saleable copper and manganese products, as well as products such as high-grade nickel and cobalt sulfates for the electric vehicle battery markets. In connection therewith, Hatch has supported us with the development of a near-zero solid waste flowsheet. We are also party to certain agreements with Allseas, pursuant to which, among other things, Allseas has agreed to design, engineer and construct an integrated offshore collection system to collect nodules from NORI Areas, and to assist with shipping efforts thereafter. Allseas developed a test system and demonstrated this capability, but it is not certain that Allseas will convert or will be able to convert such system into a full-scale commercial operation or that we will reach contractual terms with Allseas for such commercial arrangements. If we are unable to enter into definitive agreements with Allseas for the use of its technology for the collection, transport and commercial production of polymetallic nodules, it will have a material adverse effect on our business. We are also working with PAMCO and Korea Zinc in connection with onshore processing capabilities. If we are unable to enter into definitive agreements with either of these parties or any other third party for similar services, our business may be adversely affected. We are also in discussions with third party shipping companies to develop a system and method to transfer nodules to transport vessels and deliver nodules to port.
Management's Discussion & Analysis (MD&A)
New heading “Publication of Technical Reports Prepared under Subpart 1300 of Regulation S-K”
New heading “TMC USA Submits Applications for Commercial Recovery of Deep-Sea Minerals Under U.S. Seabed Mining Code”
New heading “NOAA Confirms Full Compliance of TMC USA’s Exploration License Applications”
New heading “TMC Welcomes U.S. Executive Order to Expedite Permitting and Evaluate Offtake of Critical Minerals from Nodules in the High Seas”
New heading “Corporate Developments”
New heading “TMC and Nauru Announce Updated Sponsorship Agreement for Nauru Ocean Resources Inc. (NORI)”
New heading “TMC and Tonga Announce Updated Sponsorship Agreement for Tonga Offshore Mining Ltd. (TOML)”
New heading “Rutger Bosland, Pioneering Engineer and Technical Lead on Development of TMC’s Nodule Collection System, Joins TMC to Drive Commercial Readiness”
New heading “Peer-reviewed Nature Study”
New heading “Peer-reviewed Nature study demonstrates seafloor plume stays low, settles fast”
New heading “Strategic Investment from Korea Zinc — a World-Leader in Non-Ferrous Metal Refining and pCAM Technology”
New heading “TMC Welcomes NOAA Rule Modernizing Deep-Seabed Mining Permits for U.S. Companies in the High Seas”
New heading “TMC USA Files First Consolidated Deep-Seabed Mining Application, Increasing Expected Commercial Recovery Permit Area to 65,000 km2”
New heading “NOAA Determines TMC USA’s Consolidated Deep-Seabed Mining Application is in Substantial Compliance”
New heading “Strategic Partnership with Mariana Minerals”
New heading “Exclusivity on Lease Option for Site in Brownsville, Texas”
New heading “Regulation of Mining of Deep-Sea Polymetallic Nodules by the United States”
New heading “The Deep Seabed Hard Mineral Resources Act”
New heading “Existing ISA Exploration Contracts”
New heading “Nauru and Tonga Warrant costs”
New heading “Nauru and Tonga Warrant costs”
New heading “Gain on Dilution of Investment”
New heading “Change in Fair Value of Royalty Liability”
Removed heading “June 27, 2025 Submission Date for Subsidiary NORI’s ISA Application, and Expanded Company Strategy”
Removed heading “Termination of Marawa Agreement”
Removed heading “Extensive Submission of Deep-Sea Environmental Data to the ISA”
Removed heading “World-First Cobalt Sulfate Produced from Deep-Seafloor Polymetallic Nodules”
Removed heading “Third Annual Impact Report Published”
Removed heading “ISA Consolidated Draft Regulations”
Removed heading “TMC Applauds U.S. Congressional Mandate for 2025 Defense Department Feasibility Study on Nodule Refining”
Removed heading “Responsible Use of Seafloor Resources Act (RUSRA)”
Removed heading “Amendment to 2023 Credit Facility with Allseas Affiliate”
Removed heading “2024 Credit Facility with ERAS Capital LLC and Gerard Barron”
Removed heading “Steve Jurvetson Joins TMC’s Board of Directors as Vice Chairman and Special Advisor to the CEO”
Removed heading “TMC and PAMCO Achieve Nodule Processing Milestone, Unlocking Critical Battery & Steelmaking Materials at Existing Facilities”
Removed heading “Extension of Credit Facility with ERAS Capital LLC and Gerard Barron”
Removed heading “Extension of Allseas Working Capital Loan Agreement and Termination of Allseas 2023 Credit Facility”
Removed heading “Exploration of Potential U.S.-Based Regulatory Pathway”
Removed heading “Emerging Growth Company Status”
Largest changes
“On March 22, 2024, we entered into an Unsecured Credit Facility with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar, pursuant to which, we may borrow from the 2024 Lenders up to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders), from time to time, subject to certain conditions. …”see in full comparison
“On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $20 million in the aggregate ($10 million from each of the 2024 Lenders), from time to time, subject to certain conditions. …”see in full comparison
“The revised Sponsorship Agreement between Tonga and TOML will remain in force unless terminated by mutual agreement of the parties or earlier terminated in accordance with its terms, including in the event of a material breach by either party. Under the agreement, Tonga will continue to sponsor TOML’s seabed mineral activities in the ISA contract area. …”see in full comparison
“The revised Sponsorship Agreement will remain in force unless terminated by mutual agreement of the parties or earlier terminated in accordance with its terms, including in the event of a material breach by either party or upon the assignment of NORI’s rights and the transfer of sponsorship to another sponsoring State. Under the agreement, NORI will pay Nauru a seabed mineral recovery payment of $2 per tonne of polymetallic nodules recovered under an ISA contract, subject to annual inflation adjustment. …”see in full comparison
“Publication of Technical Reports Prepared under Subpart 1300 of Regulation S-K”see in full comparison
“Regulation of Mining of Deep-Sea Polymetallic Nodules by the United States”see in full comparison
Full comparison: every changed paragraph (180)
We are a deep seabed minerals developer focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone (“CCZ”), with NORI Area D located about 1,500 miles (or 2,400 kilometers) south-west of San Diego, California. The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,737,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, copper, cobalt and manganese, alongside meaningful concentrations of rare earth elements (REEs) in a single rock.
Our mission is to build a carefully managed shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. We believe significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.
The four metals and REEs contained in the polymetallic nodules are on the U.S. Department of Interior’s “2025 List of Critical Minerals”, with end-uses in strategic sectors including semiconductors and AI data centers, steel manufacturing, the defense and marine industrial base. Nickel was included on the list of 13 minerals selected by the U.S. Department of War in March 2026 for targeted procurement efforts through the Defense Industrial Base Consortium. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped resource of several of these critical metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to initially produce nickel, cobalt and copper-bearing intermediate and metal cathode products as well as a manganese silicate product of approximately 40% manganese comparable to medium-grade manganese ore. Once in production, we may explore expanding into other product formats including silicomanganese alloy, battery-grade sulfates and precursor Cathode Active Materials (pCAM), as well as extracting REEs contained in nodules.
We are now in the development stage following the release of the results of a pre-feasibility study on one of our development areas in a report titled S-K 1300 Prefeasibility Study for NORI Area D Technical Report Summary, dated August 4, 2025, prepared by AMC Consultants Pty Ltd. and other qualified persons (the “NORI-D PFS”), which declared the world’s first mineral reserves for a seafloor polymetallic nodule project demonstrating the project’s economic viability. We also recently released an initial assessment of certain of our other development areas in a report titled S-K 1300 Technical Report Summary—Initial Assessment of TOML and NORI Properties, Clarion-Clipperton Zone, dated August 4, 2025, prepared by AMC Consultants Pty Lt. and other qualified persons (the “TOML and NORI IA” together with the NORI-D PFS, the “Technical Reports”). We have yet to obtain a commercial recovery permit or other related offshore and onshore permits from the regulators. Additionally, we do not yet hold the environmental or other permits required to construct and operate commercial-scale polymetallic nodule processing and refining facilities on land.
Two parallel regulatory regimes exist to regulate deep seabed exploration and extraction activities in the high seas. The United States adopted the Deep Seabed Hard Mineral Resources Act of 1980 (“DSHMRA”), a U.S. domestic statute administered by the U.S. Department of Commerce through the National Oceanic and Atmospheric Administration (“NOAA”) to regulate deep-sea mining activities of its citizens in the high seas. NOAA implemented regulations for exploration licenses in 1981 and for commercial recovery permits in 1989 and amended these regulations introducing a consolidated exploration license and commercial recovery permit application process in 2026. In parallel, the International Seabed Authority (“ISA”), comprised today of 171 countries and the European Union was established in 1994, pursuant to the United Nations Convention on the Law of the Sea (“UNCLOS”) to regulate deep seabed exploration and exploitation activities of the nationals of Member States. The ISA has adopted exploration regulations in 2000 (amended in 2013 and 2014) and issued 19 polymetallic nodule exploration contracts (17 of which are located in the CCZ) but has been unable to adopt the final exploitation regulations, standards and guidelines despite initiating work in 2014. Almost 30 countries, including the United States, have not ratified UNCLOS and are not Member States of the ISA. The United States has remained a persistent objector to UNCLOS ratification, primarily due to its Part XI seabed mining provisions.
We continue focusing on advancing our commercial production strategy under the DSHMRA regime. In April 2025, our wholly owned subsidiary, The Metals Company USA, LLC (“ TMC USA”), submitted two exploration license applications (covering 187,017 square kilometers in the CCZ referred to as TMC USA-A and TMC USA-B) and one commercial recovery permit application (covering 25,160 square kilometers in the CCZ referred to as TMC USA-A) to NOAA. Following the introduction of the consolidated application process by NOAA in January 2026, TMC USA submitted a consolidated exploration license and commercial recovery permit application covering a subset of TMC USA-A area previously applied over in April 2025. The application areas in total are estimated to hold approximately 1.639 billion wet tonnes of measured, indicated and inferred mineral resources. Together, the mineral resources are estimated to contain approximately 15.5 million tonnes of nickel, 12.8 million tonnes of copper, 2.0 million tonnes of cobalt, and 345 million tonnes of manganese.
We believe that DSHMRA provides a viable and robust regulatory path to commercial production, distinct from the ISA regime under UNCLOS, which despite expectations to the contrary, has repeatedly failed to adopt the Regulations and Standards and Guidelines on the Exploitation of Mineral Resources in the Area. On April 24, 2025, the Executive Order 14825, titled “Unleashing America’s Offshore Critical Minerals and Resources” directed the Commerce Secretary to implement an expedited permitting process under DSHMRA. In addition to directing the International Development Finance Corporation, Export-Import Bank and Trade and Development Agency to identify tools to support this new industry, the Executive Order instructed the Departments of War and Energy to assess the use of the National Defense Stockpile for nodule-derived minerals and of entering into offtake agreements for the procurement of these minerals. These departments were also directed to review and support domestic processing capabilities for seabed mineral resources.
At the same time as we pursue the U.S. regulatory pathway, we continue to maintain our ISA contracts and comply with all of our contractual obligations under the ISA system. While the ISA does not have jurisdiction over activities conducted under the regulatory authority of the United States, we maintain two ISA exploration contracts in the CCZ, one held by our subsidiary Nauru Ocean Resources Inc. (“NORI”), sponsored by the Republic of Nauru (“Nauru”), and another held by Tonga Offshore Mining Limited (“TOML”), sponsored by the Kingdom of Tonga (“Tonga”). Operations of NORI and TOML in the CCZ are being conducted under our ISA exploration contracts and will be conducted under these contracts until TMC USA receives an exploration license or commercial recovery permit under DSHMRA from NOAA.
We have key strategic partnerships with (i) Allseas, a leading global offshore engineering contractor, which developed and tested a pilot collection system, and is now modifying it into the first commercial production system, (ii) Pacific Metals Co. Ltd. (“PAMCO”), an experienced Japanese ferronickel producer, which is responsible for pre-feasibility and feasibility studies on nodule processing at their smelting facilities in Hachinohe, Japan, (iii) Korea Zinc, a world leader in non-ferrous metal refining and precursor Cathode Active Material (“pCAM”) technology, partnering to advance development in the U.S. and (iv) Mariana Minerals, a software-first mineral developer and operator working as part of TMC USA’s owners’ team to accelerate the development of potential domestic onshore processing and refining facilities (“Mariana”) and (v) Glencore International AG (“Glencore”) which holds offtake rights to 50% of the NORI nickel and copper production if produced from a TMC-owned or controlled facility. In addition, we are working with engineering firm Hatch Ltd. (“Hatch”) and consultants Kingston Process Metallurgy Inc. (“KPM”) to develop, test and engineer a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth facilities in Pennsuylvania, USA and XPS’ (Glencore subsidiary) facilities in Ontario, Canada; and later at industrial scale at PAMCO’s facilities in Hachinohe, Japan. The matte refining stages have been tested at an SGS facility in Lakefield Canada with positive results. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. On March 19, 2026, we signed a Strategic Partnership Agreement with Mariana focusing on the potential development of a nodule processing and refining facility in the Port of Brownsville, Texas as part of our owner’s team.
We are a deep-sea minerals exploration company focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the CCZ, about 1,500 miles south-west of San Diego, California.
The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,737,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, copper, cobalt and manganese in a single rock. These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of the four critical metals contained in nodules. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products: (i) feedstock for battery cathode precursors (nickel, and cobalt sulfates, or intermediate nickel-copper-cobalt matte or nickel-copper-cobalt alloy) for EV and energy storage markets, (ii) copper cathode for electric wiring, energy transmission and other applications and (iii) manganese silicate for manganese alloy production required for steel production. Our mission is to build a carefully managed shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.
Exploration and exploitation of seafloor minerals in international waters is regulated by the ISA, an intergovernmental organization established pursuant to the 1994 Agreement Relating to the Implementation of the UNCLOS. The ISA grants contracts to sovereign states or to private contractors who are sponsored by a sovereign state. The ISA requires that a contractor obtain and maintain sponsorship by a host nation that is a member of the ISA and signatory to UNCLOS, and such nation must maintain effective supervision and regulatory control over such sponsored contractor. The ISA has issued a total of 19 polymetallic nodule exploration contracts covering approximately 1.28 million square kilometers, or 0.4% of the global seafloor, 17 of which are in the CCZ. We hold exclusive exploration and commercial rights to two of the 17 polymetallic nodule contract areas in the CCZ through our subsidiaries NORI and TOML, sponsored by Nauru and Tonga, respectively.
We have key strategic alliances with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, and is now working to modify it into the first commercial production system and (ii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production if produced from a DGE-owned or controlled facility. In addition, we have worked with engineering firm Hatch and consultants KPM to develop a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’ facilities. The matte refining stages are being tested at SGS Lakefield. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. In November 2022, we entered into a non-binding MoU with Pacific Metals Co Ltd (PAMCO) of Japan pursuant to which PAMCO completed prefeasibility work assessing the prospect of processing nodules using their existing facilities. In November 2023, we entered into a binding MoU with PAMCO whereby they committed to completing a feasibility study (expected to be completed by mid-2025) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility, provided we obtain an exploitation contract from the ISA. The toll treatment is intended to take place on a dedicated Rotary Kiln Electric Arc Furnace (“RKEF”) processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce lithium-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing. We expect this partnership to progress to a definitive tolling agreement in 2025, subject to successful evaluation study outcomes and agreement to mutually acceptable commercial terms. There can be no assurance that we will enter into such definitive strategic alliance in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that if such definitive tolling agreement is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.
We are currently focused on preparing our application for a plan of work to the ISA for our first exploitation contract for the NORI contract area. Given that it is unlikely that the ISA Council would consider any application for a plan of work for exploitation before its next session in March 2025 and to ensure clarity on the submission process, consideration of the Application, and timeline, the Republic of Nauru, in consultation with NORI, formally requested that this issue be added to the agenda of the Council’s March 2025 meeting. Nauru’s proposed agenda item was strongly opposed by Chile, and it is unlikely for there to be an agreed upon process until after an application is received. Based on the current timeline in the consolidated draft regulations issued February 2024, the ISA application review and approval process is expected to be approximately one year from the filing date. See “Project and Regulatory Updates - ISA Developments” below for a further discussion on recent developments at the ISA.
To reach our objective and initiate commercial production, we are working to: (i) definingfurther refine our resource and project economics, (ii) developingcompleted the development and commision a commercial offshore nodule collection system, (iii) assessingcontinue to assess the environmentalenvironmental, social and socialcultural impacts of offshore nodule collection, and (iv) developingsecure existing foreign and/or develop new domestic U.S. onshore technologyfacilities to process collected polymetallic nodules into a manganese silicate product, and an intermediate nickel-copper-cobalt alloy or matte product and/or end-products likeof nickel andnickel, cobalt sulfates, and copper cathode. In addition, we are also in the initial stages of considering the possibility of a U.S.-based regulatory pathway with the U.S. National Oceanic and Atmospheric Administration (“NOAA”) and the U.S. Department of Commerce under the U.S. Deep Seabed Hard Mineral Resources Act (“DSHMRA”) for the commercial production of deep-sea polymetallic nodules in the CCZ.metal.
We are still in the exploration phase and have not yet declared mineral reserves. In addition, we do not have the applicable environmental and other permits required to build and/or operate commercial scale polymetallic nodule processing and refining plants on land.
Publication of Technical Reports Prepared under Subpart 1300 of Regulation S-K
On August 4, 2025, we released (i) the NORI-D PFS, which declared the world’s first mineral reserves for a seafloor polymetallic nodule project demonstrating the project’s economic viability, and the TOML and NORI IA, which provided a concept level valuation for the resources outside of NORI Area D. The NORI-D PFS covers a portion of the area that is included in NORI’s ISA exploration contract and in TMC USA’s consolidated application for exploration license and commercial recovery permit (TMC USA-A) under DSHMRA. The TOML and NORI IA covers the remaining areas held under NORI’s and TOML’s ISA exploration contracts and portions of the areas covered under TMC USA’s applications for exploration license and commercial recovery permits under DSHMRA.
TMC USA Submits Applications for Commercial Recovery of Deep-Sea Minerals Under U.S. Seabed Mining Code
On April 29, 2025, we announced that TMC USA had submitted the first-ever application for a commercial recovery permit and two exploration licenses under DSHMRA. The application area for the commercial recovery permit, TMC USA-A, covers a total combined area of 25,160 square kilometers in the CCZ which includes areas that contain the Company’s already indicated and measured resources. TMC USA also submitted two exploration license applications: TMC USA-A and TMC USA-B with a total combined area of 187,017 square kilometers. The Company believes the TMC USA-A and USA-B exploration areas contain 1.635 billion wet tonnes of polymetallic nodules, with an additional potential exploration upside. The resources are estimated to contain approximately 15.5 million tonnes of nickel, 12.8 million tonnes of copper, 2.0 million tonnes of cobalt, and 345 million tonnes of manganese.
NOAA Confirms Full Compliance of TMC USA’s Exploration License Applications
On August 11, 2025, TMC USA received notice of full compliance from NOAA on its exploration applications, and confirmation that TMC USA has priority right over both exploration areas. Both applications entered the certification stage in late July 2025. The news follows earlier determinations by NOAA in May 2025 that the applications were in substantial compliance, which we believe demonstrates a systematic regulatory process under DSHMRA as we target a fourth quarter 2027 commissioning, subject to timely obtaining all necessary regulatory approvals.
June 27, 2025 Submission Date for Subsidiary NORI’s ISA Application, and Expanded Company Strategy
NORI has set the date of June 27, 2025 for its expected submission of its ISA exploitation application. According to the ISA Council’s decisions ISBA/28/C/24 and ISBA/28/C/25, if NORI submits an application for a plan of work for exploitation before the RRPs have been adopted, the ISA Council at its next meeting, as a matter of priority, will consider the process for considering such an application. The ISA Council is not scheduled to meet again until March 2025 and we believe it is unlikely that the ISA Council would consider an application for a plan of work for exploitation before this session. In light of this, Nauru formally requested that the ISA clarify the submission and review process for such an application at the March 2025 meetings before NORI submits the Application and, therefore, has decided to submit the Application after the March 2025 meetings on June 27, 2025. At the March 2025 meetings, Nauru’s proposed agenda item was strongly opposed by Chile, and it is unlikely for there to be an agreed upon process until after an application is received.
Termination of Marawa Agreement
On November 14, 2024, DeepGreen Engineering Pte. Ltd. (“DeepGreen”) delivered a formal termination notice to Marawa Research and Exploration Limited, ending the Services Agreement dated October 1, 2013 (the “Agreement”), pursuant to DeepGreen’s right to terminate for convenience under the Agreement. The termination became effective on January 14, 2025, and we no longer have any exploration or other rights to the area of the CCZ that was covered by the Agreement. The termination is not expected to have a material adverse effect on our financial position or operations, with non-material ongoing costs and no termination penalties applicable under the Agreement.
World-FirstTMC ProductionPioneers ofProcess Nickelto Produce High-Purity Manganese Sulfate from Deep-Seafloor PolymetallicSeafloor Nodules
In November 2025, we announced that we had successfully produced battery-grade, high-purity manganese sulfate from our nodule-derived manganese silicate product during bench scale trials at our partner KPM’s operating facility in Ontario. North America is largely reliant on foreign sources of manganese. As the planet’s largest source of manganese, nodules hold significant potential to supply a range of key industries from steelmaking and infrastructure to energy, defense and automotive manufacturing, with automakers increasingly turning toward manganese-rich cathode chemistries for their next-generation electric vehicles.
In April 2024, we announced that we had successfully produced the world’s first nickel sulfate derived exclusively from seafloor polymetallic nodules during pilot-scale nodule processing. In partnership with SGS Canada Inc, the testing was undertaken on samples of nickel-cobalt-copper matte produced by us in 2021 using our efficient flowsheet to process high-grade nickel matte directly to nickel sulfate without making nickel metal, while producing fertilizer byproducts instead of solid waste or tailings.
Extensive Submission of Deep-Sea Environmental Data to the ISA
In May 2024, we announced that our subsidiary NORI had made a second submission of key environmental data from all prior environmental baseline campaigns conducted in the NORI Area D exploration area up to January 2022 to DeepData, an open database of contractor data managed by the ISA. The submission of this batch of data includes an extensive set of geochemical and biological samples from across the water column.
World-First Cobalt Sulfate Produced from Deep-Seafloor Polymetallic Nodules
On June 12, 2024, we announced that we successfully produced the world’s first cobalt sulfate derived exclusively from seafloor polymetallic nodules. The cobalt sulfate was generated during bench-scale testing of our hydrometallurgical flowsheet design with SGS Canada Inc. Based on samples of nickel-cobalt-copper matte first produced by us in 2021, SGS tested our efficient flowsheet to process high-grade nickel-copper-cobalt matte directly to high-purity cobalt sulfate without making cobalt metal, while producing fertilizer byproducts instead of solid waste or tailings. The milestone followed the news in May 2024 of our successful production of nickel sulfate, a key raw material input used in the production of energy-dense EV batteries.
Third Annual Impact Report Published
On July 29, 2024, we published our third annual Impact Report to provide an update on key milestones achieved in our assessment of the environmental impacts of nodule collection including, what we believe, is the successful collection of sufficient quantities of environmental baseline and impact data to develop an Environmental Impact Statement and Environmental Mitigation and Management Plan (EMMP) for the world’s first deep-seafloor nodule collection project.
TMC and PAMCO SuccessfullyAchieve Produce Calcine in Commercial-ScaleNodule Processing of Polymetallic NodulesMilestone
In September 2024, we announced that we had successfully produced high temperature material (calcine) during the first phase of a commercial-scale campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan. Approximately 500 tonnes of calcine were produced. On February 18, 2025, we announced that PAMCO had successfully smelted 450 tonnes of calcine into 35 tonnes of NiCuCo alloy and 320 tonnes of Mn silicate products.products, during a campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan, demonstrating the process at scale. The process data and operational experience gathered during the processing trial was used by PAMCO to complete a feasibility study in June 2025 which will inform expected definitive processing agreements between the parties.
ISAU.S. Regulatory Developments
TMC Welcomes U.S. Executive Order to Expedite Permitting and Evaluate Offtake of Critical Minerals from Nodules in the High Seas
On April 25, 2025, we welcomed an Executive Order signed by President Trump to create a robust domestic supply for critical minerals derived from seabed resources. The Executive Order, ‘Unleashing America’s Offshore Critical Minerals and Resources’, directs the Commerce Secretary to implement an expedited permitting process under the DSHMRA, a statute passed by Congress in 1980. In addition to directing the International Development Finance Corporation, Export-Import Bank and Trade and Development Agency to identify tools to support this new industry, the order instructs the Departments of War and Energy to assess the use of the National Defense Stockpile for nodule-derived minerals and entering into offtake agreements for the procurement of these minerals. These departments are also directed to review and support domestic processing capabilities for seabed mineral resources and Defense Production Act authorities. The executive order also issued a directive for a joint assessment, led by the Secretaries of Commerce, State, Interior, and Energy in coordination with U.S. partners and allies, on the feasibility of an international seabed benefit-sharing mechanism.
Corporate Developments
TMC and Nauru Announce Updated Sponsorship Agreement for Nauru Ocean Resources Inc. (NORI)
On June 4, 2025, we announced the signing of a revised Sponsorship Agreement (Agreement), updating the terms of the Agreement signed between the parties in 2017. The Agreement guarantees that Nauru will continue to receive existing financial benefits, training and capacity building programs and in-country community and social programs it receives today, while ensuring that, in consideration for its continued sponsorship of NORI, Nauru will receive continuity benefits upon the commencement of commercial production by any subsidiary of TMC, other than NORI, under the U.S. regulatory regime.
TMC and Tonga Announce Updated Sponsorship Agreement for Tonga Offshore Mining Ltd. (TOML)
On August 4, 2025, we announced the signing of a revised Sponsorship Agreement (Agreement), updating the terms of the Agreement signed between the parties in 2021. The Agreement guarantees that Tonga will continue to receive existing financial benefits, training and capacity building programs and in-country community and social programs it receives today, while ensuring that, in consideration for its continued sponsorship of TOML, Tonga will receive continuity benefits upon the commencement of commercial production by any subsidiary of TMC, other than TOML, under the U.S. regulatory regime.
Rutger Bosland, Pioneering Engineer and Technical Lead on Development of TMC’s Nodule Collection System, Joins TMC to Drive Commercial Readiness
On April 15, 2025, we announced that Rutger Bosland, the engineer and technical lead who oversaw the design, build, and successful test deployment of Allseas’ integrated nodule collection system, had joined the Company as Chief Innovation and Offshore Technology Officer (CIOTO). Rutger will lead offshore innovation and efforts to scale our technologies for commercial production. He brings world-class expertise in deep-sea mining, naval architecture, and offshore operations to TMC, having led a team of 80+ engineers in developing TMC’s nodule collection system, and Allseas’ program to scale-up nodule collection technology in preparation for TMC’s planned commercial operations.
ISA Consolidated Draft Regulations
In February 2024, the ISA released the first consolidated draft regulations on exploitation of Mineral resources in the Area. The revised second consolidated text was released in November 2024. Negotiations on the revised second consolidated text began during part 1 of the ISA’s 30th Session.
TMC Applauds U.S. Congressional Mandate for 2025 Defense Department Feasibility Study on Nodule Refining
On December 30, 2024, we welcomed the signing of legislation calling for financial support from the Defense Department’s Industrial Base Policy office to “assess the feasibility of improving domestic capabilities for refining polymetallic nodule-derived intermediates into high-purity nickel, cobalt sulfate, and copper.” The legislation, signed into law by President Biden on December 23, 2024, was led by the HASC and calls for the completion of a feasibility study by the end of 2025 for a nodule-derived intermediate refinery which would bring the U.S. closer to addressing the biggest vulnerability in its domestic battery supply chains – nickel refining – as identified in Executive Order 14017 from 2021. In addition, our U.S. subsidiary has an outstanding application seeking a $9 million grant under the Defense Production Act Title III program for feasibility work on a domestic refinery for nodule-derived intermediate products.
Responsible Use of Seafloor Resources Act (RUSRA)
In March 2024, legislation was introduced in the U.S. House of Representatives calling for the U.S. to “support international governance of seafloor resource exploration and responsible polymetallic nodule collection by allied partners”, and to “provide financial, diplomatic, or other forms of support for seafloor nodule collection, processing and refining.”
On April 29, 2025, our CEO Gerard Barron gave testimony during a meeting of the U.S. House Natural Resources Subcommittee on Oversight and Investigations at a hearing titled, “Exploring the Potential of Deep-Sea Mining to Expand American Mineral Production”. In his remarks as an expert witness, Mr Barron highlighted the abundant, unattached polymetallic nodule resource as a platform to secure new supplies of critical minerals essential for U.S. infrastructure, defense, energy and technology. Another expert witness, Dr. Thomas Peacock of MIT — one of the world’s leading experts on deep-sea sediment plume dynamics — asked the Committee to be wary of misinformation, stating “unfortunately it’s not the case” that the latest scientific findings are being used to drive decisions and discussions about deep-sea mining.
In September 2024, our CEO Gerard Barron gave testimony during a meeting of the Critical Mineral Policy Working Group for the House Select Committee on the Chinese Communist Party to discuss the U.S.’ heavy reliance on Chinese imports of critical minerals and policy solutions to incentivize greater cooperation with allies to create alternative supplies. Mr. Barron spoke to the potential of seafloor nodules to secure U.S. supplies of key minerals for the energy transition and defense sectors.
Peer-reviewed Rebuttal to Publication
InOn JulyDecember 2024,19, 2025, a peer-reviewed rebuttal was published in Frontiers in Marine Science refuting earlier claims in a paper published by Nature Geoscience publishedthat a paper claimingpurported that seafloor nodules produce oxygen in the absence of sunlight. SinceThe rebuttal argues that the paper’sdark publication,oxygen hypothesis is incompatible with decades of established evidence, and far better explained by the deliberate omission of contradictory data and improper equipment use. The peer-reviewed rebuttal follows the earlier submission of multiple rebuttals have been submitted to Nature warning of serious flaws with the paper’s methodology and claims, prompting calls for the paper to be retracted. Researchers at the University of Tokyo and University of Gothenburg are among the experts that have submitted pre-print rebuttals to the article’s author. Our own rebuttal, published September 19, 2024, notesincluding selective reporting of data and omission of key evidence,evidence includingwhich experiments that showshowed oxygen levels increasing without nodules, directly contradicting the authors’ claims.
Peer-reviewed Nature Study
On December 5, 2025, a peer-reviewed study published in Nature Ecology & Evolution, based on data collected two months after TMC’s test mining, confirmed that biodiversity impacts were confined to the directly mined areas, with no significant changes in plume-affected zones. Independent researchers observed 37% fewer organisms and a 32% reduction in species richness within collector tracks—impacts that were expected and less severe than anticipated. There will likely have been recolonization of mined areas over time, increasing species richness as has been observed with other size classes of sedimentary benthic biota.
Peer-reviewed Nature study demonstrates seafloor plume stays low, settles fast
What changed in the latest 10-Q
Risk Factors
New heading “The ISA’s inquiry into the possible non-compliance of NORI and TOML with their exploration contracts, and the related proceedings before the Seabed Disputes Chamber, could adversely affect our rights under the ISA regime.”
New heading “If we are unable to implement and maintain effective internal controls over financial reporting under Section 404 of the Sarbanes-Oxley Act, investors may lose confidence in the accuracy and completeness of our financial reports and we may face litigation.”
Largest changes
“As a public company, we are subject to the requirements of Section 404 of the Sarbanes-Oxley Act, and are required to implement and maintain internal controls over financial reporting and to report any material weaknesses in such internal controls. Under Section 404(a) of the Sarbanes-Oxley Act, our management is required to report on the effectiveness of our internal controls over financial reporting in our Annual Report on Form 10-K for each fiscal year. …”see in full comparison
“If we are unable to implement and maintain effective internal controls over financial reporting under Section 404 of the Sarbanes-Oxley Act, investors may lose confidence in the accuracy and completeness of our financial reports and we may face litigation.”see in full comparison
“The ISA’s inquiry into the possible non-compliance of NORI and TOML with their exploration contracts, and the related proceedings before the Seabed Disputes Chamber, could adversely affect our rights under the ISA regime.”see in full comparison
“An adverse outcome in the inquiry could result in findings of non-compliance and in remedial measures, sanctions or other action by the ISA in respect of the exploration contracts, including, in certain circumstances, their suspension or termination. The Council of the ISA’s approval of a five-year extension of NORI’s exploration contract is stated to be without prejudice to any findings arising from the inquiry. An adverse outcome could also affect the extension of TOML’s exploration contract and our ability to obtain a contract for exploitation from the ISA.”see in full comparison
“In addition, TOML’s exploration contract is due to expire on January 11, 2027, before the LTC is scheduled to consider its extension application, and TOML expects the contract to be deemed extended from January 12, 2027 under the transitional provision of the ISA’s extension procedures. …”see in full comparison
“The timing of the merits phase is uncertain and may extend well beyond our current expectations. The ISA has asked the Chamber to defer its defense on the merits to March 30, 2027 and, if that request is granted, the merits would not be heard before the second half of 2027 at the earliest. We expect to continue to incur legal costs while the proceedings continue, and prolonged uncertainty may adversely affect our relationships with the ISA, our sponsoring States and our commercial partners.”see in full comparison
Full comparison: every changed paragraph (9)
You should carefully review and consider the information regarding certain factors that could materially affect our business, consolidated financial condition or results of operations set forth under Item 1A. Risk Factors in our 2025 Annual Report on Form 10-K.10-K Thereand our Quarterly Report on Form 10-Q for the quarter ended March 31, 2026. Except as set forth below, there have been no material changes from or additions to the risk factors disclosed in those reports. We may disclose changes to risk factors or additional factors from time to time in our future filings with the SEC.
The ISA’s inquiry into the possible non-compliance of NORI and TOML with their exploration contracts, and the related proceedings before the Seabed Disputes Chamber, could adversely affect our rights under the ISA regime.
In March 2026, the ISA identified our subsidiaries NORI and TOML as contractors requiring specific attention for possible non-compliance with their exploration contracts. NORI and TOML maintain that they have complied with their contractual obligations and have each instituted proceedings against the ISA before the Seabed Disputes Chamber challenging the process by which the inquiry is being conducted.
On July 18, 2026, the Chamber prescribed provisional measures in both proceedings. Those orders are interim, do not prejudge the merits, and did not suspend the inquiries, which the ISA remains able to continue in accordance with the applicable legal framework, including rules of due process. There is no assurance that the Chamber will find in favor of NORI or TOML on the merits, that the ISA will comply with the provisional measures, or that a final decision would afford effective relief.
The timing of the merits phase is uncertain and may extend well beyond our current expectations. The ISA has asked the Chamber to defer its defense on the merits to March 30, 2027 and, if that request is granted, the merits would not be heard before the second half of 2027 at the earliest. We expect to continue to incur legal costs while the proceedings continue, and prolonged uncertainty may adversely affect our relationships with the ISA, our sponsoring States and our commercial partners.
An adverse outcome in the inquiry could result in findings of non-compliance and in remedial measures, sanctions or other action by the ISA in respect of the exploration contracts, including, in certain circumstances, their suspension or termination. The Council of the ISA’s approval of a five-year extension of NORI’s exploration contract is stated to be without prejudice to any findings arising from the inquiry. An adverse outcome could also affect the extension of TOML’s exploration contract and our ability to obtain a contract for exploitation from the ISA.
In addition, TOML’s exploration contract is due to expire on January 11, 2027, before the LTC is scheduled to consider its extension application, and TOML expects the contract to be deemed extended from January 12, 2027 under the transitional provision of the ISA’s extension procedures. If the ISA were to take a different view of the application of that provision, or if either extension were denied or delayed, our exploration rights could lapse or be interrupted, which could adversely affect our sponsorship arrangements with Naoero and Tonga and have a material adverse effect on our business, financial condition and prospects.
If we are unable to implement and maintain effective internal controls over financial reporting under Section 404 of the Sarbanes-Oxley Act, investors may lose confidence in the accuracy and completeness of our financial reports and we may face litigation.
As a public company, we are subject to the requirements of Section 404 of the Sarbanes-Oxley Act, and are required to implement and maintain internal controls over financial reporting and to report any material weaknesses in such internal controls. Under Section 404(a) of the Sarbanes-Oxley Act, our management is required to report on the effectiveness of our internal controls over financial reporting in our Annual Report on Form 10-K for each fiscal year. Based on our capitalization and share price as of June 30, 2026, we expect to transition to “large-accelerated filer” status for the year ending December 31, 2026. As a result, we expect to be subject to Section 404(b) of the Sarbanes-Oxley Act, which will require that our independent registered public accounting firm provide an attestation report on the effectiveness of our internal control over financial reporting for the first time in the Annual Report on Form 10-K for the year ending December 31, 2026, among other additional requirements. Compliance with Section 404(b) of the Sarbanes-Oxley Act will result in increased costs and expenses and will divert management resources from other matters. If we are unable to assert that our internal control over financial reporting is effective, or, if required, our independent registered public accounting firm is unable to express an opinion as to the effectiveness of our internal control over financial reporting, investors may lose confidence in the accuracy and completeness of our financial reports and the valuation of our common shares could be adversely affected. In addition, any misstatement in our financial information caused by a material weakness could lead to shareholder litigation that could have a material adverse effect on our business or financial condition. For example, we have previously identified and remediated material weaknesses in our internal control over financial reporting. Certain of these material weaknesses caused us to restate financial information and resulted in shareholder litigation against us. There is no guarantee we will be able to maintain effective internal controls in the future.
Management's Discussion & Analysis (MD&A)
New heading “TMC and Allseas Sign Commercial Agreement for the First Offshore Nodule Recovery Operation”
New heading “NOAA Determines TMC USA’s Consolidated Deep-Seabed Mining Application for USA-A Area is in Full Compliance”
New heading “TMC Subsidiaries Submit Massive Deep-Sea Dataset to Public Database as Company Launches Video Series on Findings of Environmental Research”
New heading “The Metals Royalty Co. (Nasdaq: TMCR) Begins Public Trading”
New heading “Developments Subsequent to June 30, 2026”
New heading “International Tribunal for the Law of the Sea Unanimously Orders ISA to Respect NORI and TOML’s Due Process Rights”
New heading “NORI Obtains Exploration Contract Extension from the ISA”
New heading “TOML Applies to the ISA for an Extension of its Exploration Contract”
New heading “TMC USA Executes a Master Services Agreement with Mariana Minerals Co.”
New heading “Nauru Warrant cost”
New heading “Six Months ended June 30, 2026 compared to Six Months ended June 30, 2025”
New heading “Exploration and Evaluation Expenses”
New heading “General and Administrative Expenses”
New heading “Nauru Warrant cost”
New heading “Gain on Dilution of Investment”
New heading “Change in Fair Value of Warrant Liability”
New heading “Interest Income”
Removed heading “TMC Subsidiaries Submit Extensive Deep-Sea Dataset to Public Database as Company Launches Video Series on Findings of Environmental Research”
Removed heading “Exclusivity on Lease Option for Site in Brownsville, Texas”
Removed heading “Strategic Partnership with Mariana Minerals”
Removed heading “TMC USA Files First Consolidated Deep-Seabed Mining Application, Increasing Expected Commercial Recovery Permit Area to 65,000 km2 and Receives Substantial Compliance from NOAA”
Removed heading “TMC Welcomes NOAA Rule Modernizing Deep-Seabed Mining Permits for U.S. Companies in the High Seas”
Removed heading “Developments Subsequent to March 31, 2026”
Removed heading “Signing of Offshore System Development and Production Agreement with Allseas”
Largest changes
“TMC USA Files First Consolidated Deep-Seabed Mining Application, Increasing Expected Commercial Recovery Permit Area to 65,000 km2 and Receives Substantial Compliance from NOAA”see in full comparison
“TMC Subsidiaries Submit Extensive Deep-Sea Dataset to Public Database as Company Launches Video Series on Findings of Environmental Research”see in full comparison
“TMC Subsidiaries Submit Massive Deep-Sea Dataset to Public Database as Company Launches Video Series on Findings of Environmental Research”see in full comparison
“International Tribunal for the Law of the Sea Unanimously Orders ISA to Respect NORI and TOML’s Due Process Rights”see in full comparison
“NOAA Determines TMC USA’s Consolidated Deep-Seabed Mining Application for USA-A Area is in Full Compliance”see in full comparison
“TMC Welcomes NOAA Rule Modernizing Deep-Seabed Mining Permits for U.S. Companies in the High Seas”see in full comparison
Full comparison: every changed paragraph (122)
The following discussion and analysis provide information whichthat management believes is relevant to an assessment and understanding of our interim condensed consolidated results of operations and financial condition. The discussion should be read in conjunction with the unaudited condensed interim consolidated financial statements and notes thereto contained in this Quarterly Report on Form 10-Q and the consolidated financial statements and notes thereto for the year ended December 31, 2025 contained in our 2025 Annual Report on Form 10-K. This discussion contains forward lookingforward-looking statements and involves numerous risks and uncertainties, including, but not limited to, those described in “Risk Factors” in Item 1A of Part I of the 2025 Annual Report on Form 10-K.10-K, as updated and/or supplemented in subsequent filings with the SEC, including our Quarterly Report on Form 10-Q for the quarter ended March 31, 2026 and this Quarterly Report on Form 10-Q. Actual results may differ materially from those contained in any forward-looking statements. Unless the context otherwise requires, references to “we”, “us”, “our”, “TMC” and “the Company” are intended to mean the business and operations of TMC the metals company Inc. and its consolidated subsidiaries. The unaudited condensed consolidated interim financial statements for the three and six months ended MarchJune 31,30, 2026 and 2025, respectively, present the financial position and results of operations of TMC the metals company Inc. and its consolidated subsidiaries.
We are a deep seabed minerals developer focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone (“CCZ”). The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,737,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, copper, cobalt and manganese, alongside meaningful concentrations of rare earth elements (“REEs”) in a single rock.
The four base metals and REEs contained in the polymetallic nodules are on the U.S. Department of Interior’s “2025 List of Critical Minerals”, with end-uses in strategic sectors including semiconductors and AI data centers, steel manufacturing, the defense and marine industrial base. Nickel was included on the list of 13 minerals selected by the U.S. Department of War in March 2026 for targeted procurement efforts through the Defense Industrial Base Consortium. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest undeveloped resource of several of these critical metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to initially produce nickel, cobalt and copper-bearing intermediate and high-purity refined metal cathode products as well as a manganese silicate product of approximately 40% manganese comparable to medium-grade manganese ore. Once in production, we may explore expanding into other product formats including silicomanganese alloy, battery-grade sulfates and precursor Cathode Active Materials (“pCAM”), as well as extracting REEs contained in nodules.
We are now in the development stage following the release of the results of a pre-feasibility study on one of our development areas in a report titled S-K 1300 Technical Report Summary - Prefeasibility Study for NORI Area D Technical Report Summary,D, dated August 4, 2025, prepared by AMC Consultants Pty Ltd. and other qualified persons (the “NORI-D PFS”), which declared the world’s first mineral reserves for a seafloor polymetallic nodule project demonstrating the project’s economic viability. WeOn the same date, we also recently released an initial assessment of certain of our other resource areas in a report titled S-K 1300 Technical Report Summary—Initial Assessment of TOML and NORI Properties, Clarion-Clipperton Zone, dated August 4, 2025, prepared by AMC Consultants Pty Lt. and other qualified persons (the “TOML and NORI IA” together with the NORI-D PFS, the “Technical Reports”). We have yet to obtain a commercial recovery permit or other related offshore and onshore permits from the regulators. Additionally, we do not yet hold the environmental or other permits required to construct and operate commercial-scale polymetallic nodule processing and refining facilities on land.
Two parallel regulatory regimes exist to regulate deep seabed exploration and extraction activities in the high seas. The United States adopted the Deep Seabed Hard Mineral Resources Act of 1980 (“DSHMRA”), a U.S. domestic statute administered by the U.S. Department of Commerce through the National Oceanic and Atmospheric Administration (“NOAA”) to regulate deep-sea mining activities of its citizens in the high seas. NOAA implemented regulations for exploration licenses in 1981 and for commercial recovery permits in 1989 and amended these regulations introducing a consolidated exploration license and commercial recovery permit application process in 2026. In parallel, the International Seabed Authority (“ISA”), comprisedwhich today comprises of 171 Member States and the European Union was established in 1994, pursuant to the United Nations Convention on the Law of the Sea (“UNCLOS”) to regulate deep seabed exploration and exploitation activities of the nationals of Member States. The ISA adopted exploration regulations in 2000 (amended in 2013 and 2014) and issued 19 polymetallic nodule exploration contracts (17 of which are located in the CCZ) but has not completed its adoption of the exploitation regulations, standards and guidelines despite initiating work in 2014, and despite being under an obligation to do so by July 2023. Almost 30 countries, including the United States, have not ratified UNCLOS and are not Member States of the ISA. The United States has remained a persistent objector to Part XI of UNCLOS which governs seabed mining in the Area.
We believe that DSHMRA provides a viable and robust regulatory path to commercial production, distinct from the ISA regime under UNCLOS, which despite expectations to the contrary, has repeatedly failed to adopt the regulations and standards and guidelines for the exploitation of mineral resources in the Area. On April 24, 2025, the Executive Order 14825, titled “Unleashing America’s Offshore Critical Minerals and Resources” directed the Secretary of Commerce to implement an expedited process for reviewing and issuing seabed mineral exploration licenses and commercial recovery permits under DSHMRA. In addition to directing the International Development Finance Corporation, Export-Import Bank and Trade and Development Agency to identify tools to support this new industry, the Executive Order instructed the Departments of War and Energy to assess the use of the National Defense Stockpile for nodule-derived materials and of entering into offtake agreements for these minerals. These departments were also directed to review and support domestic processing capabilities for seabed mineral resources.
We continue focusing on advancing our commercial production strategy under the DSHMRA regime. In April 2025, our wholly owned subsidiary, The Metals Company USA, LLC (“TMC USA”), submitted two exploration license applications (covering 187,017 square kilometers in the CCZ referred to as TMC USA-A and TMC USA-B) and one commercial recovery permit application (covering 25,160 square kilometers in the CCZ referred to as TMC USA-A) to NOAA. Following the introduction of the consolidated application process by NOAA in January 2026, TMC USA submitted a consolidated exploration license and commercial recovery permit application covering approximately 65,000 km², representing a significant expansion from the approximately 25,160 km² commercial recovery area in the initial April 2025 application, with an estimated resource of 619 million wet tonnes (Mt) of polymetallic nodules andwith additional potential exploration upside. On April 28, 2026, NOAA determined that the consolidated application is in full compliance with the applicable requirements under DSHMRA, and the application has advanced to the certification review stage. Final permit issuance remains subject to the completion of the certification stagestage1 (including interagency consultation) and an environmental review, including preparation of an Environmental Impact Statement. The application areas in total, including the TMC USA-A and TMC USA-B exploration license areas, are estimated to hold approximately 1.639 billion wet tonnes of measured, indicated and inferred mineral resources. Together, the mineral resources are estimated to contain approximately 15.5 million tonnes of nickel, 12.8 million tonnes of copper, 2.0 million tonnes of cobalt, and 345 million tonnes of manganese.manganese .
AtWhile theTMC sameUSA time as we pursuepursues the U.S. regulatory pathway, our wholly owned subsidiaries, Nauru Ocean Resources Inc. (“NORI”) and Tonga Offshore Mining Limited (“TOML”), continue to maintain their ISA contracts and comply with all of their contractual obligations under the ISA system. The ISA has an ongoing inquiry into the possible non-compliance of NORI and TOML with their exploration contracts, which they dispute. See “Legal Proceedings” in Item 1 of Part II of this Quarterly Report on Form 10-Q. While the ISA does not have jurisdiction over activities conducted by U.S. citizens under the regulatory authority of the United States, NORI and TOML maintain two ISA exploration contracts in the CCZ. NORI is sponsored by the Republic of Naoero, formerly known as the Republic of Nauru (“Naoero” or “Nauru”),2, and TOML is sponsored by the Kingdom of Tonga (“Tonga”). Operations of NORI and TOML in the CCZ are being conducted under their ISA exploration contracts.
1 Certification under DSHMRA and its implementing regulations is an intermediate determination by the NOAA Administrator confirming an applicant’s eligibility (based on financial responsibility, technological capability, prior obligations, and plan adequacy) for an exploration license or commercial recovery permit, but it is not the final issuance of that license or permit.
2 In July 2026, the Republic of Nauru officially changed its name to the Republic of Naoero, restoring the country’s traditional Indigenous name to more faithfully reflect its heritage, language and national identity.
We have key strategic partnerships with (i) Allseas, a leading global offshore engineering contractor, which developed and tested a pilot collection system, and is now modifying it into the first commercial production system, (ii) Pacific Metals Co. Ltd. (“PAMCO”), an experienced Japanese ferronickel producer, which ishas responsible forcompleted pre-feasibility and feasibility studies on nodule processing at their smelting facilities in Hachinohe, Japan, (iii) Korea Zinc, a world leader in non-ferrous metal refining and precursor Cathode Active Material (“pCAM”) technology, partnering to advance development in the U.S. andU.S., (iv) Mariana Minerals, aan American software-first mineral developer and operator working as part of TMC USA’s owners’ team to accelerate the development of potential domestic onshore processing and refining facilities (“Mariana”) and (v) Glencore International AG (“Glencore”) which holds offtake rights to 50% of the NORI nickel and copper production if produced from a TMC-owned or controlled facility. In addition, we are working with engineering firm Hatch Ltd. (“Hatch”) and consultants Kingston Process Metallurgy Inc. (“KPM”) to develop, test and engineer a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth facilities in Pennsylvania, USA and XPS’ (Glencore subsidiary) facilities in Ontario, Canada; and later at industrial scale at PAMCO’s facilities in Hachinohe, Japan. The matte refining stages have been tested at an SGS facility in Lakefield Canada with positive results. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. In addition to the flowsheet scope, Hatch was engaged to conduct a PFS refresh for our potential onshore processing and refining in the United States. On March 19, 2026, we signed a Strategic Partnership Agreement with Mariana focusing on the potential development of a nodule processing and refining facility in the Port of Brownsville, Texas as part of our owner’s team.
Developments in the FirstSecond Quarter 2026
Below are some of the major developments that occurred in the firstsecond quarter of 2026:
TMC Subsidiaries Submit Extensive Deep-Sea Dataset to Public Database as Company Launches Video Series on Findings of Environmental Research
On April 15, 2026, we announced that our subsidiaries NORI and TOML submitted extensive datasets to the ISA’s DeepData, covering a decade of exploration in the Clarion Clipperton Zone. Dataset includes 777 equipment deployments and over 4,800 distinct environmental samples, generating 76,000 biological records and 69,185 geochemical data points, across the entire water column. The submission builds on prior submissions (March 2023 and May 2024) that together comprise hundreds of thousands of records, over 12,000 seafloor images, and extensive deep-pelagic sampling below 4,000 meters, forming one of the most comprehensive deep-ocean monitoring programs. TMC’s subsidiaries now contribute roughly one-third of all CCZ data in DeepData. The data will also be published to the OBIS-ISA node, where TMC subsidiary data already account for 54% of all biological records, a share expected to increase significantly following publication.
Exclusivity on Lease Option for Site in Brownsville, Texas
On March 27, 2026, we announced that TMC USA currently holds an exclusive right of negotiation with the Port of Brownsville, Texas on a lease and / or lease option for land sufficient to develop a domestic nodule processing and refining ecosystem for TMC USA and other American nodule developers, with the ultimate decision conditional on U.S. government support. The option on a 50-year lease would cover a total of 1,466 acres of land at the Port of Brownsville, Texas, in two separate land parcels (735 acres on the Brownsville Texas Shipping Channel and an adjacent 731 acres). There is currently no financial commitment required of TMC USA.
Strategic Partnership with Mariana Minerals
On March 19, 2026, we signed a Strategic Partnership Agreement with Mariana Minerals (“Mariana”) focusing on the potential development of a nodule processing and refining facility in the Port of Brownsville, Texas as part of our owner’s team. Mariana brings an AI, software-first approach to the permitting, construction and operation of critical mineral projects: fast-tracked capital project execution, which enabled Tesla to build its Lithium plant in Texas in less than 20 months and is core to how SpaceX and other cutting edge businesses operate, can be even further accelerated via a software-first approach and offers a faster, more modern pathway to re-industrialization.
TMC USA Files First Consolidated Deep-Seabed Mining Application, Increasing Expected Commercial Recovery Permit Area to 65,000 km2 and Receives Substantial Compliance from NOAA
On January 22, 2026, we announced that TMC USA had submitted a consolidated application to NOAA for an exploration license and a commercial recovery permit for polymetallic nodules in international waters of the CCZ. The application represents the first consolidated exploration license and commercial recovery permit application submitted under NOAA’s new consolidated application and review process and increases the applied for commercial recovery area from ~25,000 to ~65,000 km2, with an estimated resource of 619 million tonnes (Mt) of wet nodules and a potential exploration upside. TMC USA was able to apply under NOAA’s new consolidated process because it can demonstrate the scientific, technical and financial capability to pursue commercial recovery activities expeditiously.
On March 9, 2026, we announced that NOAA determined that the consolidated application submitted by TMC USA for an exploration license and commercial recovery permit is in substantial compliance with the applicable requirements under DSHMRA and its implementing regulations. This determination marks a key step in the U.S. regulatory process for exploration and commercial recovery of polymetallic nodules in the CCZ under NOAA’s new rule establishing a consolidated application and review process. The process enables a more efficient regulatory timeline by allowing exploration-phase environmental, geological, and engineering data to be incorporated directly into the commercial recovery review.
TMC Welcomes NOAA Rule Modernizing Deep-Seabed Mining Permits for U.S. Companies in the High Seas
On January 21, 2026, we welcomed the new rule issued by the National Oceanic and Atmospheric Administration (NOAA) updating regulations governing deep seabed mineral exploration and commercial recovery under DSHMRA. Final rule establishes a consolidated application and review process under DSHMRA, allowing companies that have completed the necessary exploration, environmental, and technological development work to rely on exploration-phase data in commercial recovery permit applications, reducing duplication and improving regulatory efficiency.
Developments Subsequent to March 31, 2026
Signing of Offshore System Development and Production Agreement with Allseas
On May 11, 2026, we signed a Contract for Development Work and Commercial Production with Allseas Deepsea Marine Contractors, a wholly owned subsidiary of Allseas, for the design, development, build, testing, commissioning and operation of an integrated offshore polymetallic nodule collection and production system in our license area, building on our prior Strategic Alliance Agreement and pilot system trials. The Production System is designed for a steady-state production capacity of 3.0 million tonnes per annum (“Mtpa”) of wet nodules, with commissioning and commencement of commercial production subject to receipt of a commercial recovery permit from NOAA. We expect system commissioning to begin in the fourth quarter of 2027, subject to receipt of required permits and regulatory approvals. Operating costs during commercial production are reimbursable on a cost basis, with performance-linked incentives. The Agreement also governs the settlement of amounts previously accrued by the Company in respect of development work and lay-up costs, including amounts owed to Allseas and its affiliates as at March 31, 2026 totaling $32.1 million: these amounts invoiced by Allseas under the former agreement, represent 50% of the costs incurred by Allseas (the "Incurred Costs"). Upon executing the Agreement, the Company has agreed to pay an additional $2.3 million, related to certain initial costs and lay-up costs. In settlement of these amounts (totaling $34.4 million) and pursuant to the Agreement, the Company will issue to Allseas Group S.A. 7,377,835 common shares, with a final settlement of costs up to the signing of this agreement to be completed in accordance with the terms of the Agreement. As prescribed in the Agreement, the settlement in shares is calculated using a volume-weighted average price (VWAP) over the 20 days preceding the effective date as stipulated in the Agreement, less a discount of 10%. Pursuant to the Agreement, Incurred Costs up to the signing of this agreement, not yet invoiced by Allseas, will be payable in any event, which the Company expects to settle in cash through production revenues, in accordance with the terms of the Agreement. The Agreement has an initial term of five years commencing on the start of commercial production, with provision for extension on terms to be agreed. The contract is governed by the laws of England and Wales, with disputes subject to ICC arbitration in London. Allseas is a related party of the Company.
NOAA Confirms Full Compliance ofCertifies TMC USA’s ConsolidatedUSA-B Exploration License Application
On May 28, 2026, NOAA formally certified the USA-B exploration license application submitted by our U.S. subsidiary, TMC USA, representing another key milestone in the regulatory approval process. Following certification, NOAA will begin preparation of an Environmental Impact Statement (EIS) for TMC USA’s planned exploration activities in the USA-B area. The USA-B application area covers ~122,000 km2 of seafloor and hosts an estimated 1.02 billion tonnes of polymetallic nodules based upon TMC’s Technical Report Summary for the Initial Assessment published in August 2025.
TMC and Allseas Sign Commercial Agreement for the First Offshore Nodule Recovery Operation
On May 11, 2026, we announced that we had signed a Contract for Development Work and Commercial Production with our strategic partner and investor Allseas, a global leader in offshore pipeline installation, heavy lift and subsea construction, for the development, commissioning and operation of the first commercial polymetallic nodule collection system. The agreement establishes the commercial framework for advancing offshore nodule recovery operations and builds on the successful pilot collection test completed in 2022. The commercial system is expected to have a nameplate production capacity of 3.0 million wet tonnes of nodules per annum, with commissioning targeted to begin in the fourth quarter of 2027, subject to regulatory approvals.
NOAA Determines TMC USA’s Consolidated Deep-Seabed Mining Application for USA-A Area is in Full Compliance
On April 28, 2026, NOAA determined that the consolidated application by our subsidiary, TMC USA, for an exploration license and commercial recovery permit for the USA-A area under DSHMRA is in full compliance with the requirements of the Act and its implementing regulations, marking a key step in the U.S. regulatory and permitting process. The news follows the earlier determination of substantial compliance on March 6, 2026, and represents another step along the path of regulatory milestones.
TMC Subsidiaries Submit Massive Deep-Sea Dataset to Public Database as Company Launches Video Series on Findings of Environmental Research
On April 15, 2026, we announced that our subsidiaries, NORI and TOML, had submitted extensive environmental datasets to the ISA’s DeepData database, covering a decade of exploration activities in the Clarion Clipperton Zone (CCZ). The submission includes data from 777 equipment deployments and more than 4,800 distinct environmental samples, generating approximately 76,000 biological records and 69,185 geochemical data points across the full water column and seafloor environment. Key findings are showcased in a new video series demonstrating how the data addresses environmental concerns and how innovation has reduced the impact footprint of TMC’s collection system versus legacy technology.
The Metals Royalty Co. (Nasdaq: TMCR) Begins Public Trading
On April 8, 2026, The Metals Royalty Co. began public trading (Nasdaq: TMCR). TMCR has a 2.0% Gross Overriding Royalty (GORR) on the NORI area from a 2023 transaction which was previously announced. As part of the agreement, TMC was granted an equity stake in TMCR, which at that time represented approximately 25% of TMCR’s outstanding equity. TMC retains the right to repurchase up to 75% of the NORI Royalty at an agreed capped return, exercisable in two transactions, between the second and the tenth anniversary of the agreement. If both repurchase transactions are executed, TMCR’s remaining gross overriding royalty on the NORI project revenue will be 0.5%.
Developments Subsequent to June 30, 2026
International Tribunal for the Law of the Sea Unanimously Orders ISA to Respect NORI and TOML’s Due Process Rights
On July 18, 2026, the Seabed Disputes Chamber of the International Tribunal for the Law of the Sea prescribed provisional measures in the proceedings brought by our subsidiaries NORI and TOML against the ISA. In the first contentious case ever decided by the Chamber under Part XI of UNCLOS, the Chamber unanimously found that it has jurisdiction on a prima facie basis, that the rights asserted by NORI and TOML to due process and fair treatment are plausible, and that those rights are at real and imminent risk of irreparable prejudice. The measures require the ISA to act in accordance with the applicable legal framework, including rules of due process, and to provide NORI and TOML the information they need to respond meaningfully. The Chamber did not order the suspension of the inquiries that NORI and TOML had requested. The orders do not prejudge the merits which remain to be determined. For a description of these proceedings, see Note 17 to our unaudited condensed consolidated interim financial statements and “Legal Proceedings” in Item 1 of Part II of this Quarterly Report on Form 10-Q.
NORI Obtains Exploration Contract Extension from the ISA
On July 20, 2026, the Council of the ISA approved a five-year extension of NORI’s exploration contract, effective July 22, 2026 and expiring July 21, 2031.
The approval is without prejudice to any findings or recommendations arising from the ISA’s inquiry into possible non-compliance.
TOML Applies to the ISA for an Extension of its Exploration Contract
On July 10, 2026, TOML applied to the ISA for a five-year extension of its exploration contract, which is due to expire on January 11, 2027. The ISA’s Legal and Technical Commission (“LTC”) is scheduled to consider the application in February and March 2027. Because that is after the contract’s expiry date, TOML expects the contract to be deemed extended from January 12, 2027 under the transitional provision of the ISA’s extension procedures until the Council is able to act on the Commission’s recommendation.
TMC USA Executes a Master Services Agreement with Mariana Minerals Co.
On July 21, 2026, TMC USA entered into a Master Services Agreement (“MSA”) with Mariana Minerals Co. for project development services for a phased program commencing with mobilization and concept development, for the proposed development of a U.S.-based polymetallic nodule processing and refining industry park. The parties are finalizing the first work release under this MSA for the technical design activities required to establish plant feasibility, design basis and a tradeoff and opportunity assessment program for Phase 1, Stage 1 of the proposed onshore nodule processing facility in the Port of Brownsville, Texas.
On April 28, 2026, TMC USA received notice of full compliance from NOAA on its consolidated application. This determination of full compliance is a procedural milestone confirming that the application satisfies the applicable requirements under DSHMRA and its implementing regulations; it does not constitute and should not be construed as an approval, grant, or issuance of the requested exploration license or commercial recovery permit. TMC USA formally submitted a consolidated application to NOAA for an exploration license and a commercial recovery permit for polymetallic nodules in the CCZ on January 22, 2026. The application is now in the certification review stage.
The Deep Seabed Hard Mineral Resources Act of 1980 (“DSHMRA”)
DSHMRA’s implementing regulations for commercial recovery permits requires that all mining vessels and at least one transport vessel arebe U.S. flaggedU.S.-flagged (15 C.F.R. § 971.205). TMC USA will ensure all vessels contracted for commercial recovery comply with relevant laws pertaining to vessel standards and crew safety. DSHMRA’s implementing regulations for commercial recovery permits also require that recovered minerals be processed in the United States unless a waiver is granted, in which case the permittee is required to provide assurances that processed materials are returned to the United States (15 C.F.R. § 971.209). We are currently evaluating U.S.-based vessel and processing options to satisfy this requirement as well as working with Japan and South Korea-based supply chains to ensure processed materials can be returned to the United States in the event the permit to process outside the United States is granted for an initial period. If necessary, we expect to seek a waiver based on the statutory criteria and applicable regulations.
NORI and TOML currently hold exploration rights to certain polymetallic nodule areas in the CCZ, sponsored by the Republic of NauruNaoero and the Kingdom of Tonga, respectively.
NORI, our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011. That contract was concluded on July 22, 2011 for an initial term of 15 years and, following Council approval on July 20, 2026, has been extended to July 21, 2031. NORI is sponsored by NauruNaoero pursuant to a certificate of sponsorship signed by the Government of NauruNaoero on April 11, 2011. In September 2017, NauruNaoero and NORI entered into a sponsorship agreement formalizing certain obligations of the parties in relation to NORI’s exploration and potential collection of nodules in the NORI Contract Area, which was revised in May 2025.
TOML, our wholly-owned subsidiary which we acquired in March 2020, holds exploration rights to an area covering 74,713 square kilometers in the CCZ that were granted by the ISA in January 2012 (the “TOML Contract Area”). That contract was concluded on January 11, 2012 for an initial term of 15 years and is due to expire on January 11, 2027. TOML has applied for a five-year extension, which the ISA’s LTC is scheduled to consider in February and March 2027. On March 8, 2008, Tonga and TOML entered into a sponsorship agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential collection of nodules in the TOML Contract Area, which was most recently revised in August 2025.
The ISA has an ongoing inquiry into the possible non-compliance of NORI and TOML with their respective exploration contracts. NORI and TOML maintain that they have complied and have commenced proceedings before the Seabed Disputes Chamber challenging the process of that inquiry. An adverse outcome could affect their exploration contracts and their ability to obtain contracts for exploitation from the ISA. See Note 17 to our unaudited condensed consolidated interim financial statements and “Risk Factors” in Item 1A of Part II of this Quarterly Report on Form 10-Q.
We are currently a pre-revenue company, and we do not anticipate earning revenues (other than potential service revenue) until one of our wholly-owned subsidiaries receives an exploitation contract or commercial recovery permit and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. We believe that our performance and future success are subject to risks and challenges, including those related to the final issuance of a commercial recovery permit by NOAA, development of environmental terms, conditions and restrictions associated with our application and development of our technologies to collect and process polymetallic nodules. While NOAA has determined that our consolidated application is in full compliance with the applicable requirements under DSHMRA (a procedural milestone that advances the application to the certification review stage), this determination does not constitute, and should not be construed as, a grant or approval of the requested licenses or commercial recovery permit. The permit issuance remains subject to the successful completion of all remaining review stages under DSHMRA, including certification (with interagency consultation), preparation of an Environmental Impact Statement, a public comment period, and NOAA’s final determination as to whether to issue the licenses and permit and, if so, under what terms and conditions. The timing of NOAA’s final decision remains uncertain and is outside the Company’s control. Actual timelines for certification, environmental review,review and potential issuance of licenses or permits may differ materially from management’s current expectations. These risks, as well as other risks, are discussed in the section entitled “Risk Factors” in Item 1A of Part I of the 2025 Annual Report on Form 10-K, as filed with the SEC.
In addition, an adverse outcome in the ISA’s inquiry into NORI’s and TOML’s possible non-compliance with their exploration contracts, or a failure by the ISA to extend TOML’s exploration contract, could adversely affect our rights under the ISA regime. These risks, as well as other risks, are discussed in the section entitled “Risk Factors” in Item 1A of Part I of the 2025 Annual Report on Form 10-K, as filed with the SEC, and in Item 1A of Part II of this Quarterly Report on Form 10-Q.
We are in the development stage with no revenue to date and a net loss of $20.6$60.1 million and $80.7 million for the three and six months ended MarchJune 31,30, 2026, compared to a net loss of $20.6$74.3 million and $94.9 million in the same periodperiods of 2025. We have an accumulated deficit of approximately $971.9$1,032 million from inception through MarchJune 31,30, 2026.
To date, we have not generated any revenue. We expect to generate revenue once we receive a commercial recovery permit,permit and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. Any revenue from initial production is difficult to predict.
We expense as incurred all costs relating to exploration and development of mineral claims. Such exploration and development costs include, but are not limited to, regulatory approvals, exploration mineral title management, geological, geochemical and geophysical studies, environmental baseline studies and process development activities. Our exploration expenses are impacted by the amount of exploration work conducted during each period. The acquisition cost of polymetallic nodule mineral title will be charged to operations as amortization expense on a unit-of-production method based on proven and probable reserves should commercial production commence in the future.
The foreign exchange income or loss for the periods reported primarily relates to unrealized gain or loss due to revaluation of foreign denominatedforeign-denominated accounts payable and accrued liabilities.
TMC insider buying and selling (Form 4)
Since 2026-04-11, insiders reported open-market purchases in 1 Form 4 filing (1 insider, 1 trade date, 7,305,567 shares, about $0) and open-market sales in 1 filing (1 insider, 1 trade date, 20,768 shares, about $133.3K). Net open-market shares: 7,284,799 (purchases minus sales); net value about -$133.3K.Totals add up every open-market (code P and S) line in those filings, using the prices reported in the filings. Awards, option exercises, tax withholding and gifts are listed below but not counted.
| Trade date | Insider | Transaction | Shares | Price | Value |
|---|---|---|---|---|---|
| 2026-09-11 | Hall Andrew |
Grant/award | 72,935 | — | — |
| 2026-07-01 | Heerema Edward |
Open-market purchase | 7,305,567 | — | — |
| 2026-06-02 | May Brendan |
Open-market sale | 20,768 | $6.42 | $133.3K |
| 2026-05-29 | Madsbjerg Christian |
Grant/award | 16,528 | — | — |
| 2026-05-29 | Madsbjerg Christian |
Grant/award | 19,075 | — | — |
| 2026-05-29 | May Brendan |
Grant/award | 16,528 | — | — |
| 2026-05-29 | Khama Sheila |
Grant/award | 17,316 | — | — |
| 2026-05-29 | Khama Sheila |
Grant/award | 16,528 | — | — |
| 2026-05-29 | Eras Capital Llc |
Grant/award | 17,857 | — | — |
| 2026-05-29 | Eras Capital Llc |
Grant/award | 16,528 | — | — |
| 2026-05-29 | Hall Andrew |
Grant/award | 18,263 | — | — |
| 2026-05-29 | Hall Andrew |
Grant/award | 16,528 | — | — |
| 2026-05-29 | Greig Andrew Carlyle |
Grant/award | 20,292 | — | — |
| 2026-05-29 | Greig Andrew Carlyle |
Grant/award | 16,528 | — | — |
| 2026-04-13 | Shesky Craig |
Grant/award | 453,515 | — | — |
| 2026-04-13 | Ilves Erika |
Grant/award | 453,515 | — | — |
| 2026-04-13 | Barron Gerard |
Grant/award | 816,327 | — | — |
Well-known investors holding TMC (13F)
| Investor | Quarter | Shares | Reported value | % of their 13F | Change vs prior quarter |
|---|---|---|---|---|---|
| Citadel Advisors (Ken Griffin) | 2026-06-30 | 3,275,718 | $14.5M | 0.01% | Reduced 10% |
| Millennium Management (Israel Englander) | 2026-06-30 | 2,935,946 | $13.0M | 0.01% | Reduced 4% |
| Renaissance Technologies | 2026-06-30 | 894,400 | $4.0M | 0.01% | Added 23% |
| Point72 Asset Management (Steve Cohen) | 2026-06-30 | 822,415 | $3.6M | 0.01% | Added 408% |
| D. E. Shaw & Co. | 2026-06-30 | 201,456 | $892.5K | 0.0% | Added 349% |
| AQR Capital Management (Cliff Asness) | 2026-06-30 | 135,218 | $599.0K | 0.0% | Added 250% |
| Two Sigma Investments | 2026-06-30 | 114,813 | $508.6K | 0.0% | Reduced 66% |