Companies › TXNM

TXNM 10-K & 10-Q changes, risk factors and insider trading

Txnm Energy Inc. · NYSE · Electric Services · CIK 1108426 · All filings on SEC.gov

Everything below is quoted or computed from Txnm Energy Inc.'s public SEC filings. It is not a recommendation to buy or sell. Automated comparisons can contain errors; confirm with the original filing.

At a glance

28 / 17risk-factor paragraphs added / removed in latest 10-K
8new risk-factor headings
0Form 4 filings reporting open-market purchases (last 180 days)
0Form 4 filings reporting open-market sales (last 180 days)

Jump to: Annual report (10-K) · Quarterly report (10-Q) · Insider transactions · 13F holders

What changed in the latest 10-K

Comparing 10-K filed 2026-02-27 (period ending 2025-12-31) with 10-K filed 2025-02-28 (period ending 2024-12-31).

Risk Factors (10-K Item 1A)

28new paragraphs
17removed paragraphs
24reworded paragraphs
9,206 → 9,933words in section

New heading “Risks Relating to the Proposed Merger with Blackstone Infrastructure”

New heading “There is no assurance when or if the proposed Merger will be completed.”

New heading “Blackstone Infrastructure and TXNM may be unable to obtain the regulatory approvals required to complete the proposed Merger.”

New heading “The announcement and pendency of the proposed Merger, during which TXNM is subject to certain operating restrictions, could have an adverse effect on TXNM’s businesses, results of operations, financial condition, or cash flows.”

New heading “TXNM will incur substantial transaction fees and costs in connection with the proposed Merger.”

New heading “The termination of the Merger Agreement could negatively impact TXNM.”

New heading “Lawsuits have been, and additional lawsuits may be, filed that challenge the proposed Merger, and adverse judgments in these lawsuits may prevent the proposed Merger from becoming effective within the expected timeframe or at all.”

New heading “The Merger Agreement contains provisions that could discourage a potential alternative acquirer that might be willing to pay more to acquire TXNM.”

Removed heading “The conditional conversion feature of the Convertible Notes, if triggered, may adversely affect TXNM’s financial condition and operating results.”

Removed heading “The accounting method for the Convertible Notes could have a material effect on TXNM’s reported financial results.”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

New text topics: lawsuit
“Lawsuits have been, and additional lawsuits may be, filed that challenge the proposed Merger, and adverse judgments in these lawsuits may prevent the proposed Merger from becoming effective within the expected timeframe or at all.”
see in full comparison
New text topics: lawsuit, class action
“TXNM and members of the Board have been, and may be, named as defendants in putative class action lawsuits or other proceedings that have been or may be brought by TXNM shareholders challenging the proposed Merger. If the plaintiffs in any of these actions seek a preliminary or permanent injunction and are successful in obtaining one, the parties may be prevented from completing the proposed Merger in the expected timeframe, if at all. …”
see in full comparison
New text
“The announcement and pendency of the proposed Merger, during which TXNM is subject to certain operating restrictions, could have an adverse effect on TXNM’s businesses, results of operations, financial condition, or cash flows.”
see in full comparison
New text
“The Merger Agreement contains provisions that could discourage a potential alternative acquirer that might be willing to pay more to acquire TXNM.”
see in full comparison
Removed text
“The conditional conversion feature of the Convertible Notes, if triggered, may adversely affect TXNM’s financial condition and operating results.”
see in full comparison
New text
“Blackstone Infrastructure and TXNM may be unable to obtain the regulatory approvals required to complete the proposed Merger.”
see in full comparison
Full comparison: every changed paragraph (69)

Green = added, red = removed. Unchanged paragraphs, 3 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Added

In November 2025, TNMP filed its Base Rate Review requesting recovery of $2.8 billion of rate base as of June 30, 2025, a requested ROE of 10.4%, and a 47.54% equity ratio. The TNMP Base Rate Review also includes increases in operations and maintenance expenses that are not recovered through semi-annual TCOS and DCRF filings, excludes increases in interest expense resulting from refinancing of debt associated with the proposed Merger, and requests recovery of $20.5 million associated with Hurricane Beryl restoration costs.

Removed

In June 2024, PNM filed the 2025 Rate Request for a two-phase implementation of a $3.0 billion increase in total rate base. The increase includes investments in transmission, distribution, and generation facilities to ensure safe, reliable delivery of electricity and a request for an ROE of 10.45%. An adverse outcome in the 2025 Rate Request could negatively impact PNM’s financial position, results of operation, and cash flows. See Note 17.

Reworded

It is also possible that unsatisfactory outcomes of these matters, the financial impact of climate change regulation or legislation, other environmental regulations, the result of litigation, the adequacy and timeliness of cost recovery mechanisms, A - 11 and other business considerations, could jeopardize the economic viability of certain generating facilities or the ability or willingness of individual participants to continue their participation through the periods currently contemplated in the agreements governing those facilities.

Removed

A - 11

Reworded

The utility industry is facing increasing stakeholder scrutiny related to sustainability. Recently, TXNM has seen a rise in certain stakeholders, such as investors, customers, employees, and lenders, placing increasing importance on the impact and social cost associated with climate change. Federal GHG reduction measures setting standards and emission guidelines, and climate-related disclosure rules remain in a state of uncertainty. Therefore, TXNM is dealing with an uncertain regulatory and policy environment and increased scrutiny and changing stakeholder expectations with respect to environmental and climate change programs, judicial decisions, and international accords. Under the Biden Administration, EPA and other federal agencies have sought to expand climate change regulations and workworked to aggressively reduce GHG emissions. AlthoughOn itJanuary is20, uncertain2025, howPresident Trump signed an executive order directing all agencies, including EPA, to review all agency actions and suspend, revise, or rescind those identified as imposing an undue burden on domestic energy resources. The order also expressly directs EPA to submit joint recommendations on the currentlegality Trumpand Administrationcontinuing willapplicability ultimatelyof actthe with2009 respectEndangerment Finding for GHG. On January 7, 2026, EPA sent the proposed rule rescinding the 2009 Endangerment Finding to theseOMB. regulations,On manyFebruary state12, agencies,2026, environmentalthe advocacyfinal groups,rule was finalized as proposed, repealing all GHG emission standards for certain vehicles and otherengines organizationspromulgated willon continuethe basis of the Endangerment Finding. While the Endangerment Finding did not directly impose any requirements on EGUs, EPA has cited the Endangerment Finding as a basis for its authority to focus on decarbonization with enhanced attention onregulate GHG emissions from fossil-fueledEGUs generationunder facilities.CAA SeeSection discussion above and Note 17, regarding PNM’s abandonment applications and the ETA.111. PNM currently depends on fossil-fueled generation for 28.2%25.3% of its electricity. As discussed under Climate Change Issues, this type of generation is subject tothe existing and future EPA or state regulations requiringregarding GHG reductions.reductions for this type of generation are under review. The anticipated expansion of federal and state regulations could result in additional operating restrictions on facilities and increased generation and compliance costs.

Removed

In the first round of the CAA regional haze program, BART determinations were made for both SJGS and Four Corners, requiring the facilities to reduce the levels of visibility-impairing emissions, including NOx, through the installation of control technology, resulting in operating cost increases. Deadlines for SIPs for the second planning period were in July 2021 which NMED was unable to meet. NMED is currently preparing its next regional haze SIP and notified PNM that it will not be required to submit a regional haze four-factor analysis for SJGS since PNM retired its share of SJGS in 2022.

Removed

In February 2024, EPA proposed to impose a federal implementation plan on New Mexico to address the interstate transport of ozone and its precursors, referred to by EPA as the “good neighbor” rule. If finalized as proposed, compliance with the rule would require specified fossil fuel-fired generating resources to participate in an ozone-season NOx emission allowance trading program that will limit total NOx emissions from all affected units within the state of New Mexico. In December 2024, EPA pulled its proposed rule from the OMB and did not specify if and when the rule might be resubmitted for review.

Reworded

If PNM fails to timely obtain, maintain, or comply with any required environmental regulatory approval, operations at affected facilities could be suspended or could subject PNM to additional expenses and potential penalties. Failure to comply with applicable environmental laws and regulations also could result in civil liability arising out of government enforcement actions or private claims. Environmental noncompliance could also result in reputational harm, which may cause stock price decreases or cause certain investors and financial institutions not to purchase the Company’s debt securities or otherwise provide the Company with capital or credit on favorable terms, which may cause the cost of capital to increase. In addition, TXNM and its operating subsidiaries may underestimate the costs of environmental compliance, liabilities, and litigation due to the uncertainty inherent in these matters. Although there is uncertainty about the timing and form of the implementation of EPA’s regulations regarding GHG emissions, climate change, CCRs, power plant emissions, changes to the ambient air quality A - 12 standards, and other environmental issues, the promulgation and implementation of such regulations could have a material impact on operations. The Company is unable to estimate these costs due to the many uncertainties associated with, among other things, the nature and extent of future regulations and changes in existing regulations, including the changes in regulatory policy under the Trump Administration. Timely regulatory recovery of costs associated with any environmental-related A - 12 regulations would be needed to maintain a strong financial and operational profile. The above factors could adversely affect the Company’s business, financial position, results of operations, and liquidity.

Removed

A number of factors influence customers’ electricity usage. These factors include but are not limited to rates charged by PNM and TNMP, rates charged by REPs utilizing TNMP’s facilities to deliver power, energy efficiency initiatives, unusual weather patterns, availability and cost of alternative sources of power, and national, regional, or local economic conditions.

Reworded

A number of factors influence customers’ electricity usage. These factors include but are not limited to rates charged by PNM and TNMP, rates charged by REPs utilizing TNMP’s facilities to deliver power, energy efficiency initiatives, unusual weather patterns, availability and cost of alternative sources of power, and national, regional, or local economic conditions. These factors and others may prompt customers to institute additional energy efficiency measures or take other actions that would result in lower energy consumption. If customers bypass or underutilize PNM’s and TNMP’s facilities through self-generation, renewable, or other energy resources, technological change, or other measures, revenues would be negatively impacted.

Reworded

PNM’s and TNMP’s service territories include several military bases and federally funded national laboratories, as well as large industrial customers that have significant direct and indirect impacts on the local economies where they operate. The Company does not directly provide service to any of the military bases or national laboratories but does provide service to large industrial customers. The Company’s business could be hurt from the impacts on the local economies associated with these customer groups as well as directly from the large industrial customers for a number of reasons including federally-mandated base closures, significant curtailment of the funding of or activities at the bases or national laboratories, and closure of industrial facilities or significant curtailment of their activities.

Reworded

Research and development activities are ongoing for new technologies that produce power or reduce power consumption. These technologies include renewable energy, customer-oriented generation, energy storage, and energy efficiency. PNM generates power at central station power plants to achieve economies of scale and produce power at a cost that is competitive with rates established through the regulatory process. There are distributed generation technologies that produce power, including fuel cells, microturbines, wind turbines, and solar cells, which have become increasingly cost competitive. These advances in technology have reduced the costs of these alternative methods of producing power to a level that is competitive with that of central station power production. In addition, advances made in the capabilities of energy storage have A - 13 further decreased power production and peak usage through the dispatch of more battery systems. These technological advances have resulted in demand reduction that negatively impact revenue and/or result in underutilized assets that have been built to serve peak usage. In addition, certain federal, state, or local requirements that regulated utilities such as PNM are required to follow could result in third parties being able to provide electricity from similar generation technologies to consumers at prices lower than PNM is able to offer. As these technologies become more cost competitive or can be used by A - 13 third parties to supply power at lower prices than PNM is able to offer, PNM’s energy sales and/or regulated returns could be eroded, and the value of its generating facilities could be reduced. Advances in technology could also change the channels through which electric customers purchase or use power, which could reduce the Company’s sales and revenues or increase expenses. These advances can also create more uncertainty in load shapes and forecasts, which could have implications for generation and system planning.

Reworded

The utility industry in which the Company operates is a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure, some of which are deemed to be critical infrastructure under NERC guidelines. Certain of the Company’s systems are interconnected with external networks. In the regular course of business, the utilities handle a range of sensitive security and customer information. PNM and TNMP are A - 14 subject to the rules of various agencies and the laws of various states, related to safeguarding and maintaining the confidentiality of this information. Cyber-attacks regularly occur,occur and generally are unsuccessful. To date, those few events that were successful did not result in significant or consequential business impacts. However, despite steps the Company may take to detect, mitigate, and/or eliminate threats and respond to security incidents, the techniques used by those who wish to obtain unauthorized access, and possibly disable or sabotage systems and/or abscond with information and data, change A - 14 frequently and continue to evolve with the use of artificial intelligence and the Company may not be able to protect against all such actions.

Reworded

A successful physical or cybersecurity attack or other similar failure of the systems could impact the reliability of PNM’s generation and PNM’s and TNMP’s transmission and distribution systems, including the possible unauthorized shutdown of facilities. Such an event could lead to disruptions of business operations, including the Company’s ability to generate, transport, and deliver power to serve customers, to bill customers, and to process other financial information. A breach of the Company’s information systems could also lead to the loss and destruction of confidential and proprietary data, personally identifiable information, trade secrets, intellectual property and supplier data, and could disrupt business operations which could harm the Company’s reputation and financial results, as well as potential increased regulatory oversight, litigation, fines, and other remedial action. The costs incurred to investigate and remediate a physical or cybersecurity attack could be significant. A significant physical or cybersecurity attack on the Company’s critical infrastructure could have an adverse impact on the operations, reputationreputation, and financial condition of TXNM, PNM, and TNMP.

Reworded

Following the transfer of the PVNGS Unit 1 Leased Interest to SRP in January 2023 and the expiration of the leased interest in Unit 2 in January 2024, PNM currently has a 7.3% undivided interest in PVNGS.PVNGS PVNGSthat represented 6.7%6.1% of PNM’s total generating capacity as of December 31, 2024.2025. PVNGS is subject to environmental, health, and financial risks including but not limited to the ability to obtain adequate supplies of nuclear fuel and water, the ability to dispose of spent nuclear fuel, decommissioning of the plant (see above), securing the facilities against possible terrorist attacks, and unscheduled outages due to equipment failures.

Removed

A - 15

Reworded

PNM is obligated to supply power to retail customers. As PNM continues to complete the significant transition in generation resources necessary to achieve 100% carbon emission-free generation by 2040,generation, there are certain potential deliverability and cost risks associated with this transition. These risks are in three main areas, including 1) risk of completion of replacement A - 15 resources prior to planned generation unit retirements, 2) increasing levels of renewable generation presenting risks of uncertainty and variability that will be further compounded as neighboring systems transition towards increasing levels of renewable resources, and 3) risks for mitigating possible resource volatility through a shrinking energy market.

Reworded

•reducing usage and/or demand for electricity by our customers in New Mexico and Texas;

Reworded

•causing delays and disruptions in the availability of and timely delivery of materials and components used in our operations;

Reworded

•causing delays and disruptions in the supply chain resulting in disruptions in the commercial operation dates of certain projects;

Reworded

•causing a deterioration in the credit quality of our counterparties, including power purchase agreement providers, contractors or retail customers, that could result in credit losses;

Reworded

•causing impairments of goodwill or long-lived assets and adversely impacting the Company’s ability to develop, construct and operate facilities;

Added

•impacting the Company’s ability to meet the requirements of the covenants in our existing credit facilities, including covenants regarding debt to capitalization

Added

•causing a deterioration in our financial metrics or the business environment that impacts our credit ratings

Added

•decreasing the value of our investment securities held in trusts for pension and other postretirement benefits, and for nuclear decommissioning, SJGS decommissioning, and coal mine reclamation, which could lead to increased funding requirements

Added

•impacting our liquidity position and cost of and ability to access funds from financial institutions and capital markets

Removed

•impacting the Company’s ability to meet the requirements of the covenants in our existing credit facilities, including covenants regarding debt to capitalization;

Removed

•causing a deterioration in our financial metrics or the business environment that impacts our credit ratings;

Removed

•decreasing the value of our investment securities held in trusts for pension and other postretirement benefits, and for nuclear decommissioning, SJGS decommissioning, and coal mine reclamation, which could lead to increased funding requirements;

Removed

•impacting our liquidity position and cost of and ability to access funds from financial institutions and capital markets; and

Added

Risks Relating to the Proposed Merger with Blackstone Infrastructure

Added

There is no assurance when or if the proposed Merger will be completed.

Added

Completion of the proposed Merger is subject to the satisfaction or waiver of a number of conditions as set forth in the Merger Agreement, including regulatory approvals and other customary closing conditions. There can be no assurance that the conditions to completion of the proposed Merger will be satisfied or waived or that other events will not intervene to delay or result in the failure to close the proposed Merger. In addition, each of Blackstone Infrastructure and TXNM may unilaterally terminate the Merger Agreement under certain circumstances, and Blackstone Infrastructure and TXNM may agree at any time to terminate the Merger Agreement, even though TXNM shareholders already approved the Merger Agreement at a special meeting on August 28, 2025 (and thereby approved the Merger and the other transactions contemplated by the Merger Agreement).

Added

Blackstone Infrastructure and TXNM may be unable to obtain the regulatory approvals required to complete the proposed Merger.

Added

In addition to other conditions set forth in the Merger Agreement, completion of the proposed Merger is conditioned upon the receipt of various state and U.S. federal regulatory approvals, including, but not limited to, expiration or termination of the applicable waiting period under HSR Act and approval by NMPRC, PUCT, FERC, FCC, and NRC. Blackstone Infrastructure and TXNM have made and will make various filings and submissions and will pursue all required consents, orders and approvals in accordance with the Merger Agreement. These consents, orders and approvals may impose requirements, limitations or costs or place restrictions, and if such consents, orders and approvals require an extended period of time to be obtained, such extended period of time could increase the chance that an event occurs that constitutes a material adverse effect with respect to TXNM and thereby may allow Blackstone Infrastructure not to complete the proposed Merger. Such extended period of time also may increase the chance that other adverse effects with respect to TXNM could occur, such as the loss of key personnel. Further, no assurance can be given that the required consents, orders and approvals will be obtained or that the required conditions to closing will be satisfied.

Added

The announcement and pendency of the proposed Merger, during which TXNM is subject to certain operating restrictions, could have an adverse effect on TXNM’s businesses, results of operations, financial condition, or cash flows.

Added

The announcement and pendency of the proposed Merger could disrupt TXNM’s businesses, and uncertainty about the effect of the Merger may have an adverse effect on TXNM. These uncertainties could disrupt the business of TXNM and cause suppliers, vendors, partners, and others that deal with TXNM to defer entering into contracts with TXNM or making other decisions concerning TXNM or seek to change or cancel existing business relationships with TXNM. In addition, TXNM’s employees may experience uncertainty regarding their roles after the Merger; for example, employees may depart either before the completion of the Merger because of such uncertainty and issues relating to the difficulty of coordination or a desire not to remain following the Merger; and the pendency of the Merger may adversely affect TXNM’s ability to retain, recruit, and motivate key personnel. Additionally, the attention of TXNM’s management may be directed towards the completion of the Merger including obtaining regulatory approvals and other transaction-related considerations and may be diverted from the day-to-day business operations of TXNM and matters related to the Merger may require commitments of time and resources that could otherwise have been devoted to other opportunities that might have been beneficial to TXNM. Additionally, the Merger requires TXNM to obtain Blackstone Infrastructure’s consent prior to taking certain specified actions while the Merger is pending. These restrictions may prevent TXNM from pursuing otherwise attractive business opportunities or other capital structure alternatives and making other changes to its business or executing certain of its business strategies prior to the completion of the Merger. Further, the Merger may give rise to potential liabilities, including as a result of pending and future shareholder lawsuits relating to the Merger. Any of these matters could adversely affect the businesses of, or harm the results of operations, financial condition or cash flows of TXNM.

Added

TXNM will incur substantial transaction fees and costs in connection with the proposed Merger.

Added

TXNM has incurred and expects to incur additional material non-recurring expenses in connection with the proposed Merger and completion of the transactions contemplated by the Merger Agreement. Further, even if the proposed Merger is not completed, TXNM will need to pay certain costs relating to the proposed Merger incurred prior to the date the proposed Merger was abandoned, such as legal, accounting, financial advisory, filing, and printing fees.

Added

The termination of the Merger Agreement could negatively impact TXNM.

Added

If the Merger is not completed for any reason, the ongoing business of TXNM may be adversely affected and, without realizing any of the anticipated benefits of having completed the Merger, TXNM would be subject to a number of risks, including the following:

Added

•TXNM may experience negative reactions from the financial markets, including a decline of its stock price (which may reflect a market assumption that the Merger will be completed)

Added

•TXNM may experience negative reactions from its customers, regulators and employees

Added

•TXNM may be required to pay certain costs relating to the Merger, whether or not the Merger is completed

Added

•Matters relating to the Merger will have required substantial commitments of time and resources by TXNM management, which would otherwise have been devoted to day-to-day operations and other opportunities that may have been beneficial to TXNM as an independent company.

Added

If the Merger Agreement is terminated and the Board seeks another merger, business combination or other transaction, TXNM shareholders cannot be certain that TXNM will be able to find a party willing to offer equivalent or more attractive consideration than the consideration TXNM shareholders would receive in the Merger. If the Merger Agreement is terminated under certain circumstances specified in the Merger Agreement (including if Blackstone Infrastructure terminates the Merger Agreement due to a change in recommendation of the Board or if TXNM terminates the Merger Agreement to accept a Superior Proposal (as defined in the Merger Agreement)), TXNM will be required to pay Blackstone Infrastructure a termination fee of $210.0 million, plus costs and expenses.

Added

A - 18

Added

Lawsuits have been, and additional lawsuits may be, filed that challenge the proposed Merger, and adverse judgments in these lawsuits may prevent the proposed Merger from becoming effective within the expected timeframe or at all.

Added

TXNM and members of the Board have been, and may be, named as defendants in putative class action lawsuits or other proceedings that have been or may be brought by TXNM shareholders challenging the proposed Merger. If the plaintiffs in any of these actions seek a preliminary or permanent injunction and are successful in obtaining one, the parties may be prevented from completing the proposed Merger in the expected timeframe, if at all. Even if the plaintiffs in these actions are not successful in obtaining an injunction, they may nevertheless continue the action and seek damages after the transaction has closed. In addition, the costs of defending against such claims could adversely affect the financial condition of TXNM and such actions could adversely affect the reputation of TXNM and members of its Board or management.

Added

Counsel for TXNM received a number of demand letters from law firms on behalf of individuals who are purported TXNM shareholders, accompanied by draft complaints naming TXNM and its directors as defendants and alleging that TXNM’s preliminary proxy statement with respect to the Merger, omitted or misrepresented certain material information. Such draft complaints include a request for injunctive relief with respect to the TXNM shareholder vote to approve, and the closing of, the Merger, as well as other remedies, including counsel fees. In August 2025, reported shareholders filed complaints in New York state court alleging disclosure violations and seeking injunctive relief. TXNM believes that the allegations set forth in the demand letters, draft complaints, and New York state court cases are without merit and, if such complaints are actually filed, will defend such actions vigorously. See Note 16 for additional information concerning the Merger-related litigation.

Added

The Merger Agreement contains provisions that could discourage a potential alternative acquirer that might be willing to pay more to acquire TXNM.

Added

The Merger Agreement contains customary “no shop” provisions which state that we will not solicit or facilitate proposals regarding a merger or similar transaction with another party except in certain limited circumstances. While the Board may withdraw or change its recommendation regarding the Merger Agreement in response to an unsolicited third-party proposal to acquire TXNM that the Board determines to be superior to the Merger, there are restrictions on its ability to do so, and in certain circumstances, TXNM may also be required to pay Blackstone Infrastructure a termination fee. These provisions could discourage a potential third-party acquirer from considering or proposing an alternative acquisition, even if it were prepared to pay consideration with a higher value than that proposed to be paid in the Merger.

Reworded

TXNM and its subsidiaries currently have a significant amount of indebtedness, including the Convertible Notes.Notes and TXNM 2025 Junior Subs. This significant amount of indebtedness could limit TXNM’s ability to obtain additional financing for working capital, capital expenditures, acquisitions, debt service requirements, stock repurchases or other purposes. It may also increase TXNM’s vulnerability to adverse economic, market and industry conditions, limit its flexibility in planning for, or reacting to, changes in its business operations or to its industry overall, and place TXNM at a disadvantage in relation to its competitors that have lower debt levels. Any or all of the above events and/or factors could have an adverse effect on TXNM’s results of operations and financial condition.

Reworded

TXNM and its subsidiaries’ ability to make scheduled payments of the principal of, to pay interest on or to refinance, its indebtedness, including the Convertible Notes,Notes and TXNM 2025 Junior Subs, depends on its future performance, which is subject to economic, financial, competitive and other factors beyond its control. TXNM’s business may not continue to generate cash flow from operations in the future sufficient to service its debt and make necessary capital expenditures. If TXNM is unable to generate such cash flow, TXNM may be required to adopt one or more alternatives, such as selling assets, restructuring debt or obtaining additional equity capital on terms that may be onerous or highly dilutive. TXNM’s ability to refinance its indebtedness will depend on the capital markets and its financial condition at such time. TXNM may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default on its debt obligations.

Reworded

Despite TXNM’s current consolidated debt levels, TXNM and its subsidiaries may be able to incur substantial additional debt in the future, subject to the restrictions contained in the Merger Agreement and its debt instruments, some of which may be senior indebtedness or secured debt. TXNM is not restricted under the terms of the indentures governing the Convertible Notes Indentureor the TXNM 2025 Junior Subs from incurring additional debt, securing existing or future debt, recapitalizing its debt or taking a number of other actions. TXNM’s Credit Agreement restricts its ability to incur additional indebtedness, including secured indebtedness, but if the TXNM Credit Agreement matures or is repaid, TXNM may not be subject to such restrictions under the terms of any subsequent indebtedness.

Removed

The conditional conversion feature of the Convertible Notes, if triggered, may adversely affect TXNM’s financial condition and operating results.

Removed

In the event the conditional conversion feature of the Convertible Notes is triggered, holders of Convertible Notes will be entitled to convert the Convertible Notes at any time during specified periods at their option. If one or more holders elect to convert their Convertible Notes, to the extent TXNM is required to pay cash to settle a portion of its conversion obligation, it could adversely affect TXNM’s liquidity. In addition, even if holders do not elect to convert their Convertible Notes, to the extent TXNM is required to pay cash to settle a portion of its conversion obligations, TXNM would be required under applicable accounting rules to reclassify all or a portion of the outstanding principal of the Convertible Notes as a current rather than long-term liability, which would result in a material reduction of its net working capital.

Removed

The accounting method for the Convertible Notes could have a material effect on TXNM’s reported financial results.

Removed

In August 2020, the Financial Accounting Standards Board issued Accounting Standards Update No. 2020-06, Debt—Debt with Conversion and Other Options (Subtopic 470-20) and Derivatives and Hedging—Contracts in Entity’s Own Equity (Subtopic 815-40): Accounting for Convertible Instruments and Contracts in an Entity’s Own Equity (“ASU 2020-06”), which amends the accounting standards for convertible debt instruments that may be settled entirely or partially in cash upon conversion. ASU 2020-06 eliminates requirements to separately account for liability and equity components of such convertible debt instruments and eliminates the ability to use the treasury stock method for calculating diluted earnings per share for A - 18 convertible instruments whose principal amount may be settled using shares. Instead, ASU 2020-06 requires (i) the entire amount of the security to be presented as a liability on the balance sheet and (ii) application of the “if-converted” method for calculating diluted earnings per share. Under the “if-converted” method, diluted earnings per share will generally be calculated assuming that all the Convertible Notes were converted solely into shares of common stock at the beginning of the reporting period, unless the result would be anti-dilutive, which could adversely affect TXNM’s diluted earnings per share. However, if the principal amount of the convertible debt security, such as the Convertible Notes, being converted is required to be paid in cash and only the excess is permitted to be settled in shares, the if-converted method will produce a similar result as the “treasury stock” method prior to the adoption of ASU 2020-06 for such convertible debt security.

Removed

ASU 2020-06 became effective for TXNM as of the start of fiscal year end 2022 and as such TXNM did not bifurcate the liability and equity components of the Convertible Notes on its balance sheet and TXNM used the if-converted method of calculating diluted earnings per share. To the extent TXNM is required to pay cash to settle the principal amount of the Convertible Notes upon conversion, with only the excess permitted to be settled in shares of TXNM’s common stock, the application of the if-converted method will produce a similar result as the treasury stock method prior to the adoption of ASU 2020-06. The effect of the treasury stock method is that the shares issuable upon conversion of such Convertible Notes are not included in the calculation of diluted earnings per share except to the extent that the conversion value of such Convertible Notes exceeds their principal amount. The requirement that the principal amount of the Convertible Notes upon conversion must be paid in cash could adversely affect TXNM’s liquidity.

Showing the first 60 of 69 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

Management's Discussion & Analysis (MD&A) (10-K Item 7)

54new paragraphs
41removed paragraphs
79reworded paragraphs
18,583 → 19,782words in section

New heading “TNMP Base Rate Review”

Removed heading “System Resiliency Plan (“SRP”)”

Removed heading “2025 Rate Request”

Removed heading “Grid Modernization Plan”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

New text topics: fine, liquidity
“On May 18, 2025, concurrent with the execution of the TXNM Merger Backstop Revolving Facility, TNMP entered into the $1,505.0 million, 364-day TNMP Merger Backstop Term Loan to provide liquidity to repurchase TNMP’s FMBs that were tendered for prepayment pursuant to the Offer (defined below). Borrowings under the TNMP Merger Backstop Term A - 44 Loan were short-term in nature and bore interest at a variable rate. …”
see in full comparison
Reworded topics: litigation, department of justice

Paragraph as it now reads, with added and removed wording marked:

In 2023,2024, EPA published in the Federal Register proposed regulatory actions under CAA sections 111(b) and (d) to replace the Clean Power Plan and the ACE Rule and finalized the rules on May 9, 2024. The final rules include revised new source performance standards under Section 111(b) for all new natural gas-fired combustion turbines and emission guidelines under Section 111(d) requiring states to develop standards of performance for GHG emissions from existing fossil-fuel-fired electric steam generating units. In the final rules, EPA determined that the standards for existing coal- or gas-fired steam generating units must be based on the use of either Carbon Capture Storage (“CCS”) (long-term), natural gas co-firing A - 50 (medium-term), or exempt from the rule via early retirement. The standards for new combustion turbines must be based on CCS (base load), efficient simple cycle design (intermediate load), or lower-emitting fuels (low load). Over a dozen states, several industry groups, and some power companies and labor unions have filed challenges to the rule at the DC Circuit. The DC Circuit heard oral arguments on December 6, 2024 but, on February 5, 2024, the Department of Justice filed a motion asking the DC Circuit to hold the litigation in abeyance while new EPA leadership reviews the rule and decides how to proceed, which indicates the new Trump Administration may not defend the rule in court. On February 19, 2025, the DC Circuit granted EPA’s request for a 60-day abeyance of challenges to the rules.2024.
see in full comparison
Removed text topics: liquidity, interest rate
“The Company currently believes that its capital requirements for at least the next twelve months can be met through internal cash generation, existing, extended, or new credit arrangements, and access to public and private capital markets as discussed above and in Note 7. The Company anticipates that it will be necessary to obtain additional long-term financing to fund its capital requirements and to balance its capital structure during the 2025 – 2029 period. This could include new debt and/or equity issuances. …”
see in full comparison
New text topics: liquidity, interest rate
“The Company currently believes that its capital requirements for at least the next twelve months can be met through internal cash generation, existing, extended, or new credit arrangements, and access to public and private capital markets as discussed above and in Note 7. The Company anticipates that it will be necessary to obtain additional long-term financing to fund its capital requirements and to balance its capital structure during the 2026 – 2030 period. This could include new debt and/or equity issuances. …”
see in full comparison
New text topics: default
“On May 18, 2025, the execution of the Merger Agreement constituted a “Change of Control” under certain TXNM and TNMP debt agreements. Under each of the specified debt agreements, a “Change of Control” constitutes an “Event of Default,” pursuant to which the lender parties thereto had the right to accelerate the indebtedness under the debt agreements. …”
see in full comparison
Removed text topics: climate, labor
“PNM has announced an agreement partnering with Sandia National Laboratories in research and development projects focused on energy resiliency, clean energy, and national security. The partnership demonstrates TXNM’s commitment to sustainability and its support of projects that further its carbon-free generation goals and plans for a reliable, resilient, and secure grid to deliver New Mexico’s clean energy future. …”
see in full comparison
Full comparison: every changed paragraph (174)

Green = added, red = removed. Unchanged paragraphs, 18 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

TXNM, formerly PNMR,TXNM is a holding company with two regulated electric utilities, PNM and TNMP, serving approximately 834,000842,000 residential, commercial, and industrial customers New Mexico and Texas. PNMRTXNM was incorporated in the State of New Mexico in 2000 before it amendedand its Articles of Incorporation and changed its name to TXNM in 2024. Its common stock trades on the New York Stock Exchange under the symbol TXNM.

Added

Merger

Added

On May 18, 2025, TXNM, Parent, and Merger Sub (both Parent and Merger Sub are affiliates of Blackstone Infrastructure) entered into the Merger Agreement pursuant to which Merger Sub will merge with and into TXNM, with TXNM surviving the Merger as a direct, wholly-owned subsidiary of Parent. Pursuant to the Merger Agreement, each issued and outstanding share of the common stock of TXNM (other than those listed in Note 22) at the Effective Time will be converted into the right to receive $61.25 in cash, without interest.

Added

The proposed Merger has been unanimously approved by the Board and was approved by the TXNM shareholders at a special meeting held on August 28, 2025. The waiting period under the HSR Act in connection with the Merger has expired without any objections or concerns having been raised, both the FCC and FERC approved the application, and the PUCT approved the unanimous settlement, satisfying four of the conditions to closing of the Merger Agreement. Consummation of the Merger remains subject to the satisfaction or waiver of certain customary conditions, including, without limitation, no Legal Restraint, and the receipt of certain required regulatory approvals (including the NMPRC and the NRC). TXNM has filed applications for regulatory approval of the Merger with the NMPRC (Note 17). The Merger Agreement does not contain any financing condition and is currently expected to close in the second half of 2026.

Added

On December 11, 2025, TXNM and Blackstone Infrastructure reached a unanimous settlement with parties in the Merger proceeding filed with the PUCT, that was approved on February 6, 2026. On February 20, 2026, FERC approved the proposed Merger rejecting claims related to data centers, private equity ownership, and speculative cross-subsidization relying on existing state ring-fencing protections in New Mexico and Texas. See Note 17.

Removed

System Resiliency Plan (“SRP”)

Removed

In 2023, the Texas Legislature enacted HB 2555, permitting an electric utility to seek approval of, and cost recovery for, a system resiliency plan. On August 28, 2024, TNMP filed its first SRP with the PUCT designed to benefit customers through enhanced resiliency of its distribution system, as intended under HB 2555. The SRP includes approximately $600 million of capital investments and approximately $151 million of other related costs over three years. Investments in the SRP are prioritized based on customer benefit, physical protection of infrastructure, foundational investments in operational and cybersecurity technologies and wildfire risk reduction and are focused on lower-performing areas in the context of reliability. The SRP is subject to PUCT approval over 180 days as stated in Texas legislation.

Removed

On December 11, 2024, TNMP filed an unopposed settlement with the PUCT. The settlement includes $565.8 million of capital investments over 2025 through 2027, reflecting 94% of TNMP’s proposed plan investments. The settlement also encompasses $128.2 million of operations and maintenance expenses associated with several programs, including vegetation management and wildfire mitigation.

Removed

2025 Rate Request

Removed

On June 14, 2024, PNM filed an application with the NMPRC for a general increase in retail electric rates. The application proposes an increase of $174.3 million in retail revenues which is comprised of a $92.2 million increase in base rates and a $82.1 million increase in revenues collected under PNM’s FPPAC and reflects an ROE of 10.45%. The proposed base rate changes would be implemented in two phases, with the first phase effective July 1, 2025 and the second phase effective January 1, 2026. The requested changes reflect recovery of needed investments across distribution, transmission, and generation facilities to ensure safe reliable delivery of electricity, increased operations and maintenance expenses to meet operational needs including wildfire risk mitigation, necessary costs to service customers associated with ESAs previously approved by the NMPRC, and adjustments to Four Corners depreciation rates to recover remaining plant investments through July 2031, the expected abandonment date of the facility.

Removed

On November 26, 2024, PNM filed its unopposed comprehensive stipulation with the NMPRC. Key components include an increase of $105.0 million in retail revenues with the first phase effective July 1, 2025, and the second phase effective April 1, 2026, reflecting an ROE of 9.45%.

Reworded

To achieve itsthe Company’s business objectives, focus is directed in key areas: Safe, Reliable and Affordable Power; Utility Plant Investments; Superior Customer Experience; Environmentally Responsible Power; and Stakeholder and Community Engagement. The Company works closely with its stakeholders to ensure that resource plans and infrastructure investments benefit from robust public dialogue and balance the diverse needs of our communities. Equally important is the focus of TXNM’s utilities on customer satisfaction and community engagement.

Removed

A - 25

Reworded

TXNM measuresmeasure’s reliability and benchmark performance of PNM and TNMP against other utilities using industry-standard metrics, including System Average Interruption Duration Index (“SAIDI”) and System Average Interruption Frequency Index (“SAIFI”). PNM’s and TNMP’s investment plans include projects designed to support reliability and reduce the amount of time customers are without power.

Reworded

TXNM and its utilities are aware of the important roles they play in enhancing economic vitality in their service A - 26 territories. Management believes that maintaining strong and modern electric infrastructure is critical to ensuring reliability and supporting economic growth. When contemplating expanding or relocating their operations, businesses consider energy affordability and reliability to be important factors. PNM and TNMP strive to balance service affordability with infrastructure investment to maintain a high level of electric reliability and to deliver a safe and superior customer experience. Investing in PNM’s and TNMP’s infrastructure is critical to ensuring reliability and meeting future energy needs. Both utilities have long-established records of providing customers with safe and reliable electric service.

Reworded

PNM participates in the EIM, a real-time wholesale energy trading market operated by the CAISO, that enables participating electric utilities to buy and sell energy. The EIM aggregates the variability of electricity generation and load for multiple balancing authority areas and utility jurisdictions. In addition, the EIM facilitates greater integration of renewable resources through the aggregation of flexible resources by capturing diversity benefits from the expanding geographic footprint and the expanded potential uses for those resources. The NMPRC approved collection of PNM’s regulatory asset to recover the initial capital investments and implementation and ongoing costs necessary to participate in the EIM in the 2024 Rate Change final order. PNM passes the cost savings achieved by participating in the EIM through to customers under PNM’s FPPAC. PNM also plans to join the EDAM, which is a voluntary day-ahead regional market that expands on CAISO’s EIM market, as early as 2027.

Added

PNM joined the WRAP in April 2023 to help ensure regional resource availability is visible and coordinated in the event PNM customers are critically impacted by a resource emergency. WRAP is currently in the non-binding phases of the program, which is expected to continue through the summer of 2027. PNM has successfully complied with all WRAP requirements to date and fully supports the need to align a resource adequacy program with coordination between power providers. However, on October 28, 2025, PNM notified the Western Power Pool that it has elected to withdraw from WRAP and will not proceed into the binding phase. PNM will seek to align resource adequacy coordination with others in the EDAM regional market to maximize customer benefits.

Removed

PNM joined the WRAP in April 2023 to bolster PNM’s preparations for times of critical need. WRAP is a first-of-its-kind program in the West that adds a region-wide coordination between power providers for assessing and addressing resource adequacy. This step helps ensure regional resource availability is visible and coordinated in the event PNM customers are critically impacted by a resource emergency. WRAP is currently in the non-binding phases of the program, which is expected to continue through the summer of 2027.

Reworded

OnIn May 1, 2024, PNM filed its updated WMP and its PSPS Plan with the NMPRC. The plans enhance Company wildfire prevention efforts and identify conditions for preventive shutoffs. PNM’s WMP addresses the increasing severity and frequency of extreme weather events and increasing wildfire risk and is focused on situational awareness, field personnel safety practices and operational wildfire mitigation strategies to prevent the accidental ignition of wildfires. PNM’s PSPS Plan is designed to proactively de-energize electrical facilities in identified areas of extreme wildfire risk under certain conditions to reduce the potential of those electrical facilities becoming a wildfire ignition source or contributing to the spread of wildfires.

Reworded

OnIn June 6, 2024, TNMP filed its WMP with the PUCT in response to recent wildfire events impacting the electric utility industry and the customers it serves. TNMP’s WMP establishes a wildfire risk awareness and mitigation strategy that becomes part of a fire safe culture across the Company. The WMP increases grid awareness and serves as a blueprint to help reduce the risk of the accidental ignition of wildfires. The WMP also provides new strategies, technologies, and operating guidelines to enhance grid resiliency and public safety.

Reworded

During the 20232024 and 20242025 periods, PNM and TNMP together invested $2.3$2.4 billion in utility plant,plants, including transmission and distribution systems, substations, power plants, and nuclear fuel. Investment plans emphasize new investments in transmission and distribution infrastructure to support growing demand with grid reliability and resilience and to deliver clean energy. The Company has been improving the diversification of its rate base among regulatory jurisdictions, moving TNMP and FERC transmission rate base to over half of the consolidated rate base.

Reworded

Investments at TNMP support the continued high growth across each region of its service territory. Economic growth across Texas continues to push the demands on TNMP’s system to new levels, including a new system peak in DecemberSeptember 2024.2025. Additionally,In 2023, the Texas legislature in 2023 passed a series of bills aimed at encouraging investments to enhance grid reliability and resilience.resilience, Thewhile the PUCT has developed, and continues to develop,develop rules associatedin withsupport theof this new legislation. TNMP will continue to submit filings for investmentsrecovery andof recoveryits investments, in accordance with these new rulesrules, in addition to the existing rate recovery mechanisms. In June 2025, HB 5247 added Section 36.216 to PURA, which immediately authorized certain electric utilities, including TNMP, to offset depreciation, property tax expenses, and carrying costs with alternative revenue and recognize a regulatory asset for qualifying investments until the following year in which they would file a single, annual proceeding with the PUCT.

Reworded

PNMInvestments has also experienced growing demand, including a new system peak recorded in 2023.at PNM investments are aimed at supporting economic development and advancing the infrastructure beyond its original architecture to a more flexible and redundant system accommodating A - 26 growing amounts of intermittent and distributed generation resources and integrating evolving technologies that provide long-term customer value. New Mexico’s clean energy future depends on a reliable, resilient, secure grid to deliver an evolving mix of energy resources to customers. InA addition,CCN requesting approval of a new transmission line and the application seeking to defer costs of two economic development projects filed under SB 170 support economic development and projects included in the approved Grid Modernization ApplicationPlan will improve customers’ ability to customize their use of energy and modernize PNM’s electric grid through infrastructure and technology improvements. Under New Mexico legislation for grid modernization, the approved investments will be recovered under a rate rider.

Added

A - 27

Removed

At PNM, an increase in transmission investments also supports growing transmission demands across the system and are recovered through an annual FERC formula rate mechanism based on a usage-based system allocation.

Reworded

The Company strives to deliver a superior customer experience. With reliability being the primary role of a transmission and distribution service provider in Texas’ deregulated market, TNMP continues to focus on keeping end-users updated about interruptions and to encourageencouraging consumer preparation when severe weather is forecasted. In 2024, TNMP made significant strides in improving customer satisfaction related to power outages by providing a more user-friendly experience on TNMP’s outage map information system, making it easier for customers to access real-time outage information. In addition, TNMP introduced a new system that allows customers to receive outage alerts through multiple communication channels to enhance transparency and to ensure customers stay informed during outages. In September 2024, TNMP sent employees to assist in restoring power to those communities impacted by Hurricane Helene and in January 2025 TNMP was announced as an Emergency Response Award recipient by the Edison Electric Institute (“EEI”), an association representing all US investor-owned electric companies, Emergency Response Award recipient.companies. The Emergency Response Awards recognize recovery and assistance efforts of electric companies following service disruptions caused by extreme weather or other natural events.

Reworded

In 2024,2025, PNM continuescontinued to hold in-person engagements with residential and business customers through customer advisory councils. These engagements have helped PNM to build and improve customer relationships and have provided PNM with valuable customer insights to gauge customer interest levels towards programs and services to be highly customer centric. Additionally, PNM continues to focus its efforts toon enhanceenhancing the customer experience through customer service improvements, including enhanced digital payment options, strategic customer outreach, and improved communications. TheseIn effortsearly are2025, supportedPNM byintroduced marketa researchredesigned customer bill to make it easier for customers to understand thetheir varyingbill needsas a part of customers,a identifyingbroader commitment to improve transparency and establishingusability. valued services and programs, and proactively communicating and engaging with customers. In 2024, PNM andWhile the broader electric utility industry continuedcontinues to experience ongoing declines in customer satisfaction as measured by J.D. Power.Power, DespitePNM’s this industry-wide trend, PNM achieved modest improvementsranking in its2025 overallremained JDstable, Powerreflecting performancethe rankingCompany’s among investor-owned utilities. These gains reflect PNM’s focusedsustained efforts to enhanceimprove the customer journey by addressing key pain points and deliveringthrough a more seamless and customer-friendly experience. PNM continues to focus on addressing energy affordability by promoting participation in utility programs among households with high energy burden to offset high bills. PNM has also implemented efforts to increase participation in low-income energy efficiency programs, including providing additional aid through the PNM Good Neighbor Fund, partnering with state agencies to make it easier to access funding, improving access to clean energy through expanded outreach and communication, and implementing low-income transportation electrification programs. As a result of PNM’s efforts, 6,509 families in need received emergency assistance through the PNM Good Neighbor Fund for the year ended December 31, 2025.

Removed

PNM continues to focus on addressing energy affordability by promoting participation in utility programs among households with high energy burden to offset high bills. PNM has implemented efforts to increase participation in low-income energy efficiency programs, providing additional aid through the PNM Good Neighbor Fund, partnering with state agencies to make it easier to access funding, improving access to clean energy through expanded outreach and communication, and the implementation of low-income transportation electrification programs. As a result of these communication efforts, 3,665 families in need have received emergency assistance through the PNM Good Neighbor Fund for the year ended December 31, 2024.

Reworded

TXNM’s corporate website (www.txnmenergy.com) includes a dedicated section providing key environmental and other information related to PNM’s and TNMP’s operations, including information that collectively demonstrates the Company’s commitment to sustainability. This information highlights plans for PNM to be coal-free no later than 2031 and to achieve a carbon-free generating portfolio by 2040. Achieving our goal of carbon-free by 2040 is dependent on balancing reliability, cost considerations, and maturity of emerging technologies.

Removed

PNM has a Chief Sustainability Officer responsible for developing and implementing the Company’s business strategy and positions on environmental and sustainability policy issues and is charged with establishing organization-wide policies, A - 27 strategies, goals, objectives and programs that advance sustainability and ensure compliance with regulations. The role serves as the Company’s primary contact with various regulatory agencies and stakeholder groups on environmental matters. In addition, the role leads environmental justice work that considers environmental and social impacts of PNM programs and projects on affected communities.

Reworded

PNM’s gridGrid modernizationModernization planPlan is a major step forward toin providing reliable, affordable and sustainable energy. As part of that plan, PNM will promote energy equity whereby installing technology like smart meters and making distribution upgrades will be provided toin low-income areas first in order to allow lower-income customers to gain insights into their energy usage in order to improve affordability and create fairer access to energy. In addition, PNM’s Time-of-Day pilot approved in the 2024 Rate Change final order incentivizes customers, through price signals, to use energy during the day when renewable generation is abundant.

Removed

PNM has announced an agreement partnering with Sandia National Laboratories in research and development projects focused on energy resiliency, clean energy, and national security. The partnership demonstrates TXNM’s commitment to sustainability and its support of projects that further its carbon-free generation goals and plans for a reliable, resilient, and secure grid to deliver New Mexico’s clean energy future. PNM also joined the Electric Power Research Institute (“EPRI”) Climate READi (Resilience and Adaptation) Initiative, a three-year initiative to develop a comprehensive and consistent approach to physical climate risk and facilitate the analysis and application of appropriate climate data among all stakeholders to enhance the planning, design and operation of a resilient power system. In addition, PNM’s Time-of-Day pilot approved in the 2024 Rate Change final order incentivizes customers, through price signals, to use energy during the day when renewable generation is abundant.

Removed

The Infrastructure Investment and Jobs Act, also commonly known as the Bipartisan Infrastructure Law (“BIL”), was signed into law in 2021. This act represents a “once-in-a-generation” investment designed to modernize and upgrade America’s infrastructure. The BIL includes historic investments to upgrade the transmission and distribution systems to improve reliability and resilience, and to facilitate the deployment of more affordable and cleaner energy across the country.

Removed

In October 2024, PNM was selected for two grants from the DOE. The first grant supports the design, construction, and operation of a Virtual Power Plant (“VPP”) that will enable PNM to leverage small, intermittent energy resources on its distribution system to enhance grid management. The second grant was in the Advanced Reliability and Resiliency Operations for Wind and Solar (“ARROWS”) program, in which GridBeyond Ltd, as principal grantee, will receive $3.9 million in DOE funding and PNM will provide the in-kind, $3.9 million local match. The program aims to demonstrate the provision of grid services from utility-owned solar and storage assets using GridBeyond Ltd artificial intelligence (“AI”) powered distributed energy resource management system technology. The AI-powered system will be used to forecast, optimize, and control resources such as wind, solar, and batteries on PNM’s power grid in real-time, and enable GridBeyond Ltd and other partners to collect, analyze, and quantify the overall energy savings that PNM is able to provide with these resources.

Removed

PNM also participates in various grants including a joint submission with Sandia National Laboratories on a project application to DOE for the Flexible and Innovative Transformer Technologies program, where PNM is anticipating matching expected costs incurred by Sandia National Laboratories of $0.4 million, and a $2.0 million grant awarded to the National Renewable Energy Laboratory through DOE, for a project called Protection of Inverter Dependent Transmission Systems.

Reworded

The InflationIRA Reduction Act of 2022 (the “IRA”) providesprovided benefits for TXNM and its customers by extending and enhancing clean energy incentives such as the investment tax credit and production tax credit. As the Company continues its transition away from carbon emitting sources, these credits reduce the cost of renewable investments. In addition, the IRA includes a new production tax credit for existing nuclear facilities that may create an added benefit for PNM’s ownership in the carbon-free PVNGS. Other IRA provisions encourage transportation electrification with new electric vehicleEV credits and added incentives for vehicle charging infrastructure. In July 2025, the OBBBA was enacted and is expected to accelerate the phase-out of certain IRA energy tax credits and restrict the availability of credits for “foreign entities of concern,” as such term is used in the OBBBA.

Reworded

TXNMTXNM’s issustainability buildinggoals upon its goal of 100% carbon-free generation by 2040 withinclude plans for additional emissions reductions through the electrification of its vehicle fleet. Growing the number of electric vehiclesEVs within the Company’s fleet will benefit the environment and lower fuel costs furthering the commitment to sustainability. Under the commitment, existing fleet vehicles will be replaced as they are retired with an increasing percentage of electric vehicles. The goals call for 25% of all light duty fleet purchases to be electric by 2025 and 50% to be electric by 2030.EVs.

Reworded

To demonstrate TXNM’s commitment to increase the electrification of vehicles in its service territory, PNM implemented its first TEP in 2022 and received approval of its 2024-2026 TEP in 2024. PNM has launched new transportation electrification offerings that supportssupport customer adoption of electric vehiclesEVs by addressing barriers to adoption. PNM’s TEP program budget provides financial support to residential and non-residential customers towards the purchase of EV chargers and/or site make-ready costs, as well as customer education and outreach on EV-specific electricity rates to encourage charging during off-peak periods. More than 25% of the program budget is dedicated to low- and moderate-income customers to plan for an equitable transition to an electrified transportation sector.

Reworded

PNM’s utility-owned solar and energy storage capacity, as well as solar, energy storage, wind, and geothermal procurements from facilities in service as of December 31, 2024,2025, have a total net generation capacity of 2,7793,244 MW. In addition to PNM’s owned and third-party contracted solar facilities, PNM also has a customer distributed solar generation program that represented 308.5334.1 MW at December 31, 2024.2025. The NMPRC has approved plans for PNM to procure energy and RECs from additional resources to serve retail customers and a data center located in PNM’s service territory. PNM’s approved resource plansresources have a generation capacity of 9101,453 MW and are expected to be in service by summer of 2026.MW. This includes approximately 310285 MW of additional capacity under the Community Solar Act which will allow PNM to provide customers thean additional option of accessing solar energy. In addition, PNM has filed an application with the NMPRC seeking approval of resources to be available for the 2028 summer peak, which are necessary for PNM to meet forecasted peak load requirements to serve its customers and to continue progress towards a carbon-free generating portfolio. For additional discussion of the ETA, the 2026 Resource Application, and the 2028 Resource Application see Notes 16 and 17.

Added

PNM will continue to seek approval to procure renewable resources as needed to meet forecasted peak load requirements to serve its customers and New Mexico’s RPS and carbon-free resource requirements, while balancing the impact to customers’ electricity costs.

Removed

PNM will continue to procure renewable resources while balancing the impact to customers’ electricity costs in order to meet New Mexico’s escalating RPS and carbon-free resource requirements.

Reworded

Energy efficiency plays a significant role in helping to keep customers’ electricity costs low while meeting their energy needs and is one of the Company’s approaches to supporting environmentally responsible power. PNM’s and TNMP’s energy efficiency and load management portfolios continue to achieve robust results. In 2024,2025, incremental energy saved as a result of new participation in PNM’s portfolio of energy efficiency programs is estimated to be 8684 GWh. This is equivalent to the annual consumption of approximately 11,89111,639 homes in PNM’s service territory. PNM’s load management and annual energy efficiency programs also help lower peak demand requirements. In 2024,2025, TNMP’s incremental energy saved as a result of new participation in TNMP’s energy efficiency programs is estimated to be approximately 1620 GWh. This is equivalent to the annual consumption of approximately 2,2112,762 homes’ electricity usehomes in TNMP’s service territoryterritory, estimated using a national average avoided emissions rate. TNMP’s high-performance homes residential new construction energy efficiency program has earned the Energy Star Partner of the Year award for 8 years, including 6 years receiving the Sustained Excellence Award, recognizing long-term commitment to fighting climate change and protecting public health through energy efficiency. For information on PNM’s and TNMP’s energy efficiency filing with the NMPRC and PUCT see Note 17.

Reworded

PNM continues to make progress in its efforts to reduce the amount of fresh water used to make electricity (about 45% more efficient than in 2005).electricity. Continued growth in PNM’s fleet of solar and wind energy sources,resources, energy efficiency programs, and innovative uses of air-cooling technology have contributed to this reduction. Water usage has continued to decline as PNM has substituted less fresh-water-intensive generation resources to replace SJGS. As the Company moves forward with its mission to achieve 100% carbon-free generation by 2040,generation, it expects that more significant water savings will be gained. Shutting down SJGS in 2022 and Four Corners in 2031 will allow the Company to reach our goals for reduced freshwater use at 80% by 2035 and 90% by 2040 from 2005 levels. Focusing on responsible stewardship of New Mexico’s scarce water resources improves PNM’s water-resilience in the face of persistent drought and ever-increasing demands for water to spur the growth of New Mexico’s economy.

Reworded

In addition to the above areas of focus, the Company is working to reduce the amount of solid waste going to landfills through increased recycling and reduction of waste. In 2024,2025, 2118 of the Company’s 22 facilities met or exceeded the solid waste diversion goal of a 65% diversion rate. The Company expects to continue to do well in this area in the future.

Reworded

The Company utilizes a number of communications channels and strategic content to serve and engage its many stakeholders. PNM’s website provides the details of major regulatory filings, including general rate requests, as well as the background on PNM’s efforts to maintain reliability, keep prices affordable, and protect the environment. The website is also a resource for information about PNM’s operations and community outreach efforts to customers on various topics such as education, outage alerts, safety, wildfire safety, customer service, community partnerships in philanthropic projects, and plans for building a sustainable energy future for New Mexico and to transition to a carbon-free generating portfolio. PNM also leverages social media to communicate about some of these topics with certain customers. TNMP’s website provides information on customized energy efficiency programs and TNMP rates, in addition to other community outreach information. The Company’s website is also a resource for information about PNM’s operations and community outreach efforts, including plans for building a sustainable energy future for New Mexico and to transition to a carbon-free generating portfolio by 2040. PNM also leverages social media in communications with customers on various topics such as education, outage alerts, safety, customer service, and PNM’s community partnerships in philanthropic projects. As discussed above, TXNM’s corporate website includes a dedicated section providing additional information regarding the Company’s commitment to sustainability.

Added

Throughout 2025, PNM held in-person community events focused on wildfire safety and educating customers about the PSPS process and wildfire mitigation efforts to protect the public. These gatherings are designed to share critical information, coordinate with local resources, and listen to feedback from local communities. PNM hosted four events in High Fire Risk Areas (“HFRA”) across New Mexico in 2025 and expects to host similar events in 2026. In addition, PNM included local emergency managers in its periodic meetings, referred to as “wildfire tabletops,” in 2025. Each of these engagements builds and strengthens our preparedness as a Company for wildfire prevention and response.

Reworded

TXNM has a long tradition of supporting the communities that it serves in New Mexico and Texas and is committed to fostering positive relationships with stakeholders.Texas. During the three years ended December 31, 2024,2025, TXNM, through corporate givinggiving, contributed $9.0$8.7 million to civic, educational, environmental, tribal communities,tribal, low income, and economic development organizations. Additionally, the PNM Resources Foundation (the “Foundation”) has provided an annual average of $1.3$1.2 million in grant funding over the past three years across New Mexico and Texas. Throughout 2024,2025, the Foundation has focused on grants for nontraditionalwellness pathwaysand toathletic educationactivities within the community and grants for the environment. These grants help nonprofits innovate or sustain programs to grow and develop their mission,missions, develop and implement environmental programs, and provide educational opportunities. The Foundation continues to expand its matching and volunteer grant programs and the annual amount of matching donations available to each of its employees. The Foundation has also approved an increase to the amount awarded to employees,employees through the employee crisis management fund, whowhich haveprovides beenour affectedemployees bywith thefinancial wildfires,support floodsfor basic living needs during catastrophic emergencies and hurricanes.times Inof response to the South Fork and Salt wildfires that have caused devastation in the Ruidoso and Mescalero Apache Tribe communities,crises. PNM and the Foundation have donated to the Ruidoso Fire Emergency Action Fund, hosted by the Community Foundation of Southern New Mexico and to the Mescalero Apache Tribe Tribal Relief Fund. PNM is also collaboratingcollaborated with community foundations to help support the effort and direct funds where they arewere most needed.needed Tofor supportthose ourwho teamhave membersbeen impactedaffected by Hurricane Beryl, the Foundationwildfires, hasfloods increasedand thehurricanes employeein crisissurrounding fund,communities whichin is availableaddition to helpsupporting ourlaw employees with financial support for catastrophic emergenciesenforcement and basicfirst living needs during times of crises.responders.

Reworded

PNM stands out as one of the few investor-owned utilities dedicated to operating a tribal relations office, which is focused on serving and collaborating with 18 of the 23 sovereign nations in New Mexico and the Southwest. PNM created the Navajo Nation Workforce Training Scholarship Program to provide support for Navajo tribal members and to encourage the pursuit of education and training in existing and emerging jobs in the communities in which they live. PNM has invested in paid summer college engineering internship programs for American Indian students available in the greater Albuquerque area, established the PNM Pueblo Education Scholarship and Endowment to invest in higher education for Native American Indian students, and supported the development of an entrepreneur complex located in Albuquerque and operated by the Indian Pueblo Cultural Center. PNM continues to partner with the Navajo Nation in the Light upUp Navajo project, piloted in 2019 and modeled as a mutual aid project to connect Navajo homes without electricity to the power grid. PNM is one of 44 utilities across 16 states to participate in improving the quality of life for families by bringing electricity to over 700 homes since inception of the project. PNM has also partnered with New Mexico universities to enhance intern programs and developed a business coalition model to drive economic development through intern partnerships. PNM continues to partner with key nonprofit organizations to initiate funding and action for programs focused on diversity, equity and inclusion.

Reworded

Employee volunteers are the lifeblood of a healthy corporate culture. Community giving through volunteers’ time and effort is at the heart of employee engagement. Throughout 2024,2025, the Company held large-scale volunteer events, working alongside nonprofits, schools, and vulnerable communities throughout New Mexico and Texas. More than 600640 employees in both states participated in the annual “Day of ServiceService,”, a workday event encouraging employee volunteerism and serving more A - 30 than 5040 organizations. Throughout the year, employees volunteer their time generously through independent volunteer activities and board participation. Employees strengthen community resilience by giving more than 6,0004,000 volunteer hours each year to support the health, safety, and well-being of diverse communities.

Reworded

TXNM’s success in accomplishing its financial objectives is highly dependent on two key factors: fair and timely regulatory treatment for its utilities and the utilities’ strong operating performance. The Company has multiple strategies to achieve favorable regulatory treatment, all of which have as their foundation a focus on the basics: safety, operational excellence, and customer satisfaction, while engaging stakeholders to build productive relationships. Both PNM and TNMP seek cost recovery for their investments through general rate cases, periodic cost of service filings, and various rate riders. The A - 30 rates PNM and TNMP charge customers are subject to traditional rate regulation by the NMPRC, FERC, and the PUCT. Additional information about rate filings is provided in Note 17.

Reworded

Fair and timely rate treatment from regulators is crucial to PNM and TNMP in earning their allowed returns and critical for TXNM to achieve its financial objectives. TXNM believes that earning allowed returns is viewed positively by credit rating agencies and that improvements in the Company’s ratings could lower costs tofor utility customers.

Reworded

In the 2023 and 2025 Texas Legislative sessionsessions several bills were passed to support utility reliability and resiliency by encouraging and protecting utility infrastructure investments. Amongst the bills passed was DCRF legislation that adds a second filing per year and shortens the regulatory timeframe for the proceedings. Under the new legislation, TNMP filed its 2025-2027 SRP in August 2024 and has filed an unopposed settlement with the PUCT.PUCT Inin addition,December there is a bill related to temporary mobile generation which are power generating resources2024 that canwas beapproved positionedwith toslight temporarilymodifications providein electricityMarch to consumers during an emergency. In December 2024, the PUCT adopted rules to protect consumers by introducing new requirements for utilities that lease and deploy mobile generation facilities.2025. Another bill directsdirected ERCOT to develop reliability plans for the Permian Basin which could resultresulted in the need for additional investments in the West Texas service territory. Additionally,In 2025, HB 5247 was passed, which streamlines cost recovery for certain utilities, including TNMP, who continue to invest in the DamagingPermian CriticalBasin Infrastructureterritory. BillHB helps5247 protectallows TNMP’sfor the offset of depreciation, property tax expenses, and carrying costs with alternative revenue, and recognition of a regulatory asset for qualifying investments that are not currently reflected in responserates, until such time a single, annual proceeding can be filed to criminaladjust offensesnon-fuel damaging critical infrastructure facilities.rates. These pieces of legislation demonstrate that Texas continues to encourage utility investment and prioritizes timely rate recovery. TNMP will look to prioritize investments aligned with these measures that improve the quality of service for current and future customers.

Reworded

TheBeyond legislative actions, the regulatory framework in Texas strongly encourages investments into the grid by providing timely recovery through rate mechanisms outside of general rate cases. The PUCT has approved mechanisms that allow TNMP to recover capital invested in transmission and distribution projects without having to file a general rate case. The PUCT also approved rate riders that allow TNMP to recover amounts related to energy efficiency and third-party transmission costs. TNMP also has approximately 277,000282,000 advanced meters across its service territory, the costs of which are being recovered through base rates.

Added

TNMP Base Rate Review

Added

In November 2025, TNMP filed the TNMP Base Rate Review with the PUCT, requesting recovery of $2.8 billion of rate base, a requested ROE of 10.4%, and a 47.54% equity ratio. The TNMP Base Rate Review also includes increases in operations and maintenance expenses that are not recovered through semi-annual TCOS and DCRF filings, excludes increases in interest expense resulting from refinancing of debt associated with the proposed Merger, and requests recovery of $20.5 million associated with Hurricane Beryl restoration costs over a five-year period. If approved by the PUCT, the new rates are expected to become effective in mid-2026. See Note 17.

Added

The 2025 New Mexico Legislative session included several bills that were passed to support economic development, clean energy, grid modernization, and wildfire preparedness. Amongst the bills passed were companion bills: New Mexico Senate Bill 169 (the “Site Readiness Bill”) and New Mexico Senate Bill 170 (the “Power Readiness Bill”).

Added

The Site Readiness Bill creates a dedicated funding mechanism and a structured process for identifying, assessing, and preparing strategic economic development sites across the state, designed to position New Mexico to compete with other states actively investing in site readiness. It appropriates approximately $24 million for the site readiness fund for site-characterization studies of proposed economic development sites and site preparations of strategic economic development sites. The Site Readiness Bill also creates the Strategic Economic Development Site Advisory Committee to advise the New Mexico Economic Development Department (“NMEDD”) in selecting sites and awarding funding. The Power Readiness Bill is A - 31 intended to reduce risk, lead times, and regulatory uncertainty in acquiring additional generation resources and in building large-scale infrastructure needed to competitively serve economic development customers that create jobs. It allows a public utility to annually increase generation capacity by up to 10% of the public utility’s total system peak load. The Power Readiness Bill also shortens the time for regulatory approval of CCN filings for new, major infrastructure and allows a public utility to defer costs of economic development projects, placing them into a regulatory asset until a customer signs a contract or begins taking service. In December 2025, PNM filed an application for approval of two projects under the Power Readiness Bill; the Westpointe and Mesa Del Sol Substations (See Note 17).

Reworded

The New Mexico Energy Transition Act (“ETA”)

Reworded

The passage of the ETA requiresamended the REA to require utilities operating in New Mexico to have renewable portfolios equal to 40% by 2025, 50% by 2030, 80% by 2040, and 100% zero-carbon energy by 2045. TheThose ETAamendments also allowsallow for the recovery of undepreciated investments and decommissioning costs related to qualifying EGUs that the NMPRC has required be removed from retail jurisdictional rates, provided replacement resources to be included in retail rates have lower or zero-carbon emissions. The ETA provides for a transition from fossil-fueled generating resources to renewable and other carbon-free resources by allowing utilities to issue Securitized Bonds related to the retirement of certain coal-fired generating facilities to qualified investors. See additional discussion of the ETA in Notes 16 and 17 and the issuance of the ETBC I Securitized Bonds in Note 7.

Removed

Grid Modernization Plan

Showing the first 60 of 174 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

What changed in the latest 10-Q

Comparing 10-Q filed 2026-07-31 (period ending 2026-06-30) with 10-Q filed 2026-05-01 (period ending 2026-03-31).

Risk Factors (10-Q Part II, Item 1A)

0new paragraphs
0removed paragraphs
0reworded paragraphs
41 → 41words in section

The section in the latest 10-Q reads in full:

As of the date of this report, there have been no material changes with regard to the Risk Factors disclosed in TXNM’s, PNM’s, and TNMP’s Annual Reports on Form 10-K for the year ended December 31, 2025.

No wording changes found in this section.

Full comparison: every changed paragraph (0)

Green = added, red = removed. Unchanged paragraphs and tables are not shown. Read the complete text in the original filing.

Management's Discussion & Analysis (MD&A) (10-Q Part I, Item 2)

10new paragraphs
4removed paragraphs
44reworded paragraphs
16,364 → 16,971words in section

New heading “Operating Results – Six Months Ended June 30, 2026 compared to 2025”

New heading “Operating Results – Six Months Ended June 30, 2026 compared to 2025”

New heading “Operating Results – Six Months Ended June 30, 2026 compared to 2025”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

New text
“Operating Results – Six Months Ended June 30, 2026 compared to 2025”
see in full comparison
New text
“Operating Results – Six Months Ended June 30, 2026 compared to 2025”
see in full comparison
New text
“Operating Results – Six Months Ended June 30, 2026 compared to 2025”
see in full comparison
New text topics: fine
“In July 2026, PUCT adopted a rule requiring utilities that own or operate power transmission or distribution facilities in wildfire risk areas, as defined by the Texas Division of Emergency Management to prepare and submit a wildfire mitigation plan (“WMP”) for approval. TNMP has filed a notice of intent to prepare and submit its WMP for approval on or before September 30, 2026.”
see in full comparison
New text
“On July 17, 2026, TXNM entered into the TXNM 2026 Delayed-Draw Term Loan between TXNM and Wells Fargo Bank, National Association, as administrative agent. Draws on the TXNM 2026 Delayed-Draw Term Loan bear interest at a variable rate, and mature on January 17, 2029. …”
see in full comparison
Reworded

Paragraph as it now reads, with added and removed wording marked:

PNM – In the three and six months ended MarchJune 31,30, 2026, PNM experienced an increase of 1.3% and a decrease of 2.9%0.8% in weather normalized residential load andcompared ato decrease2025. of 3.0% in weatherWeather normalized commercial load comparedincreased to1.5% 2025.and PNMdecreased experienced an increase in industrial load of 3.5%0.7% in the three and six months ended MarchJune 31,30, 2026 compared to 2025. Industrial load increased 5.5% and 4.5% in the three and six months ended June 30, 2026 compared to 2025.
see in full comparison
Full comparison: every changed paragraph (58)

Green = added, red = removed. Unchanged paragraphs, 8 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

The proposed Merger has been unanimously approved by the Board and was approved by the TXNM shareholders at a special meeting held on August 28, 2025. The waiting period under the HSR Act in connection with the Merger has expired without any objections or concerns having been raised, both the FCC and FERC approved the application, and the PUCT approved the unanimous settlement, satisfying four of the conditions to closing of the Merger Agreement. Consummation of the Merger remains subject to the satisfaction or waiver of certain customary conditions, including, without limitation, no Legal Restraint, and the receipt of certain required regulatory approvals (including the NMPRC and the NRC). TXNM has filed applications for regulatory approval of the Merger with the NMPRC (Note 12) and NRC. The Merger Agreement does not contain any financing condition and is currently expected to close in the secondfirst half of 2026.2027.

Reworded

PNM participates in the EIM, a real-time wholesale energy trading market operated by the CAISO, that enables participating electric utilities to buy and sell energy. The EIM aggregates the variability of electricity generation and load for multiple balancing authority areas and utility jurisdictions. In addition, the EIM facilitates greater integration of renewable resources through the aggregation of flexible resources by capturing diversity benefits from the expanding geographic footprint and the expanded potential uses for those resources. The NMPRC approved collection of PNM’s regulatory asset to recover the initial capital investments and implementation and ongoing costs necessary to participate in the EIM in the 2024 Rate Change final order. PNM passes the cost savings achieved by participating in the EIM through to customers under PNM’s FPPAC. PNM also plans to join the EDAM, which is a voluntary day-ahead regional market that expands on CAISO’s EIM market, as early as 2027.

Reworded

Investments at TNMP support the continued high growth across each region of its service territory. Economic growth across Texas continues to push the demands on TNMP’s system to new levels, including a new system peak in SeptemberJuly 2025.2026. In 2023, the Texas legislature passed a series of bills aimed at encouraging investments to enhance grid reliability and resilience, while the PUCT continues to develop rules in support of new legislation. TNMP will continue to submit filings for recovery of its investments, in accordance with these new rules, in addition to the existing rate recovery mechanisms. See the subheading under State Regulation and Legislation below.

Reworded

Investments at PNM are aimed at supporting economic development and advancing the infrastructure beyond its original architecture to a more flexible and redundant system accommodating growing amounts of intermittent and distributed generation resources and integrating evolving technologies that provide long-term customer value. New Mexico’s clean energy future depends on a reliable, resilient, secure grid to deliver an evolving mix of energy resources to customers. TheMore recently, the 2029-2032 Resource portfolio application filed with the NMPRC is an integrated package of resources designed to ensure that PNM continues to provide safe, reliable, and cost-effective electric service while meeting anticipated load growth, including a new system peak in July 2026, and supporting the clean energy transition under New Mexico’s ETA. In addition, the CCN requesting approval of a new transmission line and the recent approval received to defer costs of two economic development projects filed under SB 170 support economic development in New Mexico. Similarly, projects included in the Grid Modernization Plan will improve customers’ ability to customize their use of energy and modernize PNM’s electric grid through infrastructure and technology improvements.

Reworded

PNM, as a vertically integrated utility in New Mexico, is focused on providing customers reliable, affordable and clean energy. PNM holds in-person engagements with residential and business customers through customer advisory councils to receive feedback on the programs and services offered. Additionally, PNM continues to focus its efforts on customer service improvements, including enhanced digital payment options, strategic customer outreach, and improved communications. To supplement its service, PNM has implemented programs regulated by the NMPRC to incentivize customers to address these issues through rebates and/or discounts, including Energy Efficiency, Transportation Electrification, Community Solar, and Time-of_DayTime-of-Day pilot Programs. Increased incentives are provided to low-income customers to further encourage participation from households typically experiencing a higher energy burden. Additionally, PNM offers customer bill payment assistance through PNM Good Neighbor Fund and accepts employee and customer donations to supplement this fund. As a result of PNM’s efforts, 1,7512,608 families in need received emergency assistance through the PNM Good Neighbor Fund for the threesix months ended MarchJune 31,30, 2026.

Reworded

PNM participates in the National Electric Highway Coalition, which plans to build fast-charging ports along major U.S. travel corridors. The coalition, with approximately 50 investor-owned electric companies, is committed to providing EV fast charging ports that will allow the public to drive EVs with confidence throughout the country’s major roadways. To support this initiative, PNM’s TEP program includes the installation of a charging network along major roadways in New Mexico. PNM is in process of developingfiled its 2027-2029 TEP andwith expectsthe to file itNMPRC on or before June 1, 2026.

Reworded

PNM’s utility-owned solar and energy storage capacity, as well as solar, energy storage, wind, and geothermal procurements from facilities in service as of MarchJune 31,30, 2026, have a total net generation capacity of 3,3493,409 MW. In addition to PNM’s owned and third-party contracted solar facilities, PNM also has a customer distributed solar generation program that represented 378.0387.4 MW at MarchJune 31,30, 2026. The NMPRC has approved plans for PNM to procure energy and RECs from additional resources to serve retail customers and a data center located in PNM’s service territory. PNM’s approved resources have a generation capacity of 1,3481,318 MW. This includes approximately 280 MW of additional capacity under the Community Solar Act which will provide customers an additional option of accessing solar energy.

Reworded

Energy efficiency plays a significant role in helping to keep customers’ electricity costs low while meeting their energy needs and is one of the Company’s approaches to supporting environmentally responsible power. PNM’s and TNMP’s energy efficiency and load management portfolios continue to achieve robust results. In 2026, incremental energy saved as a result of participation in PNM’s portfolio of energy efficiency programs is estimated to be 87 GWh. This is equivalent to the annual consumption of approximately 12,056 homes in PNM’s service territory. PNM’s load management and energy efficiency programs also help lower peak demand requirements. In 2026, TNMP’s incremental energy saved as a result of participation in TNMP’s energy efficiency programs is estimated to be approximately 17 GWh. This is equivalent to the annual consumption of approximately 2,392 homes in TNMP’s service territory, estimated using a national average avoided emissions rate. TNMP’s high-performance homes residential new construction energy efficiency program has earned the Energy Star Partner of the Year award for 8 years, including 6 years receiving the Sustained Excellence Award, recognizing long-term commitment to fighting climate change and protecting public health through energy efficiency. In April 2026, PNM filed an application with the NMPRC for its energy efficiency and load management programs to be offered in its 2027 Plan (Note 12). In May 2026, TNMP filed its annual request with the PUCT to adjust its EECRF for changes in costs for 2027 (Note 12).

Added

In July 2026, PUCT adopted a rule requiring utilities that own or operate power transmission or distribution facilities in wildfire risk areas, as defined by the Texas Division of Emergency Management to prepare and submit a wildfire mitigation plan (“WMP”) for approval. TNMP has filed a notice of intent to prepare and submit its WMP for approval on or before September 30, 2026.

Reworded

In the 2023 and 2025 Texas Legislative sessions several bills were passed to support utility reliability and resiliency by encouraging and protecting utility infrastructure investments. Under the new legislation, TNMP filed its 2025-2027 SRP in August 2024 and filed an unopposed settlement with the PUCT in December 2024 that was approved with slight modifications in March 2025. AnotherOther billbills directed ERCOT to develop reliability plans for the Permian Basin which resulted in the need for additional investments in the West Texas service territory.territory and to establish standards for interconnecting large load customers in the region. In 2025, HB 5247 was passed, which immediately authorized certain utilities, including TNMP, to offset depreciation, property tax expenses, and carrying costs with alternative revenue and recognize a regulatory asset for qualifying investments that are not currently reflected in rates, until the following year in which they would file a single, annual proceeding with the PUCT. In February 2026, PUCT adopted a rule to ensure the power demands of large load customers of 75 MW or more, be incorporated into ERCOT’s Regional Transmission Plan and resource adequacy assessments. These pieces of legislation demonstrate that Texas continues to encourage utility investment and prioritizes timely rate recovery. TNMP will look to prioritize investments aligned with these measures that improve the quality of service for current and future customers and anticipates submitting annual filings in accordance with the rule.

Reworded

In November 2025, TNMP filed the TNMP Base Rate Review with the PUCT, requesting recovery of $2.8 billion of rate base, a requested ROE of 10.4%, and a 47.54% equity ratio. The TNMP Base Rate Review also includes increases in operations and maintenance expenses that are not recovered through semi-annual TCOS and DCRF filings, excludes increases in interest expense resulting from refinancing of debt associated with the proposed Merger, and requests recovery of $20.5 million associated with Hurricane Beryl restoration costs over a five-year period. If approved by the PUCT, the new rates are expected to become effective in mid-2026. TheOn partiesMay are29, presently2026, conferringTNMP regardingfiled an unopposed stipulation and settlement agreement with the PUCT that was approved in a potentialFinal settlementOrder inissued theon proceeding.July 30, 2026. See Note 12.

Reworded

The 2025 New Mexico Legislative session included several bills that were passed to support economic development, clean energy, grid modernization, and wildfire preparedness. AmongstAmong the bills passed were companion bills: New Mexico Senate Bill 169 (the “Site Readiness Bill”) and New Mexico Senate Bill 170 (the “Power Readiness Bill”).

Reworded

The passage of the ETA amended the REA to require utilities operating in New Mexico to have renewable portfolios equal to 50% by 2030, 80% by 2040, and 100% zero-carbon energy by 2045. Those amendments also allow for the recovery of undepreciated investments and decommissioning costs related to qualifying EGUs that the NMPRC has required be removed from retail jurisdictional rates, provided replacement resources to be included in retail rates have lower or zero-carbon emissions. The ETA provides for a transition from fossil-fueled generating resources to renewable and other carbon-free resources by allowing utilities to issue Securitized Bonds related to the retirement of certain coal-fired generating facilities to qualified investors. See additional discussion of the ETA in Notes 16 and 17 of the Notes to Consolidated Financial Statements in the 2025 Annual Reports on Form 10-K and the issuance of the ETBC I Securitized Bonds in Note 7 of the Notes to Consolidated Financial Statements in the 2025 Annual Reports on Form 10-K.

Reworded

In December 2024, PNM issued its 2029-2032 RFP for at least 900 MW of new energy resources to come online between 2029 and 2032, with at least 500 MW needed by 2030, and is anticipated to identify potential replacement resources for PNM’s current natural gas generation capacity as well as PNM’s ownership interest in Four Corners. In MarchMay 2026, PNM filed a draft supplementalits 2029-2032 RFPResource forPortfolio Application with the NMPRC, requesting 1,650 MW of new customerenergy requirements that have acceleratedresources and increasedits energyabandonment demandsand beyondexit previouslyof forecastedits resources.ownership interest in Four Corners in 2031. See Note 12.

Reworded

TXNM’s financial objective to deliver long-term earnings growthgrowth, enables investors to realize the value of their investment in the Company’s business. Earnings growth is based on ongoing earnings, which is a non-GAAP financial measure that excludes from GAAP earnings certain non-recurring, infrequent, and other items that are not indicative of fundamental changes in the earnings capacity of the Company’s operations. TXNM uses ongoing earnings to evaluate the operations of the Company and to establish goals, including those used for certain aspects of incentive compensation, for management and employees.

Reworded

TNMP – In the three and six months ended MarchJune 31,30, 20262026, TNMP experienced aan decreaseincrease in volumetric weather normalized retail load of 2.0%4.3% and 1.4% compared to 2025. Weather normalized demand-based load, excluding retail transmission consumers, increased 3.2%5.8% and 4.5% in the three and six months ended MarchJune 31,30, 2026, compared to 2025. Data center load, including distribution and transmission, has decreased 18.6%24.6% and 21.4% in the three and six months ended MarchJune 31,30, 2026 compared to 2025.

Reworded

PNM – In the three and six months ended MarchJune 31,30, 2026, PNM experienced an increase of 1.3% and a decrease of 2.9%0.8% in weather normalized residential load andcompared ato decrease2025. of 3.0% in weatherWeather normalized commercial load comparedincreased to1.5% 2025.and PNMdecreased experienced an increase in industrial load of 3.5%0.7% in the three and six months ended MarchJune 31,30, 2026 compared to 2025. Industrial load increased 5.5% and 4.5% in the three and six months ended June 30, 2026 compared to 2025.

Reworded

The Company is closely monitoring the impacts on the capital markets of various macroeconomic conditions, including actions by the Federal Reserve to address inflationary concerns or other market conditions, and geopolitical activity, including the potential impacts of tariffs.activity. The Company has not experienced, nor does it expect to experience significant negative impacts to customer usage at PNM and TNMP resulting from these economic impacts. However, if current economic conditions worsen, the Company may be required to implement additional measures such as reducing or delaying operating and maintenance expenses and planned capital expenditures.

Reworded

Net earnings attributable to TXNM were $3.7$75.0 million, or $0.03$0.67 per diluted share, in the threesix months ended MarchJune 31,30, 20262026, compared to $8.9$30.5 million, or $0.10$0.32 per diluted share, in 2025. Among other things, earnings in the threesix months ended MarchJune 31,30, 2026, benefited from higher transmission and distribution rates at TNMP, impacts of revenues recorded under HB 5247 at TNMP, increased revenue at PNM approved in the 2025 Rate Change, and higher transmission margin at PNM. These increases were more thanpartially offset by higher operating expenses at PNM and TNMP, increased depreciation, property taxes, and interest expense at PNM and TNMP due to increased plant in service, capacity arrangements at PNM, milder weather at PNM and TNMP, and decreased performance of investmentsinvestment securities in the NDT and coal mine reclamation trusts at PNM. Additional information on factors impacting results of operations for each segment is discussed below under Results of Operations.

Reworded

As of MarchJune 31,30, 2026, TXNM, PNM, and TNMP had revolving credit facilities with capacities of $300.0 million, $440.0 million, and $300.0 million. Total availability for TXNM on a consolidated basis was $742.0$512.9 million at AprilJuly 24, 2026. The Company utilizes thesethe revolving credit facilities and notes outstanding under the commercial paper program that are backed by the revolving credit facilities, except the PNM New Mexico Credit Facility, and cash flows from operations to provide funds for both construction and operational expenditures. TXNM also has intercompany loan agreements with each of its subsidiaries.

Reworded

TXNM projects that its consolidated capital requirements, consisting of construction expenditures and dividends, will total $11.1 billion for 2026 - 2030, including amounts expended through MarchJune 31,30, 2026. These construction expenditures may change due to incremental expenditures for new customer growth and other transmission and renewable energy expansion. TNMP’s investments support continued high growth in system demand across TNMP’s service territories and growing encouragement for infrastructure investments from the Texas legislature to support grid reliability and resilience. PNM’s capital initiatives include investments in generation, transmission, and distribution infrastructure to deliver clean energy, support customer growth, enhance customer satisfaction, and increase grid resilience. Construction expenditures also include investments proposed in PNM’s Grid Modernization Plan and TNMP’s SRP.

Reworded

To fund capital spending requirements to meet growth that balances earnings goals, credit metrics, and liquidity needs, the Company has entered into a number of other financing arrangements. A complete listing of currentoutstanding financing arrangements is contained in Note 9 and Note 7 of the Notes to Consolidated Financial Statements in the 2025 Annual Reports on Form 10-K.10-K and details for current financing activity is contained in Note 9.

Reworded

After considering the effects of these financings and the Company’s short-term liquidity position as of AprilJuly 24, 2026, the Company has consolidated maturities of long-term and short-term debt aggregating approximately $597.7$751.8 million through AprilJuly 2027. In addition to internal cash generation, the Company anticipates that it will be necessary to obtain additional long-term financing in the form of debt refinancing, new debt issuances, and/or new equity, including those provided for under the Merger Agreement, in order to fund its capital requirements during the 2026-2030 period. The Company currently believes that its internal cash generation, existing credit arrangements, and access to public and private capital markets will provide sufficient resources to meet the Company’s capital requirements for at least the next twelve months. As of MarchJune 31,30, 2026 and AprilJuly 24, 2026, the Company was in compliance with its debt covenants.

Reworded

TNMP defines utility margin as electric operating revenues less cost of energy, which consists of costs charged by third-party transmission providers. TNMP believes that utility margin provides a more meaningful basis for evaluating operations than electric operating revenues since all third-party transmission costs are passed on to consumers through a transmission cost recovery factor. Utility margin is not a financial measure required to be presented and is considered a non-GAAP measure. TNMP does not intend for utility margin to represent any financial measure as defined by GAAP; however, the calculation of utility margin, as presented, most closely compares to gross margin as defined by GAAP. Reconciliations between utility margin and gross margin are presented below.

Reworded

Operating Results – Three Months Ended MarchJune 31,30, 2026, compared to 2025

Added

The following tables summarize the primary drivers for changes in operating expenses, depreciation and amortization, other income (deductions), interest charges, and income taxes:

Added

Operating Results – Six Months Ended June 30, 2026 compared to 2025

Removed

The following table summarizes the significant changes to gross margin:

Removed

The following table summarizes the significant changes to utility margin:

Reworded

Operating Results – Three Months Ended MarchJune 31,30, 2026, compared to 2025

Added

The following tables summarize the primary drivers for changes in operating expenses, depreciation and amortization, other income (deductions), interest charges, and income taxes:

Added

Operating Results – Six Months Ended June 30, 2026 compared to 2025

Removed

The following table summarizes the significant changes to gross margin:

Removed

The following table summarizes the significant changes to utility margin:

Reworded

Corporate and Other operating expenses shown above are net of amounts allocated to PNM and TNMP under shared services agreements. The amounts allocated include certain expenses shown as depreciation and amortization and other income (deductions) in the table above. The change in operating expense for the three and six months ended MarchJune 31,30, 20262026, includes decreases of $0.8$10.6 million and $11.4 million for costs related to the Merger. Substantially all depreciation and amortization expense is offset in operating expenses as a result of allocation of these costs to other business segments.

Reworded

Operating Results – Three Months Ended MarchJune 31,30, 2026 compared to 2025

Added

The following tables summarize the primary drivers for changes in other income (deductions), interest charges, and income taxes:

Added

Operating Results – Six Months Ended June 30, 2026 compared to 2025

Reworded

The changes in TXNM’s cash flows for the threesix months ended MarchJune 31,30, 2026, compared to MarchJune 31,30, 2025, are summarized as follows:

Reworded

Beginning on March 3, 2026, TXNM, pursuantPursuant to the TXNM 2026 ATM Program, TXNM sold an aggregate of 1,785,9012,123,544 shares of TXNM common stock under the Distribution Agreement for net cash proceeds of $104.0$123.7 million. TXNM used the proceeds to pay cash equity contributions to PNM and for other corporate purposes. See Note 9.

Reworded

On May 1, 2026, TXNM, PNM, and TNMP each established Programs pursuant to which they may issue, from time to time, Notes under the exemption from registration contained in Section 4(a)(2) of the Securities Act. Amounts available under the Programs may be borrowed, repaid and re-borrowed from time to time, with the aggregate face or principal amount of the Notes outstanding under the Programs at any time not to exceed $300.0 million for TXNM, $400.0 million for PNM, and $300.0 million for TNMP. The Notes will have maturities of up to 364 days from the date of issue and net proceeds will be used for general corporate purposes. Each of TXNM, PNM and TNMP have agreed to maintain, at all times, unused available borrowing capacity under their Revolvingrespective revolving credit agreements (except for the PNM New Mexico Credit AgreementsAgreement) in an amount at least equal to the amount of Notes outstanding at any time. No Notes are currently outstanding under the Programs.Programs as of June 30, 2026 are $44.1 million for TXNM, zero for PNM, and $15.0 million for TNMP.

Added

On July 17, 2026, TXNM entered into the TXNM 2026 Delayed-Draw Term Loan between TXNM and Wells Fargo Bank, National Association, as administrative agent. Draws on the TXNM 2026 Delayed-Draw Term Loan bear interest at a variable rate, and mature on January 17, 2029. TXNM drew the full amount available under the TXNM 2026 Delayed-Draw Term Loan on July 22, 2026, and used such amount to fully repay the $400.0 million previously received under the May 2025 Stock Purchase Agreement in connection with unwinding the transaction as a result of the NMPRC’s Final Order issued in the show cause matter (Note 12).

Added

On July 21, 2026, PNM entered into the PNM 2026 Term Loan, among PNM, the lenders party thereto and Canadian Imperial Bank of Commerce, New York Branch, as administrative agent. PNM used the proceeds of the PNM 2026 Term Loan to repay borrowings under the PNM 2025 Term Loan which matured on July 21, 2026.

Reworded

Projected capital requirements, including amounts expended through MarchJune 31,30, 2026, are:

Reworded

During the threesix months ended MarchJune 31,30, 2026, TXNM met its capital requirements and construction expenditures through cash generated from operations, as well as its liquidity arrangements and the borrowings discussed in Financing Activities above.

Reworded

In addition to the capital requirements for construction expenditures and dividends, the Company has long-term debt and term loans that must be paid or refinanced at maturity. PNM has $3.7 million and $3.8 million in scheduled principal payments due for the ETBC I Securitized Bonds in August 2026 and February 2027. PNM also has $195.0 million under the PNM 2025 Term Loan due in July 2026, and $100.3 million of 0.875% PCRBs outstanding with a mandatory tender date of October 1, 2026.2026, and $120.0 million under the PNM November 2025 Term Loan due in May 2027. See Note 7 of the Notes to Consolidated Financial Statements in the 2025 Annual Reports on Form 10-K and Note 9 for additional information about the Company’s long-term debt and equity arrangements. The Company may also enter into new arrangements similar to the existing agreements, borrow under the revolving credit facilities, or issue new long-term debt or equity in the public or private capital markets, or a combination of these sources. The Company has from time to time refinanced or repurchased portions of its outstanding debt before scheduled maturity. Depending on market conditions, the Company may refinance other debt issuances or make additional debt repurchases in the future.

Reworded

The revolving credit facilities and the PNM New Mexico Credit Facility provide short-term borrowing capacity. The revolving credit facilities also allow letters of credit to be issued. Letters of credit reduce the available capacity under the facilities. The Company may also issue Notes under the Commercial Paper Programs, further reducing the available capacity under each facility, except the PNM New Mexico Credit Facility. The Company utilizes these credit facilitiesfacilities, Notes, and cash flows from operations to provide funds for both construction and operational expenditures. The Company’s business is seasonal with more revenues and cash flows from operations being generated in the summer months. In general, the Company may utilize Notes issued under its Commercial Paper Programs and relies on the credit facilities to be the initial funding source for construction expenditures. Accordingly, borrowings under the facilities may increase over time. Depending on market and other conditions, the Company will periodically issue equity or long-term debt and use the proceeds to reduce the borrowings under the credit facilities or refinance other debt. Information regarding the range of borrowings for each facility is as follows:

Added

Information regarding the range of borrowings for each facility is as follows:

Reworded

At MarchJune 31,30, 2026, the weighted average interest rates on borrowings outstanding were 4.93%4.90% for the PNM Revolving Credit Facility, 5.03%5.00% for the PNM New Mexico Credit Facility, 4.54%4.52% for the TNMP Revolving Credit Facility, and4.10% 5.17%for the TNMP Commercial Paper Notes, 5.15% for the TXNM Revolving Credit Facility.Facility, and 4.19% for the TXNM Commercial Paper Notes. There were no Notes outstanding under the PNM Commercial Paper Programs as of June 30, 2026.

Reworded

As of AprilJuly 24, 2026, ratings on the Company’s securities were as follows:

Reworded

In its May 2025 credit opinion, S&P commented that theyit viewviews the transactionproposed Merger as credit supportive. S&P commented on the Final Order in the show cause proceeding in a July 2026 research report indicating that the resulting delay in the closing of the proposed Merger is a negative development but it does not immediately impact its ratings, as the impact on credit measures is viewed as temporary. In its June 2025 credit opinion, Moody’s commented that the announced terms of the proposed Merger are not expected to adversely affect the ratings or outlooks of TXNM or its two utility subsidiaries. Investors are cautioned that a security rating is not a recommendation to buy, sell, or hold securities, that each rating is subject to revision or withdrawal at any time by the rating organization, and that each rating should be evaluated independently of any other rating.

Reworded

A summary of liquidity arrangements as of AprilJuly 24, 2026, is as follows:

Reworded

In addition to the above, TXNM has $19.3$20.2 million of letters of credit issued under the WFB LOC Facility. See Note 9.issued. The above table excludes intercompany debt. As of AprilJuly 24, 2026, PNM and TNMP had $1.2$46.3 million and zero$0 in borrowings from TXNM under their respective intercompany loan agreements. The remaining availability under the revolving credit facilities at any point in time varies based on a number of factors, including the timing of collections of accounts receivables and payments for construction and operating expenditures.

Reworded

1 TXNM’s long-term debt as of March 31, 2026 includes Convertible Notes, which receive 50% equity credit from ratings organizations.

Reworded

As of MarchJune 31,30, 2026, approximately 25% of PNM’s generating capacity, including resources owned, leased, or under PPAs, all of which is located within the U.S., consisted of coal or gas-fired generation that produces GHG emissions. As PNM shifts its generation to cleaner energy resources, the Company’s output of GHG emissions continues to decrease. Many factors affect the amount of GHG emitted, including total electricity sales, plant performance, economic dispatch, and the availability of renewable resources. For example, wind generation performance varies each year as a result of highly seasonal wind patterns and annual wind resource variability. Similarly, if PVNGS experienced prolonged outages or if PNM’s entitlement from PVNGS were reduced, PNM might be required to utilize other power supply resources such as gas-fired generation, which could increase GHG emissions.

Reworded

PNM’s utility-owned solar and energy storage capacity, as well as solar, energy storage, wind, and geothermal procurements in service as of MarchJune 31,30, 2026, have a total net generation capacity of 3,3493,409 MW. The NMPRC has approved plans for PNM to procure energy and RECs from additional resources to serve retail customers and a data center located in PNM’s service territory. PNM’s approved resource plans have a generation capacity of 1,3481,318 MW. This includes approximately 280 MW of capacity under the Community Solar Act which will provide customers an additional option of accessing solar energy. PNM will continue to seek approval to procure renewable resources as needed to meet forecasted peak load requirements to serve its customers and New Mexico’s RPS and carbon-free resource requirements, while balancing the impact to customers’ electricity costs.

Reworded

PNM also has a customer distributed solar generation program that represented 378.0387.4 MW at MarchJune 31,30, 2026. PNM’s distributed solar programs will generate an estimated 756.0774.8 GWh of emission-free solar energy available this year to offset PNM’s annual production from fossil-fueled electricity generation. PNM has offered its customers a comprehensive portfolio of energy efficiency and load management programs since 2007. PNM’s cumulative savings from these programs were an estimated 9,008 GWh of electricity through 2025. Over the next 20 years, PNM projects energy efficiency and load management programs will provide the equivalent of approximately 12,900 GWh of electricity savings, which will avoid approximately 220,000 tons of CO2 based upon projected emissions from PNM’s portfolio of resources. These estimates are subject to change because of the uncertainty of many of the underlying variables, including changes in PNM’s generation portfolio, demand for electricity, energy efficiency, and complex relationships between those variables.

Reworded

As of MarchJune 31,30, 2026, there have been no significant changes with regard to the critical accounting policies disclosed in TXNM’s, PNM’s, and TNMP’s 2025 Annual Reports on Forms 10-K. The policies disclosed included regulatory accounting, impairments, decommissioning and reclamation costs, pension and other postretirement benefits, accounting for contingencies, and income taxes.

TXNM insider buying and selling (Form 4)

Since 2026-04-11, insiders reported open-market purchases in 0 Form 4 filings and open-market sales in 0 filings. Totals add up every open-market (code P and S) line in those filings, using the prices reported in the filings. Awards, option exercises, tax withholding and gifts are listed below but not counted.

Trade dateInsiderTransactionSharesPriceValueOwned afterFiling
2026-06-10Bailey Vicky A
Director
Grant/award 2,698— —11,692 SEC
2026-06-10Maestas Steven
Director
Grant/award 2,698— —8,992 SEC
2026-06-10Gutierrez Sidney M.
Director
Grant/award 2,698— —32,135 SEC
2026-06-10Conley E Renae
Director
Grant/award 2,698— —39,971 SEC
2026-06-10Becker Norman P.
Director
Grant/award 2,698— —30,802 SEC
2026-06-10Hughes James Alton
Director
Grant/award 2,698— —22,217 SEC
2026-06-10Montoya Lillian J
Director
Grant/award 2,698— —8,992 SEC
2026-06-10Mullarkey Maureen T
Director
Grant/award 2,698— —34,487 SEC

Well-known investors holding TXNM (13F)

InvestorQuarterSharesReported value% of their 13FChange vs prior quarter
Millennium Management (Israel Englander) COM2026-06-302,470,809$140.3M0.09%Reduced 30%
Renaissance Technologies COM2026-06-30645,558$36.7M0.05%New position
Two Sigma Investments COM2026-06-30609,070$34.6M0.03%Added 85%
D. E. Shaw & Co. NOTE 5.750% 6/02026-06-300$31.8M0.02%No change
Citadel Advisors (Ken Griffin) COM2026-06-30362,001$20.6M0.01%Added 24%
Bridgewater Associates COM2026-06-3078,109$4.4M0.02%Added 4%
D. E. Shaw & Co. COM2026-06-3068,394$3.9M0.0%Reduced 88%
AQR Capital Management (Cliff Asness) COM2026-06-3055,722$3.2M0.0%Reduced 43%
Point72 Asset Management (Steve Cohen) COM2026-06-3015,048$854.4K0.0%Reduced 90%
Gotham Asset Management (Joel Greenblatt) COM2026-06-303,874$226.5K—Sold out

13F reports are filed up to 45 days after quarter end and show long U.S. equity positions only; options positions are omitted here.

Coming soon: email alerts when TXNM files, watchlists and downloadable comparisons.