Companies › VST

VST 10-K & 10-Q changes, risk factors and insider trading

Vistra Corp. · NYSE · Electric Services · CIK 1692819 · All filings on SEC.gov

Everything below is quoted or computed from Vistra Corp.'s public SEC filings. It is not a recommendation to buy or sell. Automated comparisons can contain errors; confirm with the original filing.

At a glance

19 / 16risk-factor paragraphs added / removed in latest 10-K
3new risk-factor headings
2Form 4 filings reporting open-market purchases (last 180 days)
9Form 4 filings reporting open-market sales (last 180 days)

Jump to: Annual report (10-K) · Quarterly report (10-Q) · Insider transactions · 13F holders

What changed in the latest 10-K

Comparing 10-K filed 2026-02-27 (period ending 2025-12-31) with 10-K filed 2025-02-28 (period ending 2024-12-31).

Risk Factors (10-K Item 1A)

19new paragraphs
16removed paragraphs
45reworded paragraphs
21,092 → 21,749words in section

New heading “If electricity demand does not grow at the rate expected, or if we are unable to execute on large load offtake opportunities, including under long-term power purchase or offtake agreements that we have entered into, our financial performance, growth opportunities, and stock price could be adversely impacted.”

New heading “We may not be able to consummate the Cogentrix Transactions on the anticipated terms, on the anticipated timeline, or at all, which could adversely affect our business, financial condition, results of operation and stock price.”

New heading “Following the completion of the Cogentrix Transactions, we may not realize the anticipated synergies and other expected benefits of the Cogentrix Transactions on the anticipated timeline or at all.”

Removed heading “If electricity demand does not grow at the rate expected, or if we are unable to execute on large load offtake opportunities, our financial performance, growth opportunities, and stock price could be adversely impacted.”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

Reworded topics: litigation, regulation, labor

Paragraph as it now reads, with added and removed wording marked:

There is continuing emphasis nationally and internationally on global climate change and how GHG emissions, such as CO2, contribute to global climate change. Over the last several years, the U.S. Congress has considered and debated several proposals intended to address climate change using different approaches, including a cap on carbon emissions with emitters allowed to trade unused emission allowances (cap-and-trade), a tax on carbon or GHG emissions, incentives for the development of low-carbon technology and federal renewable portfolio standards. In July 2019, the EPA finalized the ACE rule that developed emissions guidelines that states must use when developing plans to regulate GHG emissions from existing coal-fueled electric generation units. In January 2021, the ACE rule was vacated by the D.C. Circuit Court and remanded to the EPA for further consideration in accordance with the court's ruling. The D.C. Circuit Court's decision was appealed to the U.S. Supreme Court. In June 2022, the U.S. Supreme Court issued its decision in West Virginia v. EPA, in which it held that the EPA does not have the authority to apply generation shifting in the regulation of GHG emissions. The judgment reversed the D.C. Circuit Court's decision and remanded the case for further proceedings consistent with the U.S. Supreme Court's opinion. In May 2024, the EPA issued a more stringent and more encompassing rule to replace the ACE rule. TheIn June 2025, the EPA proposed to repeal the GHG rule issued in May 20242024, isand currentlythe beingrule challengedremains subject to ongoing legal challenges in the D.C. Circuit after the U.S. Supreme Court declined to issue a stay of that rule.rule, Webut expectthat litigation is currently abated. As a result, the Trumpscope, Administrationtiming and ultimate requirements of any federal regulation of GHG emissions from existing power generation facilities remains uncertain. Additionally, in February 2026, the EPA issued a rule that repeals the agency's prior 2009 endangerment finding for all GHG emission standards for light-, medium-, and heavy-duty vehicles. The rescission of the endangerment finding does not impact power plants, however, the EPA has also stated that, for other rules that have relied on the endangerment finding, it intends to reviewinitiate theother Mayrulemakings 2024to GHGaddress rule.any Additionally,overlapping pursuantissues. Several environmental groups have filed a challenge to the Order,EPA's the Administratorrepeal of the EPA,endangerment finding in collaboration with the headsD.C. ofCircuit anyCourt. otherRegulatory relevantuncertainty agencies,resulting willfrom submitchanges jointin recommendationsadministration topriorities, thejudicial Director of the Office of Managementreview and Budgetenforcement onapproaches themay legalitycomplicate long-term capital planning, asset retirement decisions and continuinginvestments applicabilityin ofnew thetechnologies, Decembereven 2009if Endangermentregulatory Finding.requirements are delayed, modified or repealed. In addition, a number of federal court cases have been filed in recent years asserting damage claims related to GHG emissions, and the results in those proceedings could establish adverse precedent that might apply to companies (including us) that produce GHG emissions. We could be materially and adversely affected if federal and/or state legislation or regulations that address global climate change require efforts that exceed or are more expensive than our currently planned initiativesinitiatives, or if regulatory uncertainty itself results in increased costs or inefficiencies, or if we are subject to lawsuits for alleged damage to persons or property resulting from GHG emissions.
see in full comparison
New text topics: antitrust, fine
“The consummation of the Cogentrix Transactions (as defined below) remains subject to the satisfaction or waiver of customary closing conditions, including receipt of all requisite regulatory approvals, and expiration or termination of all applicable waiting periods under the Hart-Scott-Rodino Antitrust Improvements Act of 1976 (the HSR Act), as well as the satisfaction of other customary conditions set forth in the definitive agreements. The closing of each of the Cogentrix Transactions is also conditioned upon being consummated substantially concurrently. …”
see in full comparison
New text
“If electricity demand does not grow at the rate expected, or if we are unable to execute on large load offtake opportunities, including under long-term power purchase or offtake agreements that we have entered into, our financial performance, growth opportunities, and stock price could be adversely impacted.”
see in full comparison
New text
“We may not be able to consummate the Cogentrix Transactions on the anticipated terms, on the anticipated timeline, or at all, which could adversely affect our business, financial condition, results of operation and stock price.”
see in full comparison
Removed text
“If electricity demand does not grow at the rate expected, or if we are unable to execute on large load offtake opportunities, our financial performance, growth opportunities, and stock price could be adversely impacted.”
see in full comparison
New text
“Following the completion of the Cogentrix Transactions, we may not realize the anticipated synergies and other expected benefits of the Cogentrix Transactions on the anticipated timeline or at all.”
see in full comparison
Full comparison: every changed paragraph (80)

Green = added, red = removed. Unchanged paragraphs, 4 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Added

•If electricity demand does not grow at the rate expected, or if we are unable to execute on large load offtake opportunities, including under long-term power purchase or offtake agreements that we have entered into, our financial performance, growth opportunities, and stock price could be adversely impacted.

Added

•We may not be able to consummate the Cogentrix Transactions on the anticipated terms, on the anticipated timeline, or at all, which could adversely affect our business, financial condition, results of operation and stock price.

Added

•Following completion of the Cogentrix Transactions, we may not realize the anticipated synergies and other expected benefits of the Cogentrix Transactions on the anticipated timeline or at all.

Removed

•If electricity demand does not grow at the rate expected, or if we are unable to execute on large load offtake opportunities, our financial performance, growth opportunities, and stock price could be adversely impacted.

Reworded

•Evolving expectations from stakeholders, including investors, on ESGsustainability issues, including climate change and sustainability matters,risk, and erosion of stakeholder trust or confidence could influence actions or decisions about our company and our industry and could adversely affect our business, operations, financial results, or stock price.

Reworded

Extreme weather events can also materially impact power prices or otherwise exacerbate conditions or circumstances that result in volatility of power prices. For example, insevere Februarywinter 2021,storms across the U.S. experiencedsuch as Winter Storm Uri in February 2021 and Winter Storm Fern in January 2026, and extreme cold temperatures in the central U.S., including Texas. This severe weather event substantially increased the demand for natural gas used in our electric power generation business, and the cold further limited the availability of renewable generation across the region contributing to extremely high market prices for natural gas and electricity, whichTexas, resulted in widespread wholesale power market volatility, substantial increases in the costs to procure sufficient fuel supplysupply, and increased collateral posting requirements. Winter Storm Elliott, in December 2022, and Winter Storm Heather, in January 2024, were other examples of extreme weather across the U.S. that resulted in widespread wholesale power market volatility.

Reworded

The majority of our facilities operate as "merchant" facilities without long-term power sales agreements. As a result, we largely sell electric energy, capacity and ancillary services into the wholesale energy spot market or into other wholesale and retail power markets on a short-term basis and are not guaranteed any rate of return on our capital investments. Consequently, there can be no assurance that we willmay not be able to sell any or all of the electric energy, capacity or ancillary services from those facilities at commercially attractive rates or that our facilities will be able to operate profitably. We depend, in large part, upon prevailing market prices for power, capacity and fuel. Given the volatility of commodity power prices, to the extent we are unable to hedge or otherwise secure long-term power sales agreements for the output of our power generation facilities, our revenues and profitability will be subject to volatility, and our financial condition, results of operations and cash flows could be materially adversely affected.

Reworded

We rely on natural gas, coal, fuel oil, and nuclear fuel for the majority of our power generation facilities. Delivery of these fuels to the facilities is dependent upon the continuing availability of such fuels and financial viability of contractual counterparties as well as upon the infrastructure (including mines, rail lines, rail cars, barge facilities, roadways, riverways and natural gas pipelines) available and functioning to serve each generation facility, and geopolitical risk, including the current Russia and Ukraine conflict and the potential for additional U.S. sanctions against Russia or other potential restrictions on Russian energy deliveries. See Item 7. Management's Discussion and Analysis of Financial Condition, and Results of Operations – SignificantBusiness ActivitiesEnvironment and Events, and Items Influencing Future Performance - Macroeconomic Conditions.Outlook. As a result, we have experienced, and remain subject to the risks of disruptions or curtailments in the production of power at our generation facilities if no fuel is available at any price, if a counterparty fails to perform or if there is a disruption in the fuel delivery infrastructure. Certain of our generation facilities rely on a limited number of counterparties, such as natural gas suppliers and railcar companies, to provide the necessary fuel. Disputes relating to or non-performance of contractual arrangements have resulted in, and may continue to result in adverse impacts to our costs, revenues, results of operations, financial condition, and cash flows.

Reworded

We also buy significant quantities of fuel on a short-term or spot market basis. Prices for all of our fuels fluctuate, sometimes rising or falling significantly over a relatively short period of time. The price we can obtain for the sale of energy may not rise at the same rate, or may not rise at all, to match a rise in fuel or delivery costs. The mismatch between the gas day and related nomination cycles and the power day and ISO/RTO market timing may result in fuel procurement challenges. This may have a material adverse effect on our financial and operating performance. Volatility in market prices for fuel and power results from, among other factors:

Reworded

To the extent we engage in hedging and risk management, and power purchase agreement activities, we are exposed to the credit risk that counterparties that owe us money, energy or other commodities as a result of these activities will not perform their obligations to us. Should the counterparties to these arrangements fail to perform, we could be forced to enter into alternative hedging arrangements or honor the underlying commitment at then-current market prices. Additionally, our counterparties may seek bankruptcy protection under Chapter 11 or liquidation under Chapter 7 of the U.S. Bankruptcy Code. Our credit risk may be exacerbated to the extent collateral held by us cannot be realized or is liquidated at prices not sufficient to recover the full amount due to us. There can be no assurance that anyAny such losses or impairments to the carrying value of our financial assets would notcould materially and adversely affect our financial condition, results of operations and cash flows. In such event, we could incur losses or forgo expected gains in addition to amounts, if any, already paid to the counterparties. Market participants in the ISOs/RTOs in which we operate are also exposed to risks that another market participant may default on its obligations to pay such ISO/RTO for electricity or services taken, in which case such costs, to the extent not offset by posted security and other protections available to such ISO/RTO, may be allocated to various non-defaulting ISO/RTO market participants, including us.

Added

If electricity demand does not grow at the rate expected, or if we are unable to execute on large load offtake opportunities, including under long-term power purchase or offtake agreements that we have entered into, our financial performance, growth opportunities, and stock price could be adversely impacted.

Added

Multiple demand drivers such as emergence of large load data centers, including in response to transformations in technologies like artificial intelligence (AI) and electrification of oil field operations (specifically in the Permian Basin of west Texas), have accelerated, and are expected to continue to accelerate, load growth in the geographic regions we serve. We continue to pursue and execute on additional opportunities for the prospective sale of power from our generation fleet facilities pursuant to long-term agreements to supply large load facilities. The successful execution of such agreements may depend on our ability to complete related projects, enhancements, uprates or operational improvements within specified timelines, budgets and performance parameters.

Added

Such transactions and executed agreements are subject to certain risks and uncertainties, including various currently contemplated or future potential regulatory actions, reviews, and/or approvals, adverse legislative actions, and project execution risk including significant capital expenditures required to complete the nuclear uprates, as well as risks related to operational performance, fuel supply and other factors, that could affect our ability to meet contractual obligations, which could impact the timing of, and our ability to consummate, such transactions. In addition, if demand does not continue to increase at a rate in line with market expectations due to various factors, such as changes in technology, more energy efficient AI solutions or slow adoption of AI products and services, economic downturns, or adverse government actions, or if we are unable to execute on such large load offtake opportunities and perform our obligations under executed agreements as anticipated, our opportunities for growth and stock price may be adversely impacted.

Reworded

Our generation and competitive retail businesses rely on a competitive wholesale marketplace. The competitive wholesale marketplace may be undermined by changes in market structure and out-of-market subsidies provided by federal or state entities, including bailouts of uneconomic plants, imports of power from Canada, renewable mandates or subsidies, as well as out-of-market payments to new generators. Multiple potential changes have been and are being evaluated by the PUCT and the Texas Legislature for the ERCOT market, including Dispatchable Reliability Reserve Service that would facilitate compliance with a required reliability standard, the ultimate resolution of which is unknown. Similarly, the Administration's use of Executive Orders and engagement by the PJM Governors could add regulatory uncertainty to the extent resource entry and exit decisions become disconnected from market fundamentals. In another example, the resolution of a number of filings pending at FERC could impact PJM capacity market rules in future years.

Reworded

Other factors may contribute to increased competition in wholesale power markets. We expect that we will continue to face intense competition from numerous companies, including new entrants or consolidation of existing competitors, in the industry. Certain federal and state entities in jurisdictions in which we operate have either enacted or are considering regulations or legislation to subsidize otherwise uneconomic plants and attempt to incentivize, including through certain tax benefits, the construction and development of additional renewable resources as well as increases in energy efficiency investments. For example, the Inflation Reduction Act of 2022 contains a number of tax credits and incentives relating to renewable projects and clean energy technologies such as nuclear energy. New entrants or existing competitors may find it more economical to develop new renewable projects or invest in clean energy technologies in which we would like to invest. Subsidies (or increases thereto) to our competitors could result in increased competition for us, which could have a material adverse effect on our financial condition, results of operations and cash flows.

Reworded

Given the overall attractiveness of certain markets in which we operateoperate, continued customer interest in zero carbon resources, and certain tax benefits associated with renewable energy, among other matters, energy market participants have continued to construct new generation facilities or invest in enhancements or expansions of existing generation facilities despite relatively low wholesale power prices. Assuming this market dynamic continues, our results of operations and financial condition could be materially and adversely affected if such additional generation capacity results in an over-supply of electricity that causes a reduction in wholesale power prices. Additionally, new or existing market participants without, or with less, fossil fuel operations may gain additional market share, or reduce our market share, due to evolving expectations and sentiments of key stakeholders, government, and regulatory authorities regarding our operations and activities.

Reworded

Our results of operations may be negatively affected by sustained downturns or sluggishness in the economy, including lower prices for power, generation capacitypower and natural gas, which can fluctuate substantially.substantially, and lower generation output. Increased unemployment of residential customers and decreased demand for products and services by commercial and industrial customers resulting from an economic downturn could lead to declines in the demand for energy and an increase in the number of uncollectible customer balances, which would negatively impact our overall sales and cash flows. The convergence of current global conditions, including sustained inflation, elevated interest rates, and the geopolitical climate, has and could lead to, or accelerate or exacerbate the occurrence of, a significant economic downturn, as well as changes in consumer and counterparty behavior, higher costs of capital, decreases in the value of our existing long-dated contracts, commodity price increases and volatility, supply chain shortages, and other adverse impacts to our business. For example, the U.S. administration has taken action or may take action in the future with respect to major changes to trade policies, such as the imposition of tariffs on imported products and the withdrawal from or renegotiation of certain trade agreements. Any such material changes in trade policies, including the imposition of tariffs, could lead to increased supply chain disruptions and increased supply chain costs, which could have a material adverse impact on our business, financial condition and results of operations.

Reworded

Our liquidity needs could be difficult to satisfy, particularly during times of uncertainty in the financial markets or during times of significant fluctuation in commodity prices, and we may be unable to access capital on favorable terms or at all in the future, which could have a material adverse effect on us. VistraWe currently maintainsmaintain a mix of investment grade and non-investment grade credit ratings that could negatively affect our ability to access capital on favorable terms or result in higher collateral requirements, particularly if our credit ratings were to be downgraded in the future.

Reworded

There are also increasing financial risks for companies that own and operate fossil fuel generation as some institutional lenders or other sources of capital have become more attentive to sustainable financing practices and some of them may seek commitments on emission reduction targets or expected use or proceeds when providing funding to, or decline to provide funding for companies who produce or utilize fossil fuel energy or that have higher levels of GHG emissions. Our Vistra Operations Credit Agreement contains Sustainability Adjustments. These adjustments use baseline values from KPI Metrics and provide for decreases in the applicable credit spread adjustments and commitment fee rates if our reported metrics are a certain percentage below the baseline values, adjusted on a year-to-year basis. Conversely, if our reported metrics are a certain percentage above the baseline values, adjusted on a year-to-year basis, the applicable credit spread adjustments and fee rates are increased. Building in these adjustments to our credit agreement helps to show lenders we are committed to lowering our GHG emissions, but failing to meet the targets on a regular basis could be viewed negatively by such lenders. Additionally, the lending practices of institutional lenders have been the subject of intensive lobbying efforts in recent years, oftentimes public in nature, by environmental activists and others concerned about climate change not to provide funding for companies in the broader energy sector. Limitations on our access to, or increases in our cost of, capital could have a material adverse effect on us.

Reworded

In addition, Vistrawe currently maintainsmaintain a mix of investment grade and non-investment grade credit ratings. As a result, we may not be able to access capital on terms (financial or otherwise) as favorable as companies that maintain full investment-grade credit ratings or we may be unable to access capital at all at times when the credit markets tighten. In addition, due to our non-investment grade credit ratings, counterparties request collateral support (including cash or letters of credit) in order to enter into certain transactions with us.

Reworded

We undertake certain hedging and commodity activities and enter certain financing arrangements with various counterparties that require cash collateral or the posting of letters of credit which are at risk of being drawn down in the event we default on our obligations. We currently use margin deposits, prepayments, surety bonds, U.S. Treasury securities or Treasury Strips, letters of credit and first liens as credit support for commodity procurement and risk management activities. Future cash collateral requirements may increase based on the extent of our involvement in standard contracts and movements in commodity prices, the use of first lien collateral, and also based on our credit ratings and the general perception of creditworthiness in the markets in which we operate. In the case of commodity arrangements, the amount of such credit support that must be provided is typically based on the difference between the price of the commodity in a given contract and the market price of the commodity. Significant movements in market prices can result in our being required to provide cash collateral and letters of credit in very large amounts. The effectiveness of our strategy may be dependent on the amount of collateral available to enter into or maintain these contracts, and liquidity requirements may be greater than we anticipate or will be able to meet. Without enough working capital or other sources of available liquidity to post as collateral, we may not be able to manage price volatility effectively or to implement our strategy. A material increase in the amount of letters of credit or cash collateral required to be provided to our counterparties may have a material adverse effect on us.

Added

We may not be able to consummate the Cogentrix Transactions on the anticipated terms, on the anticipated timeline, or at all, which could adversely affect our business, financial condition, results of operation and stock price.

Added

The consummation of the Cogentrix Transactions (as defined below) remains subject to the satisfaction or waiver of customary closing conditions, including receipt of all requisite regulatory approvals, and expiration or termination of all applicable waiting periods under the Hart-Scott-Rodino Antitrust Improvements Act of 1976 (the HSR Act), as well as the satisfaction of other customary conditions set forth in the definitive agreements. The closing of each of the Cogentrix Transactions is also conditioned upon being consummated substantially concurrently. These closing conditions may not be fulfilled in a timely manner or at all, and, accordingly, the Cogentrix Transactions may not be completed.

Added

In connection with the Cogentrix Transactions, a portion of the consideration payable at closing consists of 5,000,000 shares of our common stock. The issuance of these shares will dilute the ownership interests of our existing stockholders. Although the issuance represents a relatively small percentage of our currently outstanding common stock, such dilution could adversely affect the market price of our common stock.

Added

In addition, the definitive agreements provide that either party may terminate the applicable agreement if the Cogentrix Transactions are not completed by December 31, 2026 (which date may be extended twice, in each case, by up to 90 days, as further provided in the definitive agreements). If we are unable to complete the Cogentrix Transactions, we still will incur and will remain liable for significant transaction costs, including legal, accounting, advisory and other costs relating to the Cogentrix Transactions. Also, depending upon the reasons for not completing the Cogentrix Transactions, we may be required to pay Cogentrix Energy a termination fee of, as to the purchase agreement, $77,839,364, and, as to the merger agreement, $72,160,636.

Added

If the Cogentrix Transactions are not consummated, or are consummated on different terms than as contemplated by the definitive agreements, we could be adversely affected and subject to a variety of risks associated with the failure to consummate the Cogentrix Transactions, or to consummate the Cogentrix Transactions as contemplated by the definitive agreements, including:

Added

•our stockholders may be prevented from realizing the anticipated potential benefits of the Cogentrix Transactions;

Added

•the market price of our common stock could decline significantly;

Added

•reputational harm due to the adverse public perception of any failure to successfully complete the Cogentrix Transactions; and

Added

•the attention of our management and employees may be diverted from their day-to-day business and operational matters and our relationships with our customers and suppliers may be disrupted as a result of efforts relating to attempting to consummate the Cogentrix Transactions.

Added

Following the completion of the Cogentrix Transactions, we may not realize the anticipated synergies and other expected benefits of the Cogentrix Transactions on the anticipated timeline or at all.

Added

Even if the Cogentrix Transactions are completed, we may not realize the anticipated synergies and other expected benefits of the Cogentrix Transactions on the anticipated timeline or at all. The success of the Cogentrix Transactions will depend, in part, on our ability to integrate the Cogentrix assets and operations into our existing business, manage and operate the acquired facilities efficiently, retain key personnel, and effectively manage the increased scale and geographic footprint of our generation portfolio. Further, the acquired assets may be subject to operational, regulatory, environmental, market or other risks that differ from or are greater than those associated with our existing assets, including unanticipated capital expenditure requirements, potential unknown liabilities, or changes in market rules or regulatory requirements applicable to the regions in which the Cogentrix assets operate. We will be required to devote significant management attention and resources to the integration of Cogentrix Energy’s business practices and operations into our existing business.

Added

For all these reasons, it is possible that the integration process could result in the distraction of our management, the disruption of our ongoing business or inconsistencies in operations, services, standards, controls, policies and procedures, any of which could adversely affect our ability to maintain relationships with operators, vendors and employees or to achieve the anticipated benefits of the Cogentrix Transactions. Failure to successfully integrate and operate the acquired assets, or to realize the anticipated benefits of the Cogentrix Transactions could have a material adverse effect on our business, financial condition, results of operations and cash flows.

Reworded

We may not be able to complete future acquisitionsacquisitions, including the pending Cogentrix Transactions, on favorable terms or at all, successfully integrate future acquisitions into our business, or effectively identify and invest in value-creating businesses, assets or projects, which could result in unanticipated expenses and losses or otherwise hinder or delay our growth strategy.

Reworded

As part of our growth strategy, including our desire to grow our retail platform,platform and diversify and expand our generation assets, we may pursue acquisitions of assets or operating entities. This strategy depends on the Company's ability to successfully identify and evaluate acquisition opportunities and consummate acquisitions on favorable terms. Our ability to continue to implement this component of our growth strategy will be limited by our ability to identify appropriate acquisition or joint venture candidates and our financial resources, including available cash and access to capital. In addition, the Company will compete with other companies for these limited acquisition opportunities, which may increase the Company's cost of making acquisitions or limit the Company’s ability to make acquisitions at all. Any expense incurred in completing acquisitions or entering into joint ventures, the time it takes to integrate an acquisition or our failure to integrate acquired businesses successfully could result in unanticipated expenses and losses. Furthermore, we may not be able to fully realize the anticipated benefits from any future acquisitions or joint ventures we may pursue. In addition, the process of integrating acquired operations into our existing operations may involve unknown risks, result in unforeseen operating difficulties and expenses, and may require significant financial resources that would otherwise be available for the execution of our business strategy. If the Company is unable to identify and consummate future acquisitions, it may impede the Company's ability to execute its growth strategy.

Reworded

We have a substantial capital allocation plan intended for investments in renewable assets, including solar development projects and battery ESS. As part of our business strategy, we plan to continually assess potential strategic acquisitions or investments in renewable assets, emerging technologies and related projects. Notably, the Company's ability to successfully develop our current renewables projects, or in the future acquire additional renewable assets, may be impacted by the demand for and viability of renewable assets generally, which may vary depending on availability of projects and financing, as well as public policy, financial and tax mechanisms implemented at the state and federal levels to support the development of renewable assets. Various factors could result in increased costs or result in delays or cancellation of our current or future renewable projects, or the loss of, or declines in the value of, our investments in projects including, but not limited to, risks relating to siting, financing, engineering and construction, permitting, interconnection requests, federal and state regulatory approvals, new legislation or regulatory changes impacting the industry, commissioning delays, import tariffs, changes to federal income tax laws, economic events or factors, environmental and community concerns, availability of or requirements for additional funding, enhanced competition, or the potential for termination of the power sales contract as a result of a failure to meet certain milestones. Further, the recent proliferation of renewable projects has resulted in a large volume of interconnection requests submitted to grid operators, including the markets in which we operate, resulting in significant delays to the approval process and estimated completion dates for our projects and others. FERC and regional ISOs are working to address these backlogs, including with regulatory rule changes, changing the interconnection process, the impacts of which are currently unknown because the changes have only been partially implemented. Additionally, the increased demand for construction of renewables projects, such as battery ESS and solar projects, and other labor market and supply chain constraints have resulted, and may continue to result, in limited availability of qualified specialists, contractors, and necessary services or materials, leading to delays in and higher costs for the development and construction of our current and future planned projects. Should any of these factors occur, our financial position, results of operations, and cash flows could be adversely affected, or our future growth opportunities may not be realized as anticipated.

Reworded

While certain of our subsidiaries are in various stages of developing and constructing solar generation facilities and battery ESS and certain of these projects have signed long-term contracts or made similar arrangements for the sale of electricity, in other cases, our subsidiaries may enter into obligations in the development process even though the subsidiaries have not yet secured power purchase arrangements or other important elements for a successful project. If the project does not proceed as planned, our subsidiaries may remain obligated for certain liabilities even though the project will not be completed. Development is inherently uncertain and we may forgo certain development opportunities and we may undertake significant development costs before determining that we will not proceed with a particular project. We believe that capitalized costs for projects under development are recoverable; however, there can be no assurance that any individual project willmay not be completed andor reach commercial operation. If these development efforts are not successful, we may abandon a project under development and write off the costs incurred in connection with such project and could incur additional losses associated with any related contingent liabilities.

Reworded

We are subject to the tax laws and regulations of the U.S. federal, state and local governments. From time to time, legislative measures may be enacted that could adversely affect our overall tax positions regarding income or other taxes. There can be no assurance that ourOur effective tax rate or tax payments will notcould be adversely affected by these legislative measures. The Tax Cuts and Jobs Act of 2017 (TCJA), enacted December 22, 2017, and the Inflation Reduction Act (IRA), enacted August 16, 2022, and the One Big Beautiful Bill Act (OBBBA) enacted July 4, 2025, both introduced significant changes to current U.S. federal tax law. For example, the IRAOBBBA includes the enactment of several new proposals, including, but not limited to (i) a corporatereinstatement alternativeof minimum100% accelerated depreciation for certain qualifying expenditures, (ii) an increase in the limit of certain interest that can be deducted by a corporation, (iii) accelerated phase-out of certain renewable energy tax basedcredits onassociated bookwith incomesolar and wind projects, and (iiiv) additional requirements to qualify for enhanced renewable energy tax credits. These changes are complex and continue to be the subject of additional guidance issued by the U.S. Treasury and the Internal Revenue Service. In addition, the reaction to the federal tax changes by the individual states continues to evolve. Our interpretations and assumptions around U.S. tax reform may evolve in future periods as further administrative guidance and regulations are issued, which may materially affect our effective tax rate or tax payments.

Reworded

U.S. federal, state and local tax laws and regulations are extremely complex and subject to varying interpretations. There can be no assurance that ourOur tax positions willmay not be sustained if challenged by relevant tax authorities and if not sustained, there could be a material impact on our results of operations and financial condition.

Removed

If electricity demand does not grow at the rate expected, or if we are unable to execute on large load offtake opportunities, our financial performance, growth opportunities, and stock price could be adversely impacted.

Removed

Multiple demand drivers such as emergence of large load data centers, including in response to transformations in technologies like artificial intelligence (AI) and electrification of oil field operations (specifically in the Permian Basin of west Texas), have accelerated, and are expected to continue to accelerate, load growth in the geographic regions we serve. We continue to pursue opportunities for the potential sale of power from our existing or new nuclear and gas facilities pursuant to long-term agreements to supply large load facilities. Such potential transactions are subject to certain risks and uncertainties, including various currently contemplated or future potential regulatory actions, reviews, and/or approvals and legislative actions, which could impact the timing of, and our ability to consummate, a potential transaction. In addition, if demand does not continue to increase at a rate in line with market expectations due to various factors, such as changes in technology, more energy efficient AI solutions or slow adoption of AI products and services, economic downturns, or adverse government actions, or if we are unable to execute on such large load offtake opportunities, our opportunities for growth and stock price may be adversely impacted.

Reworded

Our businesses operate in changing market environments influenced by various state and federal legislative and regulatory initiatives regarding the restructuring of the energy industry, including competition in power generation and sale of electricity, natural gas, emissions and renewable energy certificates, and other commodities. Although weWe attempt to comply with changing legislative and regulatory requirements, but there is a risk that we will fail to adapt to any such changes successfully or on a timely basis. Compliance with, or changes to, the requirements under these legal and regulatory regimes, including those proposed or implemented under the current presidential administration or during any future change of administration, or any repeal of existing beneficial laws or regulations, may adversely impact our businesses, results of operations, liquidity, financial condition, and cash flows.

Reworded

Our businesses are subject to numerous state and federal laws (including, but not limited to, Texas Public Utility Regulatory Act, the Federal Power Act, the Natural Gas Policy Act, the Atomic Energy Act, the Public Utility Regulatory Policies Act of 1978, the Clean Air Act (CAA), the Clean Water Act (CWA), the Resource Conservation and Recovery Act (RCRA), the Energy Policy Act of 2005, the Dodd-Frank Wall Street Reform and the Consumer Protection Act and the Telephone Consumer Protection Act), changing governmental policy and regulatory actions (including those of the FERC, the DOE, the NERC, the RCT, the MSHA, the EPA, the NRC, the DOJ, the FTC, the CFTC, state public utility commissions and state environmental regulatory agencies), and the rules, guidelines and protocols of ERCOT, CAISO, ISO-NE, MISO, NYISO and PJM with respect to various matters, including, but not limited to, market structure and design, operation of nuclear generation facilities, construction and operation of other generation facilities, orders from governmental or regulatory agencies requiring continued operation of units beyond their planned retirement dates, development, operation and reclamation of lignite mines, recovery of costs and investments, decommissioning costs, market behavior rules, present or prospective wholesale and retail competition, administrative pricing mechanisms (and adjustments thereto), rates for wholesale sales of electricity, mandatory reliability standards and environmental matters. We, along with other market participants, are subject to electricity pricing constraints and market behavior and other competition-related rules and regulations. Additionally, Ambit’sAmbit's direct selling business (i) could be found by regulators not to be in compliance with applicable law or regulations, which may lead to our inability to obtain or maintain a license, permit, or similar certification and (ii) may be required to alter its compensation practices in order to comply with applicable federal or state law or regulations. Changes in, revisions to, or reinterpretations of, existing laws and regulations may have a material adverse effect on our businesses, results of operations, liquidity, financial condition and cash flows.

Reworded

Extreme weather events have resulted, and in the future may result, in efforts by both federal and state government and regulatory agencies to investigate and determine the causes of such events. For example, asWinter aStorm resultUri ofand Winter Storm Uri, we received a civil investigative demand from the Attorney General of Texas as well as a request for information from ERCOT, NERC, and other regulatory bodies related to this event. Winter Storm Elliott, in December 2022, alsoElliott led to regulatory requests for information and notices of investigation by NERC, FERC, regional reliability entities, ISOs/RTOs, and independent market monitors for regions across the country. Such investigations have resulted, and in the future may result, in changes in laws or regulations that impact our industry and businesses including, but not limited to, additional requirements for winterization of various facets of the electricity supply chain including generation, transmission, and fuel supply; improvements in coordination among the various participants in the electricity supply chain during any future event; restrictions or limitations on the types of plans permitted to be offered to customers; potential revisions to the method of calculation of market compensation and incentives relating to the continued operation of assets that only run periodically, including during extreme weather events or other times of scarcity; and other potential legislative and regulatory corrective actions that may be taken. Previously announced or future legal proceedings, regulatory actions, or other administrative proceedings involving market participants may lead to adverse determinations or other findings of violations of laws, rules, or regulations, any of which may impact the ability of market participants to satisfy, in whole or in part, their respective obligations. For example, the Texas Legislature, the PUCT, ERCOT, FERC, and NERC have implemented new requirements and continue to consider future market design and other rule changes in response to Winter Storm Uri and other extreme weather events.

Reworded

Finally, the regulatory environment has undergone significant changes in the last several years due to state and federal policies affecting wholesale and retail competition and the creation of incentives for the addition of large amounts of new renewable generation. For example, changes to, or development of, legislation that requires the use of clean renewable and alternate fuel sources or mandate the implementation of energy conservation programs that require the implementation of new technologies, could increase our capital expenditures and/or impact our financial condition. Changes enacted by the Texas Legislature through Senate Bill 2627, the Powering Texas Forward Act, to administer Texas Energy Fund (TEF) programs, which include grants and loans to finance the construction, maintenance, modernization, and operation of electric facilities in Texas, may negatively impact our financial condition if it materially changes market fundamentals. Recent proposals in PJM for an out-of-market reliability backstop auction for new dispatchable generation could similarly negatively impact our financial condition if it materially changes market fundamentals. Additionally, in some retail energy markets, state legislators, government agencies and other interested parties have made proposals to change the use of market-based pricing, re-regulate areas of these markets that have previously been competitive, or permit electricity delivery companies to construct or acquire generation facilities. Other proposals to re-regulate the retail energy industry may be made, and legislative or other actions affecting electricity and natural gas deregulation or restructuring process may be delayed, discontinued or reversed in states in which we currently operate or may in the future operate. If such changes were to be enacted by a regulatory body, we may lose customers, incur higher costs and/or find it more difficult to acquire new customers. These changes are ongoing, and we cannot predict the future design of the wholesale power markets or the ultimate effect that the changing regulatory environment will have on our business.

Reworded

We are required to obtain, and to comply with, numerous permits and licenses from federal, state and local governmental agencies. The process of obtaining and renewing necessary permits and licenses can be lengthy and complex and can sometimes result in the establishment of conditions that make the project or activity for which the permit or license was sought unprofitable or otherwise unattractive. In addition, such permits or licenses may be subject to denial, revocation or modification under various circumstances. Failure to obtain or comply with the conditions of permits or licenses, or failure to comply with applicable laws or regulations, may result in the delay or temporary suspension of our operations and electricity sales or the curtailment of our delivery of electricity to our customers and may subject us to penalties and other sanctions. Although various regulators routinely renew existing permits and licenses, renewalRenewal of our existing permits or licenses could be denied or jeopardized by various factors, including (a) failure to provide adequate financial assurance for closure, (b) failure to comply with environmental, health and safety laws and regulations or permit conditions, (c) local community, political or other opposition and (d) executive, legislative or regulatory action.

Reworded

The Biden Administration recently finalized or proposed several regulatory actions establishing new requirements for control of certain emissions from sources, including electricity generation facilities. At present, many of those regulatory actions have been abated while the Trump Administration reviews those regulatory actions and promulgates new proposals. In the future, the EPA may also propose and finalize additional regulatory actions that may adversely affect our existing generation facilities or our ability to cost-effectively develop new generation facilities. There is no assurance that theThe currently installed emissions control equipment at our lignite, coal and/or natural gas-fueled generation facilities willmay not satisfy the requirements under any future EPA or state environmental regulations. Some of the recent regulatory actions, such as the EPA's Good Neighbor Plan for the 2015 Ozone NAAQS, the final rule to regulated GHG emissions that would replace the ACE rule, and actions under the Regional Haze program, if not repealed, altered, or invalidated by the courts could require us to install significant additional control equipment, resulting in potentially material costs of compliance for our generation units, including capital expenditures, higher operating and fuel costs and potential production curtailments or plant retirements. These costs or operation impacts could have a material adverse effect on us. In January 2025, President Trump issued a series of executive orders, including an order titled Unleashing American Energy (the "Order") that ordered that all federal agencies are to review all existing regulations, orders and other actions for consistency with the policy goals in that Order, and develop an action plan within 30 days to resolve any policy inconsistencies. In addition, the Order stated that the U.S. Attorney General may request stays of litigation involving any identified rules or actions from the review. We expect theThe Trump Administration tois reviewreviewing the recent actions of the Biden Administration, but the outcome of those actions is uncertain.

Reworded

We could be materially and adversely affected if new federal or state legislation or regulations are adopted to address global climate changechange, or if existing regulations are vacated, stayed, revised or re-proposed, that could require efforts that exceed or are more expensive than our currently planned initiatives or if we are subject to lawsuits for alleged damage to persons or property resulting from greenhouse gas emissions.

Reworded

There is continuing emphasis nationally and internationally on global climate change and how GHG emissions, such as CO2, contribute to global climate change. Over the last several years, the U.S. Congress has considered and debated several proposals intended to address climate change using different approaches, including a cap on carbon emissions with emitters allowed to trade unused emission allowances (cap-and-trade), a tax on carbon or GHG emissions, incentives for the development of low-carbon technology and federal renewable portfolio standards. In July 2019, the EPA finalized the ACE rule that developed emissions guidelines that states must use when developing plans to regulate GHG emissions from existing coal-fueled electric generation units. In January 2021, the ACE rule was vacated by the D.C. Circuit Court and remanded to the EPA for further consideration in accordance with the court's ruling. The D.C. Circuit Court's decision was appealed to the U.S. Supreme Court. In June 2022, the U.S. Supreme Court issued its decision in West Virginia v. EPA, in which it held that the EPA does not have the authority to apply generation shifting in the regulation of GHG emissions. The judgment reversed the D.C. Circuit Court's decision and remanded the case for further proceedings consistent with the U.S. Supreme Court's opinion. In May 2024, the EPA issued a more stringent and more encompassing rule to replace the ACE rule. TheIn June 2025, the EPA proposed to repeal the GHG rule issued in May 20242024, isand currentlythe beingrule challengedremains subject to ongoing legal challenges in the D.C. Circuit after the U.S. Supreme Court declined to issue a stay of that rule.rule, Webut expectthat litigation is currently abated. As a result, the Trumpscope, Administrationtiming and ultimate requirements of any federal regulation of GHG emissions from existing power generation facilities remains uncertain. Additionally, in February 2026, the EPA issued a rule that repeals the agency's prior 2009 endangerment finding for all GHG emission standards for light-, medium-, and heavy-duty vehicles. The rescission of the endangerment finding does not impact power plants, however, the EPA has also stated that, for other rules that have relied on the endangerment finding, it intends to reviewinitiate theother Mayrulemakings 2024to GHGaddress rule.any Additionally,overlapping pursuantissues. Several environmental groups have filed a challenge to the Order,EPA's the Administratorrepeal of the EPA,endangerment finding in collaboration with the headsD.C. ofCircuit anyCourt. otherRegulatory relevantuncertainty agencies,resulting willfrom submitchanges jointin recommendationsadministration topriorities, thejudicial Director of the Office of Managementreview and Budgetenforcement onapproaches themay legalitycomplicate long-term capital planning, asset retirement decisions and continuinginvestments applicabilityin ofnew thetechnologies, Decembereven 2009if Endangermentregulatory Finding.requirements are delayed, modified or repealed. In addition, a number of federal court cases have been filed in recent years asserting damage claims related to GHG emissions, and the results in those proceedings could establish adverse precedent that might apply to companies (including us) that produce GHG emissions. We could be materially and adversely affected if federal and/or state legislation or regulations that address global climate change require efforts that exceed or are more expensive than our currently planned initiativesinitiatives, or if regulatory uncertainty itself results in increased costs or inefficiencies, or if we are subject to lawsuits for alleged damage to persons or property resulting from GHG emissions.

Removed

Additionally, in January 2021, President Biden issued written notification to the United Nations of the U.S.'s intention to rejoin the Paris Agreement, effective in February 2021. However, in January 2025, President Trump signed an Executive Order announcing the withdrawal from the Paris Agreement.

Reworded

We are also involved in the ordinary course of business in regulatory investigations and other administrative proceedings, and we are exposed to the risk of additional regulatory investigations or administrative proceedings. As we adopt new technologies, like artificial intelligence (AI),AI, there is a risk that the content, analyses, recommendations, or judgments that AI applications assist in producing are alleged to be deficient, inaccurate, biased, or infringe on other's rights or property interests. Any such regulatory investigation or administrative proceeding could result in us incurring penalties and other costs which may have a material adverse effect on us.

Reworded

Although weWe are the primary provider of our retail businesses' wholesale electricity supply requirements, but our retail businesses purchase a portion of their supply requirements from third parties. As a result, the financial performance of our retail business depends on their ability to obtain adequate supplies of electric generation from third parties at prices below the prices they charge their customers. Consequently, our earnings and cash flows could be adversely affected in any period in which the retail businesses' wholesale electricity supply costs rise at a greater rate than the rates they charge to customers. The price of wholesale electricity supply purchases associated with the retail businesses' energy commitments can be different than that reflected in the rates charged to customers due to, among other factors:

Reworded

Potential disruptions from cyber/data and physical security breaches to "critical cyber assets" that interrupt the delivery of power to the Bulk Electric System could incur significant penalties of up to $1 million per violation for failure to comply with mandatory electric reliability standards by FERC under the Energy Policy Act of 2005.

Reworded

Although weWe take precautions to protect our infrastructure, but we have been, and will likely continue to be, subject to attempts at phishing and other cybersecurity intrusions. International conflict increases the risk of state-sponsored cyber threats and escalated use of cybercriminal and cyber-espionage activities. In particular, the current geopolitical climate has further escalated cybersecurity risk, with various government agencies, including the Federal Bureau of Investigation (FBI) and the U.S. Cybersecurity & Infrastructure Security Agency, issuing warnings of increased cyber threats, particularly for U.S. critical infrastructure. As of the date of this report, the Company has not identified a cyber/data event causing any material operational, reputational or financial impact. However, we recognize the growing threat within the general marketplace and our industry, especially as generative AI becomes more widely used by threat actors.actors There is no assurance thatand we willmay not be able to prevent or mitigate any such impacts in the future. In the event of a material cyber breach, critical operational capabilities to support our generation, commercial, or retail operations could be disrupted or lost. Additionally, customer, confidential, or proprietary data could be compromised, misused, or inappropriately disclosed. If critical operational capabilities or data were impacted, it could adversely affect our reputation, diminish customer confidence, expose us to legal or regulatory claims, impair our business strategy, or impact our results of operation or financial condition, which could have a material adverse effect on us. Our efforts to deter, identify, and mitigate future breaches may require additional, significant capital and operating costs and may not be successful.

Added

•inability to effectively complete nuclear power uprates on terms, cost, or schedule contemplated by current forecasts or customer agreements;

Reworded

•the costs of procuring nuclear fuel, including impacts from trade restrictions such as tariffs, embargoes, and quotas (see Item 7. Management's Discussion and Analysis of Financial Condition, and Results of Operations – SignificantBusiness ActivitiesEnvironment and Events, and Items Influencing Future Performance – Macroeconomic ConditionsOutlook);

Reworded

•Regulatory Risk. The NRC may modify, suspend or revoke licenses and impose civil penalties for failure to comply with the Atomic Energy Act, the regulations under it or the terms of the licenses of nuclear generation facilities. Unless extended, as to which no assurance can be given, the NRC operating license for the unit at the Perry Facility will expire in 2026, and is pending a license renewal application subject to review by the NRC. Changes in regulations by the NRC could require a substantial increase in capital expenditures or result in increased operating or decommissioning costs.

Reworded

TheDuring the prior administration, the EPA was directed by the Biden Administration to review a number of environmental rules adopted by the EPA during the first Trump Administration,rules, including the CCR rule, the ELG rule, the ACE rule and the particulate matter (PM), and NAAQS rules. All of these rules may significantly and adversely impact our existing coal fleet and may lead to accelerated plant closure timeframes. In addition, the new GHG rule and the PM2.5 NAAQS rule finalized in 2024 along with other NAAQS that may be issued in the future have the potential to adversely impact our natural gas-fired units. In January 2025, President Trump issued an executive Order, which among other things, requires the EPA to review many of the rules issued byduring the Biden Administration and further instructed thatauthorizes the U.S. Attorney General mayto request a stay of therelated litigation while the EPA conducts its review. As a result, the scope, timing, interpretation and enforcement of CCR and other environmental requirements remain subject to change.

Reworded

The EPA is reviewing applications submitted by us to extend closure deadlines for many of our CCR impoundments. The scope and cost of thatCCR pond closure work could increase significantly based on new or potential requirements imposed by the EPA or state agencies, including the EPA's interpretations on requirements for closure of CCR units. There is no assurance that ourOur current assumptions for closure activities willmay not be accepted by the EPA or state agencies. If ponds must be closed sooner than anticipated, plant closures timeframes may be accelerated.

Reworded

Technological advances in demand-side management, large-scale residential or commercial virtual power plants, and increased conservation efforts could result in a decrease in electricity demand. A significant decrease in electricity demand as a result of such efforts would significantly reduce the value of our generation assets. Certain regulatory and legislative bodies have introduced or are considering requirements and/or incentives to reduce power consumption. Effective power conservation by our customers could result in reduced electricity demand or significantly slow the growth in such demand. Any such reduction in demand could have a material adverse effect on us. Furthermore, we may incur increased capital expenditures if we are required to increase investment in conservation measures. Additionally, increased governmental and consumer focus on energy sustainability efforts, including desire for, or incentives related to, the development, implementation and usage of low-carbon technology, may result in decreased demand for the traditional generation technologies that we currently own and operate.

Showing the first 60 of 80 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

Management's Discussion & Analysis (MD&A) (10-K Item 7)

141new paragraphs
138removed paragraphs
13reworded paragraphs
10,975 → 10,329words in section

New heading “Key Financial Results”

New heading “Business Environment and Outlook”

New heading “Electricity Demand”

New heading “Supply Chain Constraints”

New heading “Russia/Ukraine Conflict”

New heading “Noteworthy Developments”

New heading “PJM Nuclear Power Purchase Agreements and Uprates”

New heading “Cogentrix Transaction”

New heading “Comanche Peak Power Purchase Agreement”

New heading “Nuclear Plant License Renewal”

New heading “Moss Landing 300 Incident”

New heading “Martin Lake Unit 1 Incident”

New heading “Factors Affecting Our Financial Condition and Results of Operations”

New heading “Commodity Prices”

New heading “Consolidated Results of Operations”

New heading “Results of Operations by Segment”

New heading “Asset Closure Segment”

New heading “Disaggregated Consolidated Statement of Operations Results”

New heading “Liquidity and Capital Resources”

New heading “Sources and Uses of Cash”

New heading “Interest Payments”

New heading “Commodity Purchase and Services Agreements”

New heading “Financial Covenants and Cross-Default Provisions”

Removed heading “Significant Activities and Events, and Items Influencing Future Performance”

Removed heading “Nuclear Plant License Renewals”

Removed heading “Moss Landing 300 Battery and Martin Lake Unit 1 Updates”

Removed heading “Financial and Operating Performance”

Removed heading “Macroeconomic Conditions”

Removed heading “Electricity Prices”

Removed heading “EBITDA and Adjusted EBITDA”

Removed heading “Vistra Consolidated Financial Results — Year Ended December 31, 2024 Compared to Year Ended December 31, 2023”

Removed heading “Asset Closure Segment — Year Ended December 31, 2024 Compared to Year Ended December 31, 2023”

Removed heading “Energy-Related Commodity Contracts and Mark-to-Market Activities”

Removed heading “Financial Condition”

Removed heading “Available Liquidity”

Removed heading “Financial Covenants”

Removed heading “Collateral Support Obligations”

Removed heading “Material Cross Default/Acceleration Provisions”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

New text topics: default, covenant
“Financial Covenants and Cross-Default Provisions”
see in full comparison
Removed text topics: default, fine, interest rate
“A default by BCOP or any of its subsidiary guarantors in respect of certain provisions defined in the applicable agreement may result in a cross default under the BCOP Credit Agreement. Such a default would allow the lenders under such facility to accelerate the maturity of outstanding balances under such facility. …”
see in full comparison
Removed text topics: default, fine, interest rate
“Each of Vistra Operations' (or its subsidiaries') commodity hedging agreements and interest rate swap agreements that are secured with a lien on its assets on a pari passu basis with the Vistra Operations Credit Facilities lenders contains a cross-default provision. …”
see in full comparison
Removed text topics: litigation, penalt, impairment
“In January 2025, a fire occurred at our Moss Landing 300 MW battery energy storage facility in CAISO. We are still investigating the cause and impacts, but expect to write off approximately $400 million of plant value to depreciation expense in the first quarter of 2025, representing the facility's remaining net book value. Moss Landing 300 is part of the Moss Landing complex, which includes two other battery facilities and a gas plant, with an aggregate book value of approximately $1 billion including Moss Landing 300. …”
see in full comparison
Removed text topics: supply chain, inflation, interest rate, labor
“The industry continues to experience supply chain constraints and labor shortages that have reduced the availability of certain equipment and supply relevant to construction of new generation facilities, and increased (i) the lead time to procure certain materials necessary to maintain, and (ii) the labor costs associated with maintenance activity on our natural gas, nuclear and coal fleet. …”
see in full comparison
Removed text topics: default
“Material Cross Default/Acceleration Provisions”
see in full comparison
Full comparison: every changed paragraph (292)

Green = added, red = removed. Unchanged paragraphs, 6 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

The following discussion and analysis of our financial condition and results of operations should be read together with the consolidated financial statements and related notes included in Item 8. Financial Statements and Supplementary Data. See Item 7. Management's Discussion and Analysis of Financial Condition, and Results of Operations in our 20232024 Form 10-K for a discussion of our financial condition and results of operations for the year ended December 31, 20222023 and for the year ended December 31, 20232024 compared to the year ended December 31, 2022,2023, which is incorporated here by reference. The Sunset segment was eliminated in the fourth quarter of 2024, resulting in the recast of results for four coal facilities to the East segment and one coal facility to the Texas segment (see Note 19 to the Financial Statements). The recast is reflected in the results of operations for the years ended December 31, 2024 and 2023. The re-segmentation did not result in a material change in the reported results for the East and Texas segments for the year ended December 31, 2023 compared to the year ended December 31, 2022.

Added

Key Financial Results

Added

•We continued to execute our integrated business model, delivering strong operational and financial performance while responding effectively to market opportunities. Our ability to combine a diversified and dependable generation fleet with a scaled retail platform and disciplined wholesale risk management capabilities remains a core competitive advantage and supports more stable and predictable cash flows across commodity price cycles.

Added

•Long-term contracts entered in 2025 underwrite higher base profitability in the future.

Added

◦In September 2025, we announced that we had entered into a 20-year power purchase agreement (PPA) (with options to extend for up to an additional 20 years) with Amazon Web Services (AWS) to supply 1,200 MW of carbon-free power from our Comanche Peak Nuclear Power Plant. We anticipate power delivery to begin in the fourth quarter of 2027 and ramp to full capacity by 2032.

Added

◦In January 2026, we announced that we had entered into 20-year PPAs with Meta Platforms, Inc. (Meta) to supply 2,609 MW of carbon-free power and capacity from our PJM nuclear power plants, including 2,176 MW of operating energy and capacity and 433 of uprate energy and capacity to be constructed. We anticipate commencing delivery on a portion of the operating energy and capacity in late 2026 and full delivery by year end 2027. We anticipate commencing delivery on a portion of the uprate energy and capacity by 2031 and full delivery by year end 2034.

Added

•Executed disciplined capital allocation through targeted natural gas expansion, including the development of an 860 MW facility in West Texas and the acquisition of 2,600 MW of natural gas generation capacity from Lotus.

Added

•In December 2025, we executed definitive agreements to acquire Cogentrix Energy, consisting of 10 natural gas generation facilities totaling approximately 5,500 MW of capacity. The transaction is expected to close in mid-to-late 2026.

Added

•During the year ended December 31, 2025, we paid dividends to common stockholders totaling $306 million.

Added

•In October 2025, the Board authorized an incremental amount of $1.0 billion under our stock repurchase program established in October 2021. During the year ended December 31, 2025, we repurchased 6.6 million shares for approximately $1.0 billion under the program. Through February 18, 2026, total shares repurchased under the program totaled 167 million shares for $5.9 billion, and we have $1.8 billion available for additional repurchases under the program.

Added

•In December 2025, S&P raised its issuer credit rating on Vistra to investment grade from BB+ to BBB-.

Added

•We further diversified our sources of liquidity and improved associated borrowing costs and credit terms through a number of enhancements and amendments to our facilities throughout the year, including (i) extending the maturity of the Commodity-Linked Facility to September 2026, (ii) increasing the commitment cap under the alternative letter of credit facility from $500 million to $800 million, and (iii) expanding and extending the Receivables Facility purchase limit by $100 million and extended the term to July 2026.

Added

•In October 2025, we issued $750 million of 4.300% senior secured notes due 2028, $500 million of 4.600% senior secured notes due 2030, and $750 million of 5.250% senior secured notes due 2035. The net proceeds from these issuances were used to refinance senior unsecured debt maturities in September 2026 and for general corporate purposes, including to fund a portion of the Lotus Acquisition.

Added

•Planned uprates at the Company's operating Perry Nuclear Power Plant (Perry), Davis-Besse Nuclear Power Plant (Davis-Besse), and Beaver Valley Nuclear Power Plant (Beaver Valley) would add 433 MW of incremental carbon-free nuclear energy and capacity to the PJM region commencing delivery on a portion of the uprate energy and capacity by 2031 and full delivery of the uprate energy and capacity by year end 2034.

Added

•We reached commercial operations at the Oak Hill solar facility in Texas totaling 200 MW of capacity and continued development and construction activities on additional facilities at retired or to-be-retired plant sites in Illinois.

Added

•We announced plans to repower the Coleto Creek and Miami Fort coal generation facilities as natural gas-fueled facilities upon their retirement no later than 2027 and the middle of 2028, respectively.

Added

Business Environment and Outlook

Added

Electricity Demand

Added

Electricity demand drivers including the rise of large scale data centers, the electrification of oil field operations, and electric vehicle load building are contributing to a projected fast paced load growth in the regions we serve. Our integrated retail electricity and power generation operations allows us to quickly respond to electricity demand changes. To support growing demand from large‑scale electricity consumers, we continue to engage in discussions with various counterparties regarding the potential long-term sale of power from our generation facilities, and we are progressing a series of development initiatives across our generation portfolio, including nuclear uprates and other capacity expansions.

Added

Supply Chain Constraints

Added

Our industry continues to face ongoing supply chain constraints and labor shortages, which have reduced the availability of essential equipment and supplies for constructing new generation facilities, increased the lead times for procuring materials, and raised labor costs associated with maintaining our natural gas, nuclear, and coal fleet.

Added

We are proactively managing these constraints by continuously re-evaluating the business cases and timing of our planned development projects. This has led to the deferral or abandonment of some planned capital expenditures for our solar and battery projects and could impact the economic feasibility of additional projects in our new generation development pipeline. We are engaging with suppliers to secure key materials needed to maintain our existing generation facilities before future planned outages.

Added

Russia/Ukraine Conflict

Added

We are closely monitoring developments in the Russia and Ukraine conflict, specifically sanctions (or potential sanctions) against Russian energy exports and Russian nuclear fuel supply and enrichment activities, and actions by Russia to limit energy deliveries, which may further impact commodity prices in Europe and globally. The Prohibiting Russian Uranium Imports Act (PRUI Act), which was signed into law on August 11, 2024, prohibits importation of Russian uranium; however, the DOE can issue waivers (subject to decreasing annual caps) until December 31, 2027 if there is no alternate source of low-enriched uranium available to keep U.S. nuclear reactors operating or is in the national interest. Additionally, passage of the PRUI Act enabled the allocation of $2.72 billion in federal funding to ramp up production of domestic uranium fuel. On November 15, 2024, the Russian Federation temporarily suspended shipments of uranium to the U.S., stating that they would grant future export licenses on a case-by-case basis.

Added

Our 2026 refueling plans have not been affected by the Russia and Ukraine conflict, nor have we seen any disruption to the delivery of nuclear fuel impacting our refueling schedules. All nuclear fuel requirements for 2026 are either in inventory or are onshore. We work with a diverse set of global nuclear fuel cycle suppliers to procure our nuclear fuel years in advance. We have nuclear fuel contracted to support all our refueling needs through 2030 without any additional Russian deliveries. We continue to take affirmative action by building strategic inventory and deploying mitigating strategies in our procurement portfolio to ensure we can secure the nuclear fuel needed to continue to operate our nuclear facilities through potential Russian supply disruption.

Added

Noteworthy Developments

Added

PJM Nuclear Power Purchase Agreements and Uprates

Added

In January 2026, Vistra announced it had entered into 20-year PPAs with Meta, pursuant to which the Company has agreed to supply Meta with a total of 2,609 MW of carbon-free power and capacity from the Company's PJM nuclear power plants as follows:

Added

•1,268 MW of energy and capacity from Perry and 908 MW of energy and capacity from Davis-Besse; and

Added

•213 MW of uprate energy and capacity from Perry, 80 MW of uprate energy and capacity from Davis-Besse, and 140 MW of uprate energy and capacity from Beaver Valley.

Added

Under the terms of the PPAs, the Company anticipates commencing delivery on a portion of the operating energy and capacity in late 2026 and full delivery of the operating energy and capacity by year end 2027. Additionally, the Company anticipates commencing delivery on a portion of the uprate energy and capacity by 2031 and full delivery of the uprate energy and capacity by year end 2034. To achieve the uprates, the Company expects to incur capital expenditures commencing in 2026 and extending through 2034, with less than 20% of the aggregate spend projected to occur by year end 2028. The timing and amount of our planned uprate expenditures will depend on a range of factors, including regulatory approvals, engineering evaluations and capital allocation decisions.

Added

Cogentrix Transaction

Added

On December 31, 2025, Vistra executed definitive agreements to acquire Cogentrix Energy which consists of 10 modern natural gas generation facilities totaling approximately 5,500 MW of capacity (Cogentrix Transaction). The facilities include three combined cycle gas turbine facilities and two combustion turbine facilities located across PJM, four combined cycle gas turbine facilities in ISO-NE, and one cogeneration facility in ERCOT.

Added

Aggregate consideration at closing will consist of approximately (i) $2.3 billion in cash, net of adjustments for the assumption of an estimated $1.5 billion of outstanding indebtedness of Cogentrix as of the closing date, and (ii) 5,000,000 shares of Vistra common stock, par value $0.01, to be issued to the seller, at a mutually agreed-upon value of $185 per share.

Added

Consummation of the Cogentrix Transaction is subject to customary closing conditions, including receipt of all requisite regulatory approvals, including approvals of FERC and the expiration or termination of all applicable waiting periods under the Hart-Scott-Rodino Antitrust Improvements Act of 1976. The Cogentrix Transaction is expected to close in mid-to-late 2026.

Added

On October 22, 2025, pursuant to a purchase and sale agreement dated May 15, 2025, Vistra Operations acquired 100% of the membership interests of certain subsidiaries of Lotus (Lotus Acquisition). The Lotus Acquisition resulted in the addition of seven natural gas generation facilities totaling 2,600 MW in Delaware and Pennsylvania (PJM), Rhode Island (ISO-NE), New York (NYISO), and California (CAISO), further geographically diversifying Vistra's natural gas fleet.

Added

The aggregate purchase price consisted of a base purchase price of $1.9 billion, subject to certain customary adjustments, including the acquired companies' working capital, cash, indebtedness, and certain other adjustments. Vistra Operations funded the Lotus Acquisition with a combination of cash and the assumption of the acquired companies' indebtedness which consisted of a senior secured credit facility, including an existing term loan with approximately $800 million principal outstanding, which reduced the cash consideration payable at closing. Cash consideration payable at closing, excluding adjustments for the acquired companies' working capital, cash, and certain other adjustments, was $1.1 billion. See Note 2 to the Financial Statements for additional information.

Added

Comanche Peak Power Purchase Agreement

Added

In September 2025, Vistra announced that it had entered into a 20-year PPA (with options to extend for up to an additional 20 years) with AWS, pursuant to which we have agreed to supply to AWS 1,200 MW of carbon-free power from the Comanche Peak Nuclear Power Plant. Vistra anticipates power delivery to begin in the fourth quarter of 2027 and ramp to full capacity by 2032.

Added

Nuclear Plant License Renewal

Added

In July 2025, our application for license renewal at our Perry Nuclear Plant was approved by the NRC. The license now extends through 2046.

Added

OBBBA and CAMT

Added

In July 2025, the legislation known as the OBBBA was signed into law and we have accounted for the effects in our consolidated financial statements. Key changes include the immediate expensing of domestic research and development costs, the reinstatement of 100% bonus depreciation, and increases in the limitation of interest deductibility. Certain provisions of the OBBBA will change the timing of cash tax payments in the current fiscal year and future year periods, however the legislation did not have a material impact on our consolidated financial statements. We do not expect Vistra to be subject to the corporate alternative minimum tax (CAMT) in the 2025 tax year as it applies only to corporations with a three-year average annual adjusted financial statement income in excess of $1 billion. We have taken the CAMT and forecasted OBBBA impacts into account when forecasting cash taxes.

Added

Moss Landing 300 Incident

Added

On January 16, 2025, we detected a fire at our Moss Landing 300 MW energy storage facility at the Moss Landing Power Plant site (the Moss Landing Incident) that resulted in ceasing operations at all facilities at the Moss Landing complex until the fire was contained. No injuries occurred due to the fire or the Company's response. The Moss Landing complex includes two other battery facilities and a gas plant. The gas plant returned to service in February 2025. The Moss Landing 350 MW battery facility has a net book value of approximately $320 million as of December 31, 2025. We are working towards a return to service in mid-2026, but we will continue to evaluate our restart plans following completion of our investigation into the cause of the fire. After further consideration, management determined it would not return the Moss Landing 100 MW battery to service.

Added

As a result of the damage caused by the Moss Landing Incident, during the three months ended March 31, 2025, we wrote-off the net book value of Moss Landing 300 of approximately $400 million to depreciation expense and moved the asset to the Asset Closure segment as we have no plans to return the Moss Landing 300 facility to operations. See Notes 7 and 21 to the Financial Statements for additional information.

Added

As a result of the decision to not return the Moss Landing 100 MW battery to service, we performed an assessment of the recoverability of the facility's carrying value and, during the three months ended December 31, 2025, we recognized an impairment loss of approximately $155 million and moved the asset to the Asset Closure segment (see Notes 7 and 21 to the Financial Statements for additional information.

Added

In July 2025, we entered into an Administrative Settlement Agreement and Order on Consent (ASAOC) with the EPA related to the Moss Landing 300 site. Under the ASAOC, we are required to perform specific battery removal and remediation activities, including battery removal and disposal, building demolition, and air and water monitoring. We estimate the total cost of these activities to be approximately $110 million. We have incurred expenses of approximately $49 million on ASAOC activities through December 31, 2025. As of December 31, 2025, our accrual for estimated future costs for the ASAOC activities is approximately $61 million, which is reflected in other current liabilities in the consolidated balance sheets. This estimate assumes the ASAOC activities will be completed by the end of 2026. Aside from battery removal and disposal, our estimate does not reflect costs associated with removal of other hazardous waste that could be identified as the demolition progresses as we are unable to estimate such costs until sampling of waste material is complete. We will account for any adjustments to the accrual as a change in estimate in the period new information becomes available.

Added

Additional impacts from the Moss Landing Incident include loss of revenue from the facilities being offline and may include litigation costs, other negotiated settlements of contracts with counterparties, and additional non-cash impairment losses. We are currently unable to estimate the full impact the Moss Landing Incident will have on us as our estimate will evolve as demolition progresses. See Note 18 to the Financial Statements for additional information.

Added

We have filed insurance claims against applicable insurance policies with combined business interruption and property loss limits of $500 million, net of deductibles, of which approximately $500 million has been collected through February 2026. See Note 8 to the Financial Statements for additional information. While we expect future revenues in the West segment to decrease relative to 2024 revenues with the Moss Landing 300 and 100 MW battery facilities not returning to service, given the uncertainty in the timing of the restart of the Moss Landing 350 MW battery facility and additional expenses that could be incurred related to the Moss Landing Incident, we cannot predict the full impact this event will have on our 2026 financial statements.

Added

Martin Lake Unit 1 Incident

Added

On November 27, 2024, we experienced a fire at Unit 1 of our Martin Lake facility in ERCOT (the Martin Lake Incident), an 815 MW unit. We wrote-off the unit's net book value of less than $1 million to depreciation expense in December 2024. The unit returned to service in February 2026. We estimate total cash capital expenditures required to restore the unit to service was approximately $384 million, of which approximately $271 million in cash capital expenditures have been incurred as of December 31, 2025.

Added

We expect to recover a majority of the expenditures associated with the Martin Lake Incident through property damage insurance and to receive additional business interruption proceeds. See Note 8 to the Financial Statements for additional information. Given uncertainty in timing of remaining insurance recoveries, we cannot predict the full impacts this event will have on our 2026 financial statements.

Removed

Significant Activities and Events, and Items Influencing Future Performance

Removed

On March 1, 2024 (Merger Date), pursuant to a transaction agreement dated March 6, 2023 (Transaction Agreement), (i) Vistra Operations transferred certain of its subsidiary entities into Vistra Vision, (ii) Black Pen Inc., a wholly owned subsidiary of Vistra, merged with and into Energy Harbor, (iii) Energy Harbor became a wholly-owned subsidiary of Vistra Vision, and (iv) affiliates of Nuveen Asset Management, LLC (Nuveen) and Avenue Capital Management II, L.P. (Avenue) exchanged a portion of the Energy Harbor shares held by Nuveen and Avenue for a 15% equity interest of Vistra Vision (collectively, Energy Harbor Merger). The Energy Harbor Merger combined Energy Harbor's and Vistra's nuclear and retail businesses and certain Vistra Zero renewables and energy storage facilities to provide diversification and scale across multiple carbon-free technologies (dispatchable and renewables/storage) and the retail business. The cash consideration for Energy Harbor Merger was funded by Vistra Operations using a combination of cash on hand and borrowings under the Commodity-Linked Facility, the Receivables Facility and the Repurchase Facility. See Note 2 to the Financial Statements.

Reworded

On September 18, 2024 (the UPA Transaction Date), Vistra Operations and Vistra Vision Holdings I LLC, an indirect subsidiary of Vistra Operations (Vistra Vision Holdings), entered into separate Unit Purchase Agreements (as amended, the UPAs) with each of Nuveen and Avenue, pursuant to which Vistra Vision Holdings agreed to purchase each of Nuveen's and Avenue's combined 15% noncontrolling interest in Vistra Vision for approximately $3.2 billion in cash (collectively, the Transaction). The Transaction closed on December 31, 2024 (the Closing Date) and Vistra Vision Holdings now owns 100% of the equity interests in Vistra Vision. See NoteNotes 92 and 11 to the Financial Statements.Statements for additional information.

Removed

Nuclear Plant License Renewals

Removed

In July 2024, our application for license renewal at our two-unit Comanche Peak Nuclear Plant was approved by the NRC. The licenses for Units 1 and 2 now extend into 2050 and 2053, respectively, an additional 20 years beyond our original licenses.

Removed

In 2023, the Perry Nuclear Plant filed a license extension application to operate through 2046, an additional 20 years beyond the existing license. A decision from the NRC is expected in late 2025.

Added

In July 2024, we filed applications with the PUCT under the Texas Energy Fund loan program seeking financing for the 860 MW of new advanced simple-cycle peaking plants referenced above. Both projects were selected for due diligence as part of the Texas Energy Fund loan program. An invitation to due diligence does not mean an applicant is awarded a loan. Due diligence is progressing and we are in the final stages.

Showing the first 60 of 292 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

What changed in the latest 10-Q

Comparing 10-Q filed 2026-08-10 (period ending 2026-06-30) with 10-Q filed 2026-05-08 (period ending 2026-03-31).

Risk Factors (10-Q Part II, Item 1A)

0new paragraphs
0removed paragraphs
0reworded paragraphs
62 → 62words in section

The section in the latest 10-Q reads in full:

As of the date of this Quarterly Report on Form 10-Q, there have been no material changes to the risk factors discussed in Part I, Item 1A. Risk Factors in our 2025 Form 10-K. We could also be affected by additional factors that are not presently known to us or that we currently consider to be immaterial to our operations.

No wording changes found in this section.

Full comparison: every changed paragraph (0)

Green = added, red = removed. Unchanged paragraphs and tables are not shown. Read the complete text in the original filing.

Management's Discussion & Analysis (MD&A) (10-Q Part I, Item 2)

38new paragraphs
10removed paragraphs
49reworded paragraphs
5,807 → 6,992words in section

New heading “Capacity Markets — PJM Auction Results”

New heading “Strategic Investment in Digital Infrastructure”

New heading “Gas Plants Disposition”

New heading “Six Months Ended June 30, 2026 Compared to the Six Months Ended June 30, 2025”

Removed heading “Russia/Ukraine Conflict”

Largest changes (selected automatically by length and topic keywords; quoted verbatim, no commentary)

Removed text topics: sanction, russia, ukraine
“We are monitoring developments in the Russia and Ukraine conflict, specifically sanctions (or potential sanctions) against Russian nuclear fuel supply and enrichment activities which may further impact commodity prices in Europe and globally. The Prohibiting Russian Uranium Imports Act (PRUI Act), which was signed into law on August 11, 2024, prohibits importation of Russian uranium; however, the Department of Energy can issue waivers (subject to decreasing annual caps) until December 31, 2027 if there is no alternate source of low-enriched uranium available to keep U.S. …”
see in full comparison
Removed text topics: russia, ukraine
“Russia/Ukraine Conflict”
see in full comparison
Removed text topics: russia, ukraine
“Our 2026 and 2027 refueling plans have not been affected by the Russia and Ukraine conflict, nor have we seen any disruption to the delivery of nuclear fuel impacting our refueling schedules. All nuclear fuel requirements for 2026 and 2027 is onshore and in our inventory. We work with a diverse set of global nuclear fuel cycle suppliers to procure our nuclear fuel years in advance. We have nuclear fuel contracted to support all our refueling needs through 2030 without any additional Russian deliveries. …”
see in full comparison
New text
“Six Months Ended June 30, 2026 Compared to the Six Months Ended June 30, 2025”
see in full comparison
New text
“Strategic Investment in Digital Infrastructure”
see in full comparison
New text
“Capacity Markets — PJM Auction Results”
see in full comparison
Full comparison: every changed paragraph (97)

Green = added, red = removed. Unchanged paragraphs, 11 paragraphs where only numbers/dates changed, and tables are not shown. Read the complete text in the original filing.

Reworded

Electricity demand drivers including the rise of large scale data centers, the electrification of oil field operations, and electric vehicle load building are contributing to a projected fast pacedfast-paced load growth in the regions we serve. Our integrated retail electricity and power generation operations allowsallow us to quickly respond to electricity demand changes. To support growing demand from large‑scale electricity consumers, we continue to engage in discussions with various counterparties regarding the potential long-term sale of power from our generation facilities, and we are progressing a series of development initiatives across our generation portfolio, including nuclear uprates and other capacity expansions.

Reworded

Our industry continues to face ongoing supply chain constraints and labor shortages, which have reduced the availability of essential equipment and supplies for constructing new generation facilities, increased the lead times for procuring materials, and raised equipment and labor costs associated with maintaining our natural gas, nuclear, and coal fleet.

Removed

Russia/Ukraine Conflict

Removed

We are monitoring developments in the Russia and Ukraine conflict, specifically sanctions (or potential sanctions) against Russian nuclear fuel supply and enrichment activities which may further impact commodity prices in Europe and globally. The Prohibiting Russian Uranium Imports Act (PRUI Act), which was signed into law on August 11, 2024, prohibits importation of Russian uranium; however, the Department of Energy can issue waivers (subject to decreasing annual caps) until December 31, 2027 if there is no alternate source of low-enriched uranium available to keep U.S. nuclear reactors operating or is in the national interest. Additionally, passage of the PRUI Act enabled the allocation of $2.72 billion in federal funding to ramp up production of domestic uranium fuel. On November 15, 2024, the Russian Federation temporarily suspended shipments of uranium to the U.S., stating that they would grant future export licenses on a case-by-case basis.

Removed

Our 2026 and 2027 refueling plans have not been affected by the Russia and Ukraine conflict, nor have we seen any disruption to the delivery of nuclear fuel impacting our refueling schedules. All nuclear fuel requirements for 2026 and 2027 is onshore and in our inventory. We work with a diverse set of global nuclear fuel cycle suppliers to procure our nuclear fuel years in advance. We have nuclear fuel contracted to support all our refueling needs through 2030 without any additional Russian deliveries. We continue to take affirmative action by building strategic inventory and deploying mitigating strategies in our procurement portfolio to ensure we can secure the nuclear fuel needed to continue to operate our nuclear facilities through potential Russian supply disruption.

Added

Capacity Markets — PJM Auction Results

Added

In July 2026, Vistra received its results from the PJM Capacity Auction for planning year 2028-2029, and the table below lists clearing price per MW-day and our cleared capacity volumes by zone:

Added

Strategic Investment in Digital Infrastructure

Added

In June 2026, the Company entered into a limited partnership agreement governing KKR Helix C L.P. (the Helix Fund), an open-ended investment fund managed by affiliates of KKR & Co. Inc. (KKR). As a founding investor in the Helix Fund, the Company committed up to $1 billion consisting of (i) an initial $500 million commitment and (ii) an additional $500 million commitment subject to the Helix Fund meeting certain commercial power supply milestones for our existing generation assets or, at the Company's election, regardless of whether such milestones are achieved.

Added

The Helix Fund will seek to invest in and manage assets critical to enabling artificial intelligence (AI), including hyperscale data center development and operations; baseload and flexible power generation; transmission and distribution infrastructure; and fiber and connectivity infrastructure, among other assets. This investment reflects our strategy to participate in the growing demand for power generation assets supporting hyperscale data center development, while leveraging our existing fleet and development capabilities.

Added

Gas Plants Disposition

Added

In June 2026, Vistra Operations entered into a purchase and sale agreement for the sale of our Casco Bay, Beaver Falls, and Syracuse natural gas generation facilities (the Disposal Group). The transaction is expected to close in the second half of 2026, subject to customary closing conditions, including receipt of applicable regulatory approvals. The related assets and liabilities of the Disposal Group were classified as held for sale as of June 30, 2026 and are reported in the East segment. See Note 2 to the Financial Statements for additional information.

Added

•Repowering the coal-fueled Coleto Creek Power Plant near Goliad, Texas, set to retire in 2026 to comply with EPA rules, as a natural-gas-fueled plant with up to 600 MW of capacity.

Added

•Completing upgrades at existing natural-gas-fueled plants that will add more than 500 MW of summer capacity and 100 MW of winter capacity.

Added

In June 2026, Permian Power entered into a $583 million loan agreement with the Texas Energy Fund (TxEF) to finance the development of the 860 MW peaking plant in west Texas (TxEF Loan). The loan is non-recourse to Vistra, and interest on the TxEF Loan is calculated at a fixed rate of 3.0% per annum. As of June 30, 2026, $172 million was outstanding under the agreement.

Reworded

On December 2, 2025, S&P upgraded Vistra Operations' issuer credit rating from BB+ to BBB- and revised its outlook from Positive to Stable, and on March 20, 2026, S&P upgraded the Senior Unsecured Notes rating from BB+ to BBB-. On March 16, 2026, Fitch upgraded Vistra Operations' issuer default rating and the Senior Unsecured Notes rating from BB+ to BBB- and revised its outlook from Positive to Stable. As a result of these investment-grade ratings and the satisfaction of certain other conditions specified in the Vistra Operations Senior Secured Indenture, an investment gradeinvestment-grade event was deemed to have occurred, and the liens on the collateral securing the Senior Secured Notes were automatically terminated and released in full on April 2, 2026 (Indenture Collateral Release).

Reworded

The Indenture Collateral Release represents the elimination of the collateral and related lien provisions under the Vistra Operations Senior Secured Indenture only and did not modify, refinance, extinguish, or otherwise change the outstanding principal amount, maturity, interest rates, or other material terms of the Senior Secured Notes. Following the Indenture Collateral Release, the Senior Secured Notes are effectively unsecured and rank pari passu with the Senior Unsecured Notes. The Indenture Collateral Release is subject to reversion if the applicable rating agencies withdraw the investment-grade ratings or downgrade the ratings below investment grade, subject to a 60-day grace period.

Reworded

Additionally, Vistra Operations repaid $2.444 billion in outstanding borrowings under the Term Loan B-3 facility in April 2026, and in coordination with the investment-grade ratings, met the collateral suspension provisions of the Vistra Operations Credit Agreement and Commodity-Linked Credit Agreement releasing all liens securing the Vistra Operations Credit Facilities and the Vistra Operations Commodity-Linked Credit Facility (Credit Facility Collateral SuspensionRelease). The Vistra Operations Credit Agreement and Vistra Operations Commodity-Linked Credit Facility Collateralwere Suspensionamended isin subjectJune 2026 to, among other things, remove the collateral reinstatement requirements applicable to reversionthe ifVistra Operations Credit Agreement and the applicableVistra ratingOperations agenciesCommodity-Linked withdrawCredit Facility. The Vistra Operations Credit Agreement was also amended to release each guarantor from its guarantee to the investment-gradeextent ratingsrelated or downgradeto the ratingsrevolving belowcredit investmentloans, grade,revolving subjectcredit commitments, letters of credit, letters of commitments and/or secured cash management agreements, in each case, under the Vistra Operations Credit Agreement. The Vistra Operations Commodity-Linked Credit Facility was amended to arelease 60-dayeach graceguarantor period.from its guarantee.

Reworded

Consummation of the Cogentrix Transaction is subject to customary closing conditions, including receipt of all requisite regulatory approvals, including approvals of FERC and the expiration or termination of all applicable waiting periods under the Hart-Scott-Rodino Antitrust Improvements Act of 1976. In August 2026, we received FERC approval. The Cogentrix Transaction is expected to close in the second half oflate 2026.

Reworded

The aggregate purchase price consisted of a base purchase price of $1.9 billion, subject to certain customary adjustments, including the acquired companies' working capital, cash, indebtedness, and certain other adjustments. Vistra Operations funded the Lotus Acquisition with a combination of cash and the assumption of the acquired companies' indebtedness which consisted of a senior secured credit facility, including an existing term loan with approximately $800 million principal outstanding, which reduced the cash consideration payable at closing. Cash consideration payable at closing, excluding adjustments for the acquired companies' working capital, cash, and certain other adjustments of $137 million,adjustments, was $1.1 billion. See Note 2 to the Financial Statements for additional information.

Reworded

In September 2025, Vistra announced that we entered into a 20-year PPA (with options to extend for up to an additional 20 years) with AWS,Amazon Web Services (AWS), pursuant to which we agreed to supply AWS 1,200 MW of carbon-free power from the Comanche Peak Nuclear Power Plant. Vistra anticipates power delivery to begin in the fourth quarter of 2027 and ramp to full capacity by 2032.

Removed

OBBBA and CAMT

Removed

In July 2025, the legislation known as the OBBBA was signed into law and we have accounted for the effects in our consolidated financial statements. Key changes include the immediate expensing of domestic research and development costs, the reinstatement of 100% bonus depreciation, and increases in the limitation of interest deductibility. Certain provisions of the OBBBA will change the timing of cash tax payments in the current fiscal year and future year periods, however the legislation did not have a material impact on our consolidated financial statements. We do not expect Vistra to be subject to the corporate alternative minimum tax (CAMT) in the 2026 tax year. We have taken the CAMT and forecasted OBBBA impacts into account when forecasting cash taxes.

Reworded

On January 16, 2025, we detectedexperienced a fire at our Moss Landing 300 MW energy storage facility at the Moss Landing Power Plant site (the Moss Landing Incident) that resulted in ceasing operations at all facilities at the Moss Landing complex until the fire was contained. No injuries occurred due to the fire or the Company's response. See Note 89 to the Financial Statements for additional information.

Reworded

On November 27, 2024, we experienced a fire at Unit 1 of our Martin Lake facility in ERCOT (the Martin Lake Incident), an 815 MW unit. We wrote-offwrote off the unit's net book value of less than $1 million to depreciation expense in December 2024. The unit returned to service in February 2026. See Note 89 to the Financial Statements for additional information.

Removed

•Repowering the coal-fueled Coleto Creek Power Plant near Goliad, Texas, set to retire in 2027 to comply with EPA rules, as a natural-gas fueled plant with up to 600 MW of capacity.

Removed

•Completing upgrades at existing natural gas-fueled plants that will add more than 500 MW of summer capacity and 100 MW of winter capacity.

Removed

In July 2024, we filed applications with the PUCT under the Texas Energy Fund loan program seeking financing for the 860 MW of new advanced simple-cycle peaking plants referenced above. Both projects were selected for due diligence as part of the Texas Energy Fund loan program. An invitation to due diligence does not mean an applicant is awarded a loan. Due diligence is progressing and we are in the final stages.

Reworded

In August 2022, the U.S. enacted the IRA, which, among other things, implements substantial new and modified energy tax credits, including recognizing the value of existing carbon-free nuclear power by providing for a nuclear PTC, a solar PTC, new technology-neutral ITCs and PTCs that apply to various different clean energy technologies, and a first-time stand-alone battery storage ITC. The IRA also implements a 15% corporate alternative minimum tax (CAMT) on book income of certain large corporations, and a 1% excise tax on net stock repurchases. The section 45U nuclear PTC is available to existing nuclear facilities from 2024 through 2032 and provides a federal tax credit of up to $15 per MWh, subject to an annually inflated gross-receipts based phase out. As discussed in Note 5 to the Financial Statements in our 2025 Form 10-K, we recognized transferable nuclear PTC revenues of $220 million and $545 million in the years ended December 31, 2025 and 2024, respectively. U.S. Treasury regulations are expected to further define the scope of the legislation in many important respects, including interpretive guidance on the definition of gross receipts for the nuclear PTC. Any interpretive guidance on the definition of gross receipts that differs from the interpretation used in our estimates could result in a material change to PTC revenues recorded in 2024 and 2025 and would be reflected as a change in estimate in the period in which the guidance is received.

Reworded

Estimated hedging levels for generation volumes in our Texas, East, and West segments as of MarchJune 31,30, 2026 were as follows:

Reworded

To illustrate the impact of weather variability on our operating results, the following table presents cooling and heating degree days relative to normal levels by segment in the three and six months ended MarchJune 31,30, 2026 and 2025.

Reworded

The tables and discussion that followsfollow present period‑over‑period changes in our results of operations and highlight the primary drivers of those variances for the periods presented.

Reworded

Three Months Ended MarchJune 31,30, 2026 Compared to the Three Months Ended MarchJune 31,30, 2025

Reworded

The following table presents Net income (loss), EBITDA and Adjusted EBITDA for the three months ended MarchJune 31,30, 2026:

Reworded

(a)Corporate and Other includes $16$9 million of unrealized mark-to-market net gainslosses on interest rate swaps.

Reworded

(c)Includes revenuesinvoluntary conversion gain recognized from MossMartin LandingLake Incident businessproperty interruptiondamage proceedsinsurance in the Asset ClosureTexas segment.

Reworded

The following table presents Net income (loss), EBITDA and Adjusted EBITDA for the three months ended MarchJune 31,30, 2025:

Added

(c)Includes involuntary conversion gain recognized from Martin Lake Incident property damage insurance in the Texas segment and revenues from Moss Landing Incident business interruption proceeds in the Asset Closure segment.

Reworded

(cd)Includes,Includes NDT (income) loss of the PJM nuclear facilities, ARO and environmental remediation expenses, and other expenses associated with the Moss Landing Incident.

Added

(e)Includes the final application of bill credits to large commercial and industrial customers that curtailed their usage during Winter Storm Uri in the Retail segment.

Added

Six Months Ended June 30, 2026 Compared to the Six Months Ended June 30, 2025

Added

The following table presents Net income (loss), EBITDA and Adjusted EBITDA for the six months ended June 30, 2026:

Added

(a)Corporate and Other includes $7 million of unrealized mark-to-market net gains on interest rate swaps.

Added

(b)Includes nuclear fuel amortization of $66 million and $176 million, respectively, in the Texas and East segments.

Added

(c)Includes involuntary conversion gain recognized from Martin Lake Incident property damage insurance in the Texas segment and revenues from Moss Landing Incident business interruption proceeds in the Asset Closure segment.

Added

(d)Includes NDT (income) loss of the PJM nuclear facilities, ARO and environmental remediation expenses, and other expenses associated with the Moss Landing Incident.

Added

The following table presents Net income (loss), EBITDA and Adjusted EBITDA for the six months ended June 30, 2025:

Added

(a)Corporate and Other includes $74 million of unrealized mark-to-market net losses on interest rate swaps.

Added

(b)Includes nuclear fuel amortization of $61 million and $176 million, respectively, in the Texas and East segments.

Added

(c)Includes involuntary conversion gain recognized from Martin Lake Incident property damage insurance in the Texas segment and revenues from Moss Landing Incident business interruption proceeds in the Asset Closure segment.

Added

(d)Includes NDT (income) loss of the PJM nuclear facilities, ARO and environmental remediation expenses, and other expenses associated with the Moss Landing Incident.

Added

(e)Includes the final application of bill credits to large commercial and industrial customers that curtailed their usage during Winter Storm Uri in the Retail segment.

Reworded

Net income for the three months ended MarchJune 31,30, 2026 compared to the three months ended MarchJune 31,30, 2025 increaseddecreased by $1.297$22 billion.million. Adjusted EBITDA for the three months ended MarchJune 31,30, 2026 compared to the three months ended MarchJune 31,30, 2025 increased by $259$412 million. The primary drivers for the increase in net income and the increase in Adjusted EBITDA include:

Added

Net income for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 increased by $1.275 billion. Adjusted EBITDA for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 increased by $671 million.

Added

The primary drivers for the changes in net income and Adjusted EBITDA include:

Reworded

The following section presents the results of operations and net income (loss) of Vistra's reportable business segments. See Note 1819 of the Financial Statements for a discussion of the Company's segments as defined under the accounting standards for segment reporting.

Reworded

For the three months ended June 30, 2026 compared to three months ended June 30, 2025, Retail net income decreasedincreased primarily due to a $1.762$580 billionmillion increasedecrease in unrealized mark-to-market losses on commodity derivative positionspositions, and a decrease inhigher retail margins primarilydriven dueby tohigher ancontractual increaserates, inpartially excessoffset volumes sold at lower wholesale prices andby a slight decrease in customer consumption due to milder weather.

Added

For the six months ended June 30, 2026 compared to the six months ended June 30, 2025, Retail net income decreased due to a $1.2 billion increase in unrealized mark-to-market losses on commodity derivative positions, a decrease in retail margins primarily due to an increase in excess volumes sold at lower wholesale prices and a decrease in customer consumption due to weather.

Reworded

For the three months ended June 30, 2026 compared to three months ended June 30, 2025, Texas net income increaseddecreased primarily due to a $2.752$453 billionmillion increasedecrease in unrealized mark-to-market gains on commodity derivative positionspositions, andpartially offset by higher energy margins.margins from optimizing the dispatch of select gas units in response to favorable market conditions and Martin Lake Unit 1 return to service.

Added

For the six months ending June 30, 2026 compared to six months ended June 30, 2025, Texas net income increased primarily due to a $2.3 billion increase in unrealized mark-to-market gains on commodity derivative positions and higher energy margins from optimizing the dispatch of select gas units in response to favorable market conditions and Martin Lake Unit 1 return to service.

Showing the first 60 of 97 changed paragraphs. The complete comparison will be part of Pro (coming soon). Meanwhile you can read the full text in the original filing.

VST insider buying and selling (Form 4)

Since 2026-04-11, insiders reported open-market purchases in 2 Form 4 filings (1 insider, 3 trade dates, 8,665 shares, about $1.2M) and open-market sales in 9 filings (7 insiders, 8 trade dates, 143,254 shares, about $22.6M; 7 of these filings say the sales were made under a Rule 10b5-1 trading plan). Net open-market shares: -134,589 (purchases minus sales); net value about -$21.4M.Totals add up every open-market (code P and S) line in those filings, using the prices reported in the filings. Awards, option exercises, tax withholding and gifts are listed below but not counted.

Trade dateInsiderTransactionSharesPriceValueOwned afterFiling
2026-10-06Hudson Scott A
EVP & President Vistra Retail
Open-market sale
10b5-1 plan
22,222$160.14 $3.6M308,915 SEC
2026-09-08Moldovan Kristopher E.
EVP and CFO
Open-market sale
10b5-1 plan
20,000$151.03 $3.0M199,044 SEC
2026-09-08Hudson Scott A
EVP & President Vistra Retail
Open-market sale
10b5-1 plan
7,841$152.56 $1.2M331,137 SEC
2026-09-08Hudson Scott A
EVP & President Vistra Retail
Open-market sale
10b5-1 plan
28,826$151.85 $4.4M338,978 SEC
2026-09-08Hudson Scott A
EVP & President Vistra Retail
Open-market sale
10b5-1 plan
7,777$150.97 $1.2M367,804 SEC
2026-09-01Burke James A
Director, President and CEO
Open-market purchase 4,465$135.25 $603.9K1,146,352 SEC
2026-08-31Burke James A
Director, President and CEO
Open-market purchase 2,200$135.99 $299.2K1,141,887 SEC
2026-08-24Burke James A
Director, President and CEO
Open-market purchase 2,000$135.00 $270.0K1,139,687 SEC
2026-06-18Sult John R
Director
Open-market sale
10b5-1 plan
6,500$170.00 $1.1M70,714 SEC
2026-06-18Acosta Arcilia
Director
Open-market sale
10b5-1 plan
7,500$165.04 $1.2M40,107 SEC
2026-06-18Acosta Arcilia
Director
Open-market sale
10b5-1 plan
7,500$170.00 $1.3M32,607 SEC
2026-06-16Helm Scott B
Director
Open-market sale
10b5-1 plan
25,000$160.00 $4.0M232,200 SEC
2026-06-15Barbas Paul M
Director
Open-market sale
10b5-1 plan
244$153.00 $37.3K53,006 SEC
2026-06-12Barbas Paul M
Director
Open-market sale
10b5-1 plan
244$147.93 $36.1K53,250 SEC
2026-06-02Montemayor Margaret
SVP, Chief Accounting Officer
Open-market sale 4,600$160.00 $736.0K9,760 SEC
2026-05-27Montemayor Margaret
SVP, Chief Accounting Officer
Open-market sale 5,000$164.96 $824.8K14,360 SEC
2026-05-15Sult John R
Director
Grant/award 1,268— —77,214 SEC
2026-05-15Pitesa John William
Director
Grant/award 1,268— —5,898 SEC
2026-05-15Helm Scott B
Director
Grant/award 2,008— —257,200 SEC
2026-05-15Barbas Paul M
Director
Grant/award 1,268— —53,494 SEC
2026-05-15Crutchfield Lisa
Director
Grant/award 1,268— —34,618 SEC
2026-05-15Baiera Gavin R.
Director
Grant/award 1,268— —51,641 SEC
2026-05-15Acosta Arcilia
Director
Grant/award 1,268— —47,607 SEC
2026-05-15Ackermann Hilary E.
Director
Grant/award 1,268— —68,852 SEC
2026-05-15Walters Robert Charles
Director
Grant/award 1,268— —2,431 SEC
2026-05-15Lagacy Julie A.
Director
Grant/award 1,268— —21,321 SEC

Well-known investors holding VST (13F)

InvestorQuarterSharesReported value% of their 13FChange vs prior quarter
Lone Pine Capital (Stephen Mandel) COM2026-06-306,187,585$930.2M—Sold out
Appaloosa (David Tepper) COM2026-06-302,215,272$351.4M4.7%Added 10%
Point72 Asset Management (Steve Cohen) COM2026-06-301,478,465$234.5M0.36%Added 61%
D. E. Shaw & Co. COM2026-06-30848,413$134.6M0.08%Added 218%
Renaissance Technologies COM2026-06-30765,275$121.4M0.17%Reduced 28%
Bridgewater Associates COM2026-06-30751,695$119.2M0.49%Added 116%
Millennium Management (Israel Englander) COM2026-06-30528,309$83.8M0.06%Added 70%
Citadel Advisors (Ken Griffin) COM2026-06-30391,939$62.2M0.04%Reduced 51%
AQR Capital Management (Cliff Asness) COM2026-06-30289,921$46.0M0.02%Added 91%
Gotham Asset Management (Joel Greenblatt) COM2026-06-30152,221$24.1M0.06%Added 24%
Two Sigma Investments COM2026-06-3034,318$5.4M0.0%Reduced 13%
Soros Fund Management COM2026-06-304,223$669.9K0.01%Reduced 98%

13F reports are filed up to 45 days after quarter end and show long U.S. equity positions only; options positions are omitted here.

Coming soon: email alerts when VST files, watchlists and downloadable comparisons.